{"title":"运用模糊层次分析法和模糊TOPSIS法对项目组合进行最佳选择","authors":"M. Anisseh, F. Hemmati, Reza Shahraki Mohammad","doi":"10.5937/JEMC1801003A","DOIUrl":null,"url":null,"abstract":"Choosing the optimal portfolio for the project is one of the most important and strategic decisions in most organizations, especially project-based organizations. The issue of the project selection is a periodic activity in order to choose the appropriate and optimal portfolio from the proposed projects and ongoing projects within the organization which can meet organizational goals without waste of the resources and taking into account certain constraints. Consequently, the aim of this paper is to select the best project portfolio by using fuzzy AHP and fuzzy TOPSIS methods. The forgoing methods have been used in a case study, and the result and data have been evaluated from different points of view.","PeriodicalId":31704,"journal":{"name":"Journal of Engineering Management and Competitiveness","volume":"16 1","pages":"3-10"},"PeriodicalIF":0.0000,"publicationDate":"2018-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Best selection of project portfolio using Fuzzy AHP and Fuzzy TOPSIS\",\"authors\":\"M. Anisseh, F. Hemmati, Reza Shahraki Mohammad\",\"doi\":\"10.5937/JEMC1801003A\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Choosing the optimal portfolio for the project is one of the most important and strategic decisions in most organizations, especially project-based organizations. The issue of the project selection is a periodic activity in order to choose the appropriate and optimal portfolio from the proposed projects and ongoing projects within the organization which can meet organizational goals without waste of the resources and taking into account certain constraints. Consequently, the aim of this paper is to select the best project portfolio by using fuzzy AHP and fuzzy TOPSIS methods. The forgoing methods have been used in a case study, and the result and data have been evaluated from different points of view.\",\"PeriodicalId\":31704,\"journal\":{\"name\":\"Journal of Engineering Management and Competitiveness\",\"volume\":\"16 1\",\"pages\":\"3-10\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Engineering Management and Competitiveness\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5937/JEMC1801003A\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Engineering Management and Competitiveness","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5937/JEMC1801003A","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Best selection of project portfolio using Fuzzy AHP and Fuzzy TOPSIS
Choosing the optimal portfolio for the project is one of the most important and strategic decisions in most organizations, especially project-based organizations. The issue of the project selection is a periodic activity in order to choose the appropriate and optimal portfolio from the proposed projects and ongoing projects within the organization which can meet organizational goals without waste of the resources and taking into account certain constraints. Consequently, the aim of this paper is to select the best project portfolio by using fuzzy AHP and fuzzy TOPSIS methods. The forgoing methods have been used in a case study, and the result and data have been evaluated from different points of view.