PV-STATCOM应用的技术成本

L. F. N. Lourenço, M. B. de Camargo Salles, R. Monaro, L. Quéval
{"title":"PV-STATCOM应用的技术成本","authors":"L. F. N. Lourenço, M. B. de Camargo Salles, R. Monaro, L. Quéval","doi":"10.1109/ICRERA.2017.8191118","DOIUrl":null,"url":null,"abstract":"In daytime operation the power converter of a photovoltaic installation is generally used below its rated power. It could then provide reactive power support to the grid. This operation is called PV-STATCOM. This work provides an evaluation of the technical cost of operating a PV-STATCOM during daytime. This technical cost is due to the need of buying active power from the grid to supply extra losses when providing reactive power support to the grid. To illustrate, a 1.5 MWp PV farm is modeled in Matlab/Simulink toolbox SimPowerSystems. Losses from all the PV-STATCOM components are evaluated (converter, tie reactor, filter and step-up transformer). The daytime technical cost can reach up to 5.0% of the system rated capacity with the power converter being the main source of losses in PV-STATCOM operation. Finally, the reactive power support capability map is obtained as a function of the solar irradiance.","PeriodicalId":6535,"journal":{"name":"2017 IEEE 6th International Conference on Renewable Energy Research and Applications (ICRERA)","volume":"24 1","pages":"534-538"},"PeriodicalIF":0.0000,"publicationDate":"2017-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"Technical cost of PV-STATCOM applications\",\"authors\":\"L. F. N. Lourenço, M. B. de Camargo Salles, R. Monaro, L. Quéval\",\"doi\":\"10.1109/ICRERA.2017.8191118\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In daytime operation the power converter of a photovoltaic installation is generally used below its rated power. It could then provide reactive power support to the grid. This operation is called PV-STATCOM. This work provides an evaluation of the technical cost of operating a PV-STATCOM during daytime. This technical cost is due to the need of buying active power from the grid to supply extra losses when providing reactive power support to the grid. To illustrate, a 1.5 MWp PV farm is modeled in Matlab/Simulink toolbox SimPowerSystems. Losses from all the PV-STATCOM components are evaluated (converter, tie reactor, filter and step-up transformer). The daytime technical cost can reach up to 5.0% of the system rated capacity with the power converter being the main source of losses in PV-STATCOM operation. Finally, the reactive power support capability map is obtained as a function of the solar irradiance.\",\"PeriodicalId\":6535,\"journal\":{\"name\":\"2017 IEEE 6th International Conference on Renewable Energy Research and Applications (ICRERA)\",\"volume\":\"24 1\",\"pages\":\"534-538\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2017 IEEE 6th International Conference on Renewable Energy Research and Applications (ICRERA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICRERA.2017.8191118\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 IEEE 6th International Conference on Renewable Energy Research and Applications (ICRERA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICRERA.2017.8191118","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

摘要

在白天运行时,光伏装置的功率转换器通常低于其额定功率。然后,它可以为电网提供无功支持。这个操作称为PV-STATCOM。这项工作提供了在白天运行PV-STATCOM的技术成本评估。这一技术成本是由于在向电网提供无功支持时,需要从电网购买有功电源来弥补额外的损耗。为了说明这一点,在Matlab/Simulink工具箱SimPowerSystems中对1.5 MWp光伏发电厂进行了建模。评估所有PV-STATCOM组件的损耗(转换器、电抗器、滤波器和升压变压器)。白天的技术成本可达系统额定容量的5.0%,电源转换器是PV-STATCOM运行中损耗的主要来源。最后,得到了随太阳辐照度变化的无功保障能力图。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Technical cost of PV-STATCOM applications
In daytime operation the power converter of a photovoltaic installation is generally used below its rated power. It could then provide reactive power support to the grid. This operation is called PV-STATCOM. This work provides an evaluation of the technical cost of operating a PV-STATCOM during daytime. This technical cost is due to the need of buying active power from the grid to supply extra losses when providing reactive power support to the grid. To illustrate, a 1.5 MWp PV farm is modeled in Matlab/Simulink toolbox SimPowerSystems. Losses from all the PV-STATCOM components are evaluated (converter, tie reactor, filter and step-up transformer). The daytime technical cost can reach up to 5.0% of the system rated capacity with the power converter being the main source of losses in PV-STATCOM operation. Finally, the reactive power support capability map is obtained as a function of the solar irradiance.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信