FPSO在任意水域的高效锚泊系统

J. B. Araujo, A. C. Fernandes, J. S. Sales, Mario Jorge C. dos Santos, Ana Clara Thurler
{"title":"FPSO在任意水域的高效锚泊系统","authors":"J. B. Araujo, A. C. Fernandes, J. S. Sales, Mario Jorge C. dos Santos, Ana Clara Thurler","doi":"10.1115/omae2019-96575","DOIUrl":null,"url":null,"abstract":"\n Oil offshore Brazil, as well as in other continents, has demanded floating units for oil production. Typical anchored production units are the semi-submersible platforms, FPSO, Spar Buoys and TLPs. All of them use several anchoring lines for station keeping.\n In the offshore Brazil scenario, the last twelve years the FPSOs adopts the torpedo piles and polyester ropes in the anchoring lines in deep and ultra-deep waters. The FPSO “Cidade de Angra dos Reis” was the first to operate in pre-salt area in October 2010. From then on, it became common the production units with VLCC size, oil production of 150,000 barrels per day and 24 anchoring lines. The reason for such large number of anchors is the 1,200 tonnes torpedo piles holding power restriction.\n The proposition developed in this paper reduces the number of anchor lines using well know offshore equipment such as: driven piles, mooring chains, polyester ropes and conventional anchoring deck equipment. The main difference is the use of driven piles with holding power above 1,800 tonnes and anchor lines with a breaking strength of more than 2,000 tonnes. It is shown that a decrease of number of anchoring lines from 24 to 12 can be achieved. Consequently, it will decrease also the space occupied by the anchoring lines in the seabed by reducing the subsea layout of risers, flow lines and well head. This allows a technical and economical scenario more feasible when compared with the currently used on the Brazilian oil & gas market.","PeriodicalId":23567,"journal":{"name":"Volume 1: Offshore Technology; Offshore Geotechnics","volume":"4 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-11-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Efficient Anchoring System for FPSO in Arbitrary Waters\",\"authors\":\"J. B. Araujo, A. C. Fernandes, J. S. Sales, Mario Jorge C. dos Santos, Ana Clara Thurler\",\"doi\":\"10.1115/omae2019-96575\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Oil offshore Brazil, as well as in other continents, has demanded floating units for oil production. Typical anchored production units are the semi-submersible platforms, FPSO, Spar Buoys and TLPs. All of them use several anchoring lines for station keeping.\\n In the offshore Brazil scenario, the last twelve years the FPSOs adopts the torpedo piles and polyester ropes in the anchoring lines in deep and ultra-deep waters. The FPSO “Cidade de Angra dos Reis” was the first to operate in pre-salt area in October 2010. From then on, it became common the production units with VLCC size, oil production of 150,000 barrels per day and 24 anchoring lines. The reason for such large number of anchors is the 1,200 tonnes torpedo piles holding power restriction.\\n The proposition developed in this paper reduces the number of anchor lines using well know offshore equipment such as: driven piles, mooring chains, polyester ropes and conventional anchoring deck equipment. The main difference is the use of driven piles with holding power above 1,800 tonnes and anchor lines with a breaking strength of more than 2,000 tonnes. It is shown that a decrease of number of anchoring lines from 24 to 12 can be achieved. Consequently, it will decrease also the space occupied by the anchoring lines in the seabed by reducing the subsea layout of risers, flow lines and well head. This allows a technical and economical scenario more feasible when compared with the currently used on the Brazilian oil & gas market.\",\"PeriodicalId\":23567,\"journal\":{\"name\":\"Volume 1: Offshore Technology; Offshore Geotechnics\",\"volume\":\"4 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-11-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Volume 1: Offshore Technology; Offshore Geotechnics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1115/omae2019-96575\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Volume 1: Offshore Technology; Offshore Geotechnics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1115/omae2019-96575","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

巴西近海以及其他大陆的石油生产都需要浮式装置。典型的锚固式生产装置有半潜式平台、FPSO、Spar浮标和张力腿平台。它们都使用几条锚线来保持站位。在巴西近海,过去12年fpso在深水和超深水锚索中采用鱼雷桩和聚酯绳。2010年10月,“Cidade de Angra dos Reis”号FPSO首次在盐下区域作业。从那时起,VLCC规模的生产单元、15万桶/日的石油产量和24条锚泊线变得普遍。如此大量锚的原因是1,200吨鱼雷桩持有功率限制。本文提出的建议使用众所周知的海上设备,如:打入桩,系泊链,聚酯绳和常规锚固甲板设备,减少锚索的数量。主要的不同之处在于使用的是支撑力超过1800吨的打桩和断裂强度超过2000吨的锚索。结果表明,锚固线数可由24条减少到12条。因此,通过减少隔水管、流动管线和井口的海底布局,也将减少锚固线在海底占用的空间。与目前在巴西油气市场上使用的方案相比,这使得技术和经济方案更加可行。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Efficient Anchoring System for FPSO in Arbitrary Waters
Oil offshore Brazil, as well as in other continents, has demanded floating units for oil production. Typical anchored production units are the semi-submersible platforms, FPSO, Spar Buoys and TLPs. All of them use several anchoring lines for station keeping. In the offshore Brazil scenario, the last twelve years the FPSOs adopts the torpedo piles and polyester ropes in the anchoring lines in deep and ultra-deep waters. The FPSO “Cidade de Angra dos Reis” was the first to operate in pre-salt area in October 2010. From then on, it became common the production units with VLCC size, oil production of 150,000 barrels per day and 24 anchoring lines. The reason for such large number of anchors is the 1,200 tonnes torpedo piles holding power restriction. The proposition developed in this paper reduces the number of anchor lines using well know offshore equipment such as: driven piles, mooring chains, polyester ropes and conventional anchoring deck equipment. The main difference is the use of driven piles with holding power above 1,800 tonnes and anchor lines with a breaking strength of more than 2,000 tonnes. It is shown that a decrease of number of anchoring lines from 24 to 12 can be achieved. Consequently, it will decrease also the space occupied by the anchoring lines in the seabed by reducing the subsea layout of risers, flow lines and well head. This allows a technical and economical scenario more feasible when compared with the currently used on the Brazilian oil & gas market.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信