考虑技术设备可靠性的母线传动装置维修时间的定义

S. Bulatov
{"title":"考虑技术设备可靠性的母线传动装置维修时间的定义","authors":"S. Bulatov","doi":"10.30987/1999-8775-2020-9-28-33","DOIUrl":null,"url":null,"abstract":"The paper purpose is the effectiveness estimation in the technological equipment use, taking into account its reliability and productivity for defective transmission units of buses. \nThe problem consists in the determination of time to be spent on repair of bus transmission units taking into account technological equipment reliability. In the paper there is used a probabilistic method for the prediction bus transmission units, and also a method of the dynamics of averages which allow ensuring minimum of costs for units downtime during repair and equipment cost. The need for repair of transmission units (gear box) arises on an average after 650 hours, the average productivity of the bench makes 4.2 bus / hour. The bench fails on the average after 4600 hours of work, the average time of the bench makes 2 hours. In such a way the solution of the problem specified allows analyzing the necessity of time decrease for transmission unit repair to avoid long downtimes of buses in repair areas without negative impact upon high repair quality and safety during the further operation.","PeriodicalId":9358,"journal":{"name":"Bulletin of Bryansk state technical university","volume":"67 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2020-09-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"DEFINITION OF TIME SPENT ON REPAIR OF BUS TRANSMISSION UNITS TAKING INTO ACCOUNT TECHNOLOGICAL EQUIPMENT RELIABILITY\",\"authors\":\"S. Bulatov\",\"doi\":\"10.30987/1999-8775-2020-9-28-33\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The paper purpose is the effectiveness estimation in the technological equipment use, taking into account its reliability and productivity for defective transmission units of buses. \\nThe problem consists in the determination of time to be spent on repair of bus transmission units taking into account technological equipment reliability. In the paper there is used a probabilistic method for the prediction bus transmission units, and also a method of the dynamics of averages which allow ensuring minimum of costs for units downtime during repair and equipment cost. The need for repair of transmission units (gear box) arises on an average after 650 hours, the average productivity of the bench makes 4.2 bus / hour. The bench fails on the average after 4600 hours of work, the average time of the bench makes 2 hours. In such a way the solution of the problem specified allows analyzing the necessity of time decrease for transmission unit repair to avoid long downtimes of buses in repair areas without negative impact upon high repair quality and safety during the further operation.\",\"PeriodicalId\":9358,\"journal\":{\"name\":\"Bulletin of Bryansk state technical university\",\"volume\":\"67 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-09-17\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Bulletin of Bryansk state technical university\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.30987/1999-8775-2020-9-28-33\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Bulletin of Bryansk state technical university","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30987/1999-8775-2020-9-28-33","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文的目的是在考虑故障母线传动装置的可靠性和生产率的情况下,对工艺设备的使用进行有效性评估。问题在于在考虑工艺设备可靠性的情况下确定母线传动装置的维修时间。本文采用概率法对母线传动单元进行预测,并采用动态平均法,保证了维修期间机组停机成本和设备成本的最小值。传动装置(齿轮箱)的维修需求平均在650小时后出现,工作台的平均生产率为4.2客车/小时。平均工作4600小时后,工作台失效,平均使用时间为2小时。通过对问题的求解,分析了减少传动单元维修时间的必要性,避免了维修区域内母线长时间停机,同时又不影响后续运行时的高维修质量和安全。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
DEFINITION OF TIME SPENT ON REPAIR OF BUS TRANSMISSION UNITS TAKING INTO ACCOUNT TECHNOLOGICAL EQUIPMENT RELIABILITY
The paper purpose is the effectiveness estimation in the technological equipment use, taking into account its reliability and productivity for defective transmission units of buses. The problem consists in the determination of time to be spent on repair of bus transmission units taking into account technological equipment reliability. In the paper there is used a probabilistic method for the prediction bus transmission units, and also a method of the dynamics of averages which allow ensuring minimum of costs for units downtime during repair and equipment cost. The need for repair of transmission units (gear box) arises on an average after 650 hours, the average productivity of the bench makes 4.2 bus / hour. The bench fails on the average after 4600 hours of work, the average time of the bench makes 2 hours. In such a way the solution of the problem specified allows analyzing the necessity of time decrease for transmission unit repair to avoid long downtimes of buses in repair areas without negative impact upon high repair quality and safety during the further operation.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信