具有资源分配和广义早/迟处罚的单机窗口分配调度

Yu Tian
{"title":"具有资源分配和广义早/迟处罚的单机窗口分配调度","authors":"Yu Tian","doi":"10.1142/s021759592150041x","DOIUrl":null,"url":null,"abstract":"In this study, the due-window assignment single-machine scheduling problem with resource allocation is considered, where the processing time of a job is controllable as a linear or convex function of amount of resource allocated to the job. Under common due-window and slack due-window assignments, our goal is to determine the optimal sequence of all jobs, the due-window start time, due-window size, and optimal resource allocation such that a sum of the scheduling cost (including weighted earliness/tardiness penalty, weighted number of early and tardy job, weighted due-window start time, and due-window size) and resource consumption cost is minimized. We analyze the optimality properties, and provide polynomial time solutions to solve the problem under four versions of due-window assignment and resource allocation function.","PeriodicalId":8478,"journal":{"name":"Asia Pac. J. Oper. Res.","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2021-09-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Single-Machine Due-Window Assignment Scheduling with Resource Allocation and Generalized Earliness/Tardiness Penalties\",\"authors\":\"Yu Tian\",\"doi\":\"10.1142/s021759592150041x\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this study, the due-window assignment single-machine scheduling problem with resource allocation is considered, where the processing time of a job is controllable as a linear or convex function of amount of resource allocated to the job. Under common due-window and slack due-window assignments, our goal is to determine the optimal sequence of all jobs, the due-window start time, due-window size, and optimal resource allocation such that a sum of the scheduling cost (including weighted earliness/tardiness penalty, weighted number of early and tardy job, weighted due-window start time, and due-window size) and resource consumption cost is minimized. We analyze the optimality properties, and provide polynomial time solutions to solve the problem under four versions of due-window assignment and resource allocation function.\",\"PeriodicalId\":8478,\"journal\":{\"name\":\"Asia Pac. J. Oper. Res.\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-09-08\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Asia Pac. J. Oper. Res.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1142/s021759592150041x\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Asia Pac. J. Oper. Res.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1142/s021759592150041x","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

本研究考虑具有资源分配的双窗口分配单机调度问题,其中作业的处理时间可作为分配给作业的资源量的线性或凸函数来控制。在普通延迟窗口和松弛延迟窗口分配下,我们的目标是确定所有作业的最优顺序、延迟窗口开始时间、延迟窗口大小和最优资源分配,从而使调度成本(包括加权早/迟到惩罚、加权早/延迟作业数、加权延迟窗口开始时间和延迟窗口大小)和资源消耗成本的总和最小。分析了该问题的最优性,给出了四种版本的窗口分配和资源分配函数下的多项式时间解。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Single-Machine Due-Window Assignment Scheduling with Resource Allocation and Generalized Earliness/Tardiness Penalties
In this study, the due-window assignment single-machine scheduling problem with resource allocation is considered, where the processing time of a job is controllable as a linear or convex function of amount of resource allocated to the job. Under common due-window and slack due-window assignments, our goal is to determine the optimal sequence of all jobs, the due-window start time, due-window size, and optimal resource allocation such that a sum of the scheduling cost (including weighted earliness/tardiness penalty, weighted number of early and tardy job, weighted due-window start time, and due-window size) and resource consumption cost is minimized. We analyze the optimality properties, and provide polynomial time solutions to solve the problem under four versions of due-window assignment and resource allocation function.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信