{"title":"最小化机器人装配系统的生产成本","authors":"Maged M. Dessouky, James R. Wilson","doi":"10.1016/0167-188X(91)90021-S","DOIUrl":null,"url":null,"abstract":"<div><p>The objective of this study is to minimize the expected present worth of the production costs incurred over the operational life of a robotic assembly system that is integrated with an Automatic Storage/Retrieval System (AS/RS). Production costs include inventory cost and capital cost of equipment. Inventory cost consists of ordering, holding, and lostproduction costs; and all of these costs depend on the scheduling policy for the assembly robots as well as the inventory policy for the AS/RS. Capital cost of equipment depends on the number of depalletizer robots and the number of assembly robots. To identify the minimum-cost design for a certain automotive assembly operation from a given set of alternative system configurations, we present a simulation experiment in which independent replications of each alternative are controlled by a statistical ranking-and-selection procedure that has been adapted to simulation.</p></div>","PeriodicalId":100476,"journal":{"name":"Engineering Costs and Production Economics","volume":"21 1","pages":"Pages 81-92"},"PeriodicalIF":0.0000,"publicationDate":"1991-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0167-188X(91)90021-S","citationCount":"6","resultStr":"{\"title\":\"Minimizing production costs for a robotic assembly system\",\"authors\":\"Maged M. Dessouky, James R. Wilson\",\"doi\":\"10.1016/0167-188X(91)90021-S\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>The objective of this study is to minimize the expected present worth of the production costs incurred over the operational life of a robotic assembly system that is integrated with an Automatic Storage/Retrieval System (AS/RS). Production costs include inventory cost and capital cost of equipment. Inventory cost consists of ordering, holding, and lostproduction costs; and all of these costs depend on the scheduling policy for the assembly robots as well as the inventory policy for the AS/RS. Capital cost of equipment depends on the number of depalletizer robots and the number of assembly robots. To identify the minimum-cost design for a certain automotive assembly operation from a given set of alternative system configurations, we present a simulation experiment in which independent replications of each alternative are controlled by a statistical ranking-and-selection procedure that has been adapted to simulation.</p></div>\",\"PeriodicalId\":100476,\"journal\":{\"name\":\"Engineering Costs and Production Economics\",\"volume\":\"21 1\",\"pages\":\"Pages 81-92\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1991-02-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1016/0167-188X(91)90021-S\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Engineering Costs and Production Economics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/0167188X9190021S\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering Costs and Production Economics","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/0167188X9190021S","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Minimizing production costs for a robotic assembly system
The objective of this study is to minimize the expected present worth of the production costs incurred over the operational life of a robotic assembly system that is integrated with an Automatic Storage/Retrieval System (AS/RS). Production costs include inventory cost and capital cost of equipment. Inventory cost consists of ordering, holding, and lostproduction costs; and all of these costs depend on the scheduling policy for the assembly robots as well as the inventory policy for the AS/RS. Capital cost of equipment depends on the number of depalletizer robots and the number of assembly robots. To identify the minimum-cost design for a certain automotive assembly operation from a given set of alternative system configurations, we present a simulation experiment in which independent replications of each alternative are controlled by a statistical ranking-and-selection procedure that has been adapted to simulation.