影响尼日利亚西南部建筑垃圾产生的因素

S. Tongo, Oluwatayo Aa, Adeboye Ba
{"title":"影响尼日利亚西南部建筑垃圾产生的因素","authors":"S. Tongo, Oluwatayo Aa, Adeboye Ba","doi":"10.35248/2252-5211.20.10.371","DOIUrl":null,"url":null,"abstract":"The study was aimed to assess the factors influencing waste generation in buildings project in southwestern, Nigeria. The study randomly sampled 261 professionals through a questionnaire survey. Tables and figures were used to present the collected data and ranking and percentage were used to analyze the data collected. It was revealed that Design (Frequent design changes and poor design) lack of early contractor involvement, last-minute client requirement, engagement of inexperience designer, undefined project brief, poor design quality are the most important factors that influence l waste generation during buildings project. It was recommended that site operatives and craft men should be equipped with waste minimization knowledge, they should carry along in every management decision regarding waste management plan development as a major player on sites.","PeriodicalId":14393,"journal":{"name":"International Journal of Waste Resources","volume":"69 1","pages":"1-4"},"PeriodicalIF":0.0000,"publicationDate":"2020-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"10","resultStr":"{\"title\":\"Factors Influencing Waste Generation in Buildings Project in South-West, Nigeria\",\"authors\":\"S. Tongo, Oluwatayo Aa, Adeboye Ba\",\"doi\":\"10.35248/2252-5211.20.10.371\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The study was aimed to assess the factors influencing waste generation in buildings project in southwestern, Nigeria. The study randomly sampled 261 professionals through a questionnaire survey. Tables and figures were used to present the collected data and ranking and percentage were used to analyze the data collected. It was revealed that Design (Frequent design changes and poor design) lack of early contractor involvement, last-minute client requirement, engagement of inexperience designer, undefined project brief, poor design quality are the most important factors that influence l waste generation during buildings project. It was recommended that site operatives and craft men should be equipped with waste minimization knowledge, they should carry along in every management decision regarding waste management plan development as a major player on sites.\",\"PeriodicalId\":14393,\"journal\":{\"name\":\"International Journal of Waste Resources\",\"volume\":\"69 1\",\"pages\":\"1-4\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"10\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Waste Resources\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.35248/2252-5211.20.10.371\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Waste Resources","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.35248/2252-5211.20.10.371","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 10

摘要

本研究旨在评估影响尼日利亚西南部建筑项目产生废物的因素。该研究通过问卷调查随机抽取了261名专业人士。使用表格和数字来展示收集到的数据,并使用排名和百分比来分析收集到的数据。结果表明,设计(频繁的设计变更和糟糕的设计)缺乏早期承包商参与,客户最后一刻的要求,缺乏经验的设计师参与,不明确的项目简介,设计质量差是影响建筑项目中废物产生的最重要因素。会议建议,场址操作人员和工艺人员应具备尽量减少废物的知识,他们应作为场址的主要参与者,参与有关制订废物管理计划的每一项管理决定。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Factors Influencing Waste Generation in Buildings Project in South-West, Nigeria
The study was aimed to assess the factors influencing waste generation in buildings project in southwestern, Nigeria. The study randomly sampled 261 professionals through a questionnaire survey. Tables and figures were used to present the collected data and ranking and percentage were used to analyze the data collected. It was revealed that Design (Frequent design changes and poor design) lack of early contractor involvement, last-minute client requirement, engagement of inexperience designer, undefined project brief, poor design quality are the most important factors that influence l waste generation during buildings project. It was recommended that site operatives and craft men should be equipped with waste minimization knowledge, they should carry along in every management decision regarding waste management plan development as a major player on sites.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信