{"title":"当前程序评估的替代方案","authors":"Paul H. Rigby","doi":"10.1016/0147-8001(78)90023-2","DOIUrl":null,"url":null,"abstract":"<div><p>A critical problem in the evaluation of public programs is their nonutilization by managers of the program. There are a variety of reasons given for the nonutilization of these evaluations which, however, may be symptomatic of three basic problems: the conception, organization and management of the programs. Because of the problems characteristic of public programs, this paper proposes that the responsibility for evaluation should be assigned to program management and that outside evaluators be used to audit management's evaluation. Such an approach, besides improving the process of evaluation, could also significantly improve the information used by management to operate a program since much of the information for evaluation and program management is similar. The evaluation proposed goes beyond simply making public what programs do and how money is spent. It would indicate impact on program goals.</p></div>","PeriodicalId":101267,"journal":{"name":"Urban Systems","volume":"3 2","pages":"Pages 151-159"},"PeriodicalIF":0.0000,"publicationDate":"1978-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0147-8001(78)90023-2","citationCount":"0","resultStr":"{\"title\":\"An alternative to current program evaluations\",\"authors\":\"Paul H. Rigby\",\"doi\":\"10.1016/0147-8001(78)90023-2\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>A critical problem in the evaluation of public programs is their nonutilization by managers of the program. There are a variety of reasons given for the nonutilization of these evaluations which, however, may be symptomatic of three basic problems: the conception, organization and management of the programs. Because of the problems characteristic of public programs, this paper proposes that the responsibility for evaluation should be assigned to program management and that outside evaluators be used to audit management's evaluation. Such an approach, besides improving the process of evaluation, could also significantly improve the information used by management to operate a program since much of the information for evaluation and program management is similar. The evaluation proposed goes beyond simply making public what programs do and how money is spent. It would indicate impact on program goals.</p></div>\",\"PeriodicalId\":101267,\"journal\":{\"name\":\"Urban Systems\",\"volume\":\"3 2\",\"pages\":\"Pages 151-159\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1978-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1016/0147-8001(78)90023-2\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Urban Systems\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/0147800178900232\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Urban Systems","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/0147800178900232","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

评估公共项目的一个关键问题是项目管理者不利用公共项目。有各种各样的原因给出了不利用这些评估,然而,可能是三个基本问题的症状:概念,组织和管理的计划。针对公共项目存在的问题特点,本文提出将评价责任下放给项目管理部门,并由外部评价人员对管理部门的评价进行审计。这种方法,除了改进评价过程之外,还可以显著地改进管理人员用于操作项目的信息,因为用于评价和项目管理的许多信息是相似的。提议的评估不仅仅是公开项目的作用和资金的使用方式。它将表明对项目目标的影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
An alternative to current program evaluations

A critical problem in the evaluation of public programs is their nonutilization by managers of the program. There are a variety of reasons given for the nonutilization of these evaluations which, however, may be symptomatic of three basic problems: the conception, organization and management of the programs. Because of the problems characteristic of public programs, this paper proposes that the responsibility for evaluation should be assigned to program management and that outside evaluators be used to audit management's evaluation. Such an approach, besides improving the process of evaluation, could also significantly improve the information used by management to operate a program since much of the information for evaluation and program management is similar. The evaluation proposed goes beyond simply making public what programs do and how money is spent. It would indicate impact on program goals.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信