{"title":"限制BIM在发展中国家实施的根本因素:以土耳其AEC行业为例","authors":"Seda Tan, Gulden Gumusburun Ayalp","doi":"10.1108/ohi-12-2021-0273","DOIUrl":null,"url":null,"abstract":"PurposeDespite several advantages of Building Information Modelling (BIM) technology, BIM has not been adopted and implemented extensively in developing countries. Consequently BIM remains at a beginner level in developing countries. To increase the level of BIM implementation, first, knowing the root factors that resist BIM implementation is necessary to know. Therefore, the objective of this study was to identify the factors that limit BIM implementation in developing countries, specifically in the Turkish Architecture, Engineering and Construction (AEC) industry.Design/methodology/approachA questionnaire was designed with 46 influencing causes (ICs) identified through a systematic literature review. In total, 141 survey results were returned from architects and engineers, and reliability analysis, exploratory factor analysis, and confirmatory factor analysis were conducted. Furthermore, a structural equation model (SEM) was developed to identify the root factors of BIM implementation.FindingsEight root factors affecting the prevalent use of BIM technology in the Turkish construction industry were determined and grouped into three categories based on BIM implementation level. Problems with the BIM transition process and a lack of management support are the most influential root factors limiting BIM implementation. Lack of incentives, lack of BIM education, bias regarding BIM technology and BIM-based software problems form the second group of root factors that have a significant effect. Awareness and lack of communication amongst stakeholders were identified as root factors that had a moderate effect.Research limitations/implicationsThis study contributes to the knowledge body by revealing eight root factors limiting BIM implementation in the Turkish AEC industry which can be generalised to most developing countries. Therefore, the outcomes of this study may be used as a practical reference for future research aimed at improving BIM adoption in developing countries through governmental, educational, and managerial solutions.Originality/valueSeveral studies have identified the challenges and barriers of BIM implementation in the construction industry using qualitative and quantitative analyses and projected the current state. Unlike previous studies, this study comprehensively and quantitatively determined the root factors that constrain the use of BIM in Turkey using exploratory factor analysis, confirmatory factor analysis, and structural equation modelling to present a structural model.","PeriodicalId":44969,"journal":{"name":"Open House International","volume":"7 1","pages":""},"PeriodicalIF":1.5000,"publicationDate":"2022-06-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Root factors limiting BIM implementation in developing countries: sampling the Turkish AEC industry\",\"authors\":\"Seda Tan, Gulden Gumusburun Ayalp\",\"doi\":\"10.1108/ohi-12-2021-0273\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"PurposeDespite several advantages of Building Information Modelling (BIM) technology, BIM has not been adopted and implemented extensively in developing countries. Consequently BIM remains at a beginner level in developing countries. To increase the level of BIM implementation, first, knowing the root factors that resist BIM implementation is necessary to know. Therefore, the objective of this study was to identify the factors that limit BIM implementation in developing countries, specifically in the Turkish Architecture, Engineering and Construction (AEC) industry.Design/methodology/approachA questionnaire was designed with 46 influencing causes (ICs) identified through a systematic literature review. In total, 141 survey results were returned from architects and engineers, and reliability analysis, exploratory factor analysis, and confirmatory factor analysis were conducted. Furthermore, a structural equation model (SEM) was developed to identify the root factors of BIM implementation.FindingsEight root factors affecting the prevalent use of BIM technology in the Turkish construction industry were determined and grouped into three categories based on BIM implementation level. Problems with the BIM transition process and a lack of management support are the most influential root factors limiting BIM implementation. Lack of incentives, lack of BIM education, bias regarding BIM technology and BIM-based software problems form the second group of root factors that have a significant effect. Awareness and lack of communication amongst stakeholders were identified as root factors that had a moderate effect.Research limitations/implicationsThis study contributes to the knowledge body by revealing eight root factors limiting BIM implementation in the Turkish AEC industry which can be generalised to most developing countries. Therefore, the outcomes of this study may be used as a practical reference for future research aimed at improving BIM adoption in developing countries through governmental, educational, and managerial solutions.Originality/valueSeveral studies have identified the challenges and barriers of BIM implementation in the construction industry using qualitative and quantitative analyses and projected the current state. Unlike previous studies, this study comprehensively and quantitatively determined the root factors that constrain the use of BIM in Turkey using exploratory factor analysis, confirmatory factor analysis, and structural equation modelling to present a structural model.