印度尼西亚炼油厂振兴项目组合前端规划(FEP)中的项目选择和优先排序框架建议

Ridha Satria, Rahayu Setiawati Arifin, Emelia Sari
{"title":"印度尼西亚炼油厂振兴项目组合前端规划(FEP)中的项目选择和优先排序框架建议","authors":"Ridha Satria, Rahayu Setiawati Arifin, Emelia Sari","doi":"10.25105/jti.v13i1.17510","DOIUrl":null,"url":null,"abstract":"Abstract— Due to their aging, refinery facilities face the threat of suffering from incidents and accidents. Even fatal injury may be caused if running without proper maintenance planning. The revitalization project is performed intended to replace, repair, or increase production capacity at an existing refinery. Like other projects in the construction sector, the revitalization project tends to experience the same common flaws in their performance; project delay, cost overrun, scope creeping, operational mishaps, and canceled or stopped. The best time for a project to experience idea development, conduct scope changes, prepare excellent project engineering, etc., is at the Front-end Planning stage. This paper focused on project selection and prioritization at the Front-end Planning. The focus is then zoomed in to the sub-stage of Front-end Planning (initiation, conceptual, and basic engineering design). The aim is to eliminate the infeasible and unpromising projects that cannot meet the requirement. This focus is necessary before more resources are expended, which can ignite catastrophic events in the organization, primarily financial.The literature reviews have been done on the references to develop a comprehensive framework that decomposes the front-end planning into three sub-phases, providing the platform for project selection in each stage with its different focus and objectives. The new framework is proposed emphasizing the gate review and decision gates for those three sub-stages under the Front-end planning phase. The framework also provides the windows of having different selection criteria at each stage; hence the proper criteria will be efficiently used at the right time. Project proposals must go through a prioritization process since the organization's resource is not unlimited. Project proposals would experience the evaluation and selection as an individual project and, at a subsequent level, would be evaluated as part of the project proposals pool where the Project Management Office will prioritize the suitable projects worth execution.","PeriodicalId":32828,"journal":{"name":"Jurnal Teknik Industri","volume":"13 4 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-07-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Proposed Project Selection & Prioritization Framework during Front-End Planning (FEP) for Revitalization Project Portfolio at Indonesian Oil Refinery Plant\",\"authors\":\"Ridha Satria, Rahayu Setiawati Arifin, Emelia Sari\",\"doi\":\"10.25105/jti.v13i1.17510\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract— Due to their aging, refinery facilities face the threat of suffering from incidents and accidents. Even fatal injury may be caused if running without proper maintenance planning. The revitalization project is performed intended to replace, repair, or increase production capacity at an existing refinery. Like other projects in the construction sector, the revitalization project tends to experience the same common flaws in their performance; project delay, cost overrun, scope creeping, operational mishaps, and canceled or stopped. The best time for a project to experience idea development, conduct scope changes, prepare excellent project engineering, etc., is at the Front-end Planning stage. This paper focused on project selection and prioritization at the Front-end Planning. The focus is then zoomed in to the sub-stage of Front-end Planning (initiation, conceptual, and basic engineering design). The aim is to eliminate the infeasible and unpromising projects that cannot meet the requirement. This focus is necessary before more resources are expended, which can ignite catastrophic events in the organization, primarily financial.The literature reviews have been done on the references to develop a comprehensive framework that decomposes the front-end planning into three sub-phases, providing the platform for project selection in each stage with its different focus and objectives. The new framework is proposed emphasizing the gate review and decision gates for those three sub-stages under the Front-end planning phase. The framework also provides the windows of having different selection criteria at each stage; hence the proper criteria will be efficiently used at the right time. Project proposals must go through a prioritization process since the organization's resource is not unlimited. Project proposals would experience the evaluation and selection as an individual project and, at a subsequent level, would be evaluated as part of the project proposals pool where the Project Management Office will prioritize the suitable projects worth execution.\",\"PeriodicalId\":32828,\"journal\":{\"name\":\"Jurnal Teknik Industri\",\"volume\":\"13 4 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-07-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Teknik Industri\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.25105/jti.v13i1.17510\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Teknik Industri","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.25105/jti.v13i1.17510","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

摘要:由于老化,炼油厂设施面临着遭受事故和事故的威胁。如果没有适当的维护计划,甚至可能造成致命的伤害。振兴项目的实施旨在取代、修复或增加现有炼油厂的生产能力。与建筑领域的其他项目一样,振兴项目在绩效上往往也会遇到同样的常见缺陷;项目延迟,成本超支,范围蔓延,操作失误,取消或停止。项目体验创意开发、进行范围变更、准备优秀项目工程等的最佳时机是在前端规划阶段。本文重点研究了前端规划中的项目选择和优先级排序。然后将重点放大到前端规划的子阶段(初始、概念和基础工程设计)。其目的是消除不可行和没有希望的项目,不能满足要求。在花费更多的资源之前,这种关注是必要的,这可能会在组织中引发灾难性事件,主要是财务事件。文献综述已经完成了参考文献,以开发一个综合框架,将前端规划分解为三个子阶段,为每个阶段的项目选择提供平台,每个阶段都有不同的重点和目标。提出了新的框架,强调了前端规划阶段下这三个子阶段的门评审和决策门。该框架还提供了在每个阶段具有不同选择标准的窗口;因此,适当的标准将在适当的时间有效地使用。项目建议必须经过优先排序过程,因为组织的资源不是无限的。项目建议将作为一个单独的项目进行评价和选择,在随后的一级,将作为项目建议池的一部分进行评价,项目管理处将优先考虑值得执行的适当项目。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Proposed Project Selection & Prioritization Framework during Front-End Planning (FEP) for Revitalization Project Portfolio at Indonesian Oil Refinery Plant
Abstract— Due to their aging, refinery facilities face the threat of suffering from incidents and accidents. Even fatal injury may be caused if running without proper maintenance planning. The revitalization project is performed intended to replace, repair, or increase production capacity at an existing refinery. Like other projects in the construction sector, the revitalization project tends to experience the same common flaws in their performance; project delay, cost overrun, scope creeping, operational mishaps, and canceled or stopped. The best time for a project to experience idea development, conduct scope changes, prepare excellent project engineering, etc., is at the Front-end Planning stage. This paper focused on project selection and prioritization at the Front-end Planning. The focus is then zoomed in to the sub-stage of Front-end Planning (initiation, conceptual, and basic engineering design). The aim is to eliminate the infeasible and unpromising projects that cannot meet the requirement. This focus is necessary before more resources are expended, which can ignite catastrophic events in the organization, primarily financial.The literature reviews have been done on the references to develop a comprehensive framework that decomposes the front-end planning into three sub-phases, providing the platform for project selection in each stage with its different focus and objectives. The new framework is proposed emphasizing the gate review and decision gates for those three sub-stages under the Front-end planning phase. The framework also provides the windows of having different selection criteria at each stage; hence the proper criteria will be efficiently used at the right time. Project proposals must go through a prioritization process since the organization's resource is not unlimited. Project proposals would experience the evaluation and selection as an individual project and, at a subsequent level, would be evaluated as part of the project proposals pool where the Project Management Office will prioritize the suitable projects worth execution.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
1
审稿时长
4 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信