Chen Yu, Yang Shun-sheng, Gong Zhengjun, W. Dongmei
{"title":"加成反应处理甲醛废水的研究","authors":"Chen Yu, Yang Shun-sheng, Gong Zhengjun, W. Dongmei","doi":"10.1109/CESCE.2010.90","DOIUrl":null,"url":null,"abstract":"The best experimental factors were achieved through the single factor experiment and orthogonal experiment. When the initial concentration of formaldehyde was 120mg/L, reaction time was 30 minutes and the ratio between amount of sodium bisulfite and formaldehyde was 3:1, the removal rate of formaldehyde was approximately up to 100%, which fully satisfied the national emission standards (the concentration of formaldehyde≤ 1mg/L). The actual wastewater project was verified according to these factors. The tannery wastewater containing formaldehyde which the initial concentration of formaldehyde was 120mg /L was reacted with sodium bisulfite. The concentration of remaining formaldehyde was reduced to 0.446mg/L 30 minutes later, which fully satisfied the national emission standard. The process was practicable.","PeriodicalId":6371,"journal":{"name":"2010 International Conference on Challenges in Environmental Science and Computer Engineering","volume":"72 1","pages":"293-296"},"PeriodicalIF":0.0000,"publicationDate":"2010-03-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"Study on the Treatment of Formaldehyde Wastewater by Addition Reaction\",\"authors\":\"Chen Yu, Yang Shun-sheng, Gong Zhengjun, W. Dongmei\",\"doi\":\"10.1109/CESCE.2010.90\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The best experimental factors were achieved through the single factor experiment and orthogonal experiment. When the initial concentration of formaldehyde was 120mg/L, reaction time was 30 minutes and the ratio between amount of sodium bisulfite and formaldehyde was 3:1, the removal rate of formaldehyde was approximately up to 100%, which fully satisfied the national emission standards (the concentration of formaldehyde≤ 1mg/L). The actual wastewater project was verified according to these factors. The tannery wastewater containing formaldehyde which the initial concentration of formaldehyde was 120mg /L was reacted with sodium bisulfite. The concentration of remaining formaldehyde was reduced to 0.446mg/L 30 minutes later, which fully satisfied the national emission standard. The process was practicable.\",\"PeriodicalId\":6371,\"journal\":{\"name\":\"2010 International Conference on Challenges in Environmental Science and Computer Engineering\",\"volume\":\"72 1\",\"pages\":\"293-296\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-03-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2010 International Conference on Challenges in Environmental Science and Computer Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CESCE.2010.90\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 International Conference on Challenges in Environmental Science and Computer Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CESCE.2010.90","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Study on the Treatment of Formaldehyde Wastewater by Addition Reaction
The best experimental factors were achieved through the single factor experiment and orthogonal experiment. When the initial concentration of formaldehyde was 120mg/L, reaction time was 30 minutes and the ratio between amount of sodium bisulfite and formaldehyde was 3:1, the removal rate of formaldehyde was approximately up to 100%, which fully satisfied the national emission standards (the concentration of formaldehyde≤ 1mg/L). The actual wastewater project was verified according to these factors. The tannery wastewater containing formaldehyde which the initial concentration of formaldehyde was 120mg /L was reacted with sodium bisulfite. The concentration of remaining formaldehyde was reduced to 0.446mg/L 30 minutes later, which fully satisfied the national emission standard. The process was practicable.