\",\"PeriodicalId\":44969,\"journal\":{\"name\":\"Open House International\",\"volume\":\"7 1\",\"pages\":\"\"},\"PeriodicalIF\":1.5000,\"publicationDate\":\"2022-06-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Open House International\",\"FirstCategoryId\":\"96\",\"ListUrlMain\":\"https://doi.org/10.1108/ohi-12-2021-0273\",\"RegionNum\":4,\"RegionCategory\":\"经济学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"0\",\"JCRName\":\"ARCHITECTURE\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Open House International","FirstCategoryId":"96","ListUrlMain":"https://doi.org/10.1108/ohi-12-2021-0273","RegionNum":4,"RegionCategory":"经济学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"0","JCRName":"ARCHITECTURE","Score":null,"Total":0}
引用次数: 3

摘要

尽管建筑信息模型(BIM)技术有几个优点,但BIM尚未在发展中国家得到广泛采用和实施。因此,BIM在发展中国家仍处于初级水平。要提高BIM的实施水平,首先要了解阻碍BIM实施的根源因素。因此,本研究的目的是确定限制BIM在发展中国家实施的因素,特别是在土耳其建筑、工程和施工(AEC)行业。设计/方法/方法设计了一份问卷,通过系统的文献综述确定了46个影响因素(ic)。建筑师和工程师共反馈了141份调查结果,并进行了信度分析、探索性因素分析和验证性因素分析。此外,还开发了结构方程模型(SEM)来确定BIM实施的根本因素。根据BIM的实施水平,确定了影响BIM技术在土耳其建筑业普遍使用的8个根本因素,并将其分为三类。BIM过渡过程中的问题和缺乏管理支持是限制BIM实施的最具影响力的根本因素。缺乏激励、缺乏BIM教育、对BIM技术的偏见以及基于BIM的软件问题构成了第二组影响显著的根本因素。利益相关者之间的意识和缺乏沟通被确定为影响中等的根本因素。本研究揭示了限制BIM在土耳其AEC行业实施的八个根本因素,这些因素可以推广到大多数发展中国家,从而为知识体系做出了贡献。因此,本研究的结果可以作为未来研究的实用参考,旨在通过政府、教育和管理解决方案提高发展中国家BIM的采用。一些研究已经通过定性和定量分析确定了BIM在建筑行业实施的挑战和障碍,并预测了当前的状态。与以往的研究不同,本研究通过探索性因素分析、验证性因素分析和结构方程建模,全面定量地确定了制约BIM在土耳其使用的根本因素,并给出了一个结构模型。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Root factors limiting BIM implementation in developing countries: sampling the Turkish AEC industry
PurposeDespite several advantages of Building Information Modelling (BIM) technology, BIM has not been adopted and implemented extensively in developing countries. Consequently BIM remains at a beginner level in developing countries. To increase the level of BIM implementation, first, knowing the root factors that resist BIM implementation is necessary to know. Therefore, the objective of this study was to identify the factors that limit BIM implementation in developing countries, specifically in the Turkish Architecture, Engineering and Construction (AEC) industry.Design/methodology/approachA questionnaire was designed with 46 influencing causes (ICs) identified through a systematic literature review. In total, 141 survey results were returned from architects and engineers, and reliability analysis, exploratory factor analysis, and confirmatory factor analysis were conducted. Furthermore, a structural equation model (SEM) was developed to identify the root factors of BIM implementation.FindingsEight root factors affecting the prevalent use of BIM technology in the Turkish construction industry were determined and grouped into three categories based on BIM implementation level. Problems with the BIM transition process and a lack of management support are the most influential root factors limiting BIM implementation. Lack of incentives, lack of BIM education, bias regarding BIM technology and BIM-based software problems form the second group of root factors that have a significant effect. Awareness and lack of communication amongst stakeholders were identified as root factors that had a moderate effect.Research limitations/implicationsThis study contributes to the knowledge body by revealing eight root factors limiting BIM implementation in the Turkish AEC industry which can be generalised to most developing countries. Therefore, the outcomes of this study may be used as a practical reference for future research aimed at improving BIM adoption in developing countries through governmental, educational, and managerial solutions.Originality/valueSeveral studies have identified the challenges and barriers of BIM implementation in the construction industry using qualitative and quantitative analyses and projected the current state. Unlike previous studies, this study comprehensively and quantitatively determined the root factors that constrain the use of BIM in Turkey using exploratory factor analysis, confirmatory factor analysis, and structural equation modelling to present a structural model.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
2.30
自引率
18.20%
发文量
48
期刊介绍: The journal of an association of institues and individuals concerned with housing, design and development in the built environment. Theories, tools and pratice with special emphasis on the local scale.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信