QUAD举升:能够举升更大的集成上层平台

Ivan van Winsen, R. V. Dijk
{"title":"QUAD举升:能够举升更大的集成上层平台","authors":"Ivan van Winsen, R. V. Dijk","doi":"10.1115/omae2019-95375","DOIUrl":null,"url":null,"abstract":"\n Over the past years Heerema Marine Contractors (HMC) has developed the QUAD lift method enabling the lift of single piece objects up to 30,000mT. This development is driven by the demand from our clients to install or remove larger topsides, both in size and weight. Lifting with two (or more) vessels simultaneously has been done before. Unique is that the QUAD lift operation is performed on DP. Two vessels lifting the topsides from opposite sides, instead of lifting the topsides from one side, creates the possibility for increasing dimensions and layouts of the topsides.\n The connection of the two crane vessels to the lifted object means that all actions taken on one ship influences not only the lifted object but also the second crane vessel. This requires a clear communication plan and full understanding of the complete system such as the DP behaviour, stability, ballast operations and crane operations. During a QUAD lift operation the Dynamic Positioning (DP) system plays an important role. Therefore in the development process the DP-system was modified to ensure stability of the DP system throughout the entire operation. A systematic series of tests was performed to gain insight in the DP behaviour of both vessels with the goal to ensure a synchronous move with two vessels connected in a QUAD lift configuration.\n In 2018 a demonstration QUAD lift is performed using Balder and Thialf to show HMCs commitment to perform this kind of operations in the future. The QUAD lift demonstration lift was prepared and executed in the Heerema Simulation Center (HSC) with the offshore crew in preparation of the actual offshore execution.\n This paper will address the steps followed to prepare for the offshore execution, describing DP behaviour, vessel coupled dynamics and human factor aspects. Based on the offshore experience validation was performed on the numerical tools used in the preparation.","PeriodicalId":23567,"journal":{"name":"Volume 1: Offshore Technology; Offshore Geotechnics","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2019-11-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"QUAD Lift: Enabling Lifting of Larger Integrated Topsides\",\"authors\":\"Ivan van Winsen, R. V. Dijk\",\"doi\":\"10.1115/omae2019-95375\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Over the past years Heerema Marine Contractors (HMC) has developed the QUAD lift method enabling the lift of single piece objects up to 30,000mT. This development is driven by the demand from our clients to install or remove larger topsides, both in size and weight. Lifting with two (or more) vessels simultaneously has been done before. Unique is that the QUAD lift operation is performed on DP. Two vessels lifting the topsides from opposite sides, instead of lifting the topsides from one side, creates the possibility for increasing dimensions and layouts of the topsides.\\n The connection of the two crane vessels to the lifted object means that all actions taken on one ship influences not only the lifted object but also the second crane vessel. This requires a clear communication plan and full understanding of the complete system such as the DP behaviour, stability, ballast operations and crane operations. During a QUAD lift operation the Dynamic Positioning (DP) system plays an important role. Therefore in the development process the DP-system was modified to ensure stability of the DP system throughout the entire operation. A systematic series of tests was performed to gain insight in the DP behaviour of both vessels with the goal to ensure a synchronous move with two vessels connected in a QUAD lift configuration.\\n In 2018 a demonstration QUAD lift is performed using Balder and Thialf to show HMCs commitment to perform this kind of operations in the future. The QUAD lift demonstration lift was prepared and executed in the Heerema Simulation Center (HSC) with the offshore crew in preparation of the actual offshore execution.\\n This paper will address the steps followed to prepare for the offshore execution, describing DP behaviour, vessel coupled dynamics and human factor aspects. Based on the offshore experience validation was performed on the numerical tools used in the preparation.\",\"PeriodicalId\":23567,\"journal\":{\"name\":\"Volume 1: Offshore Technology; Offshore Geotechnics\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-11-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Volume 1: Offshore Technology; Offshore Geotechnics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1115/omae2019-95375\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Volume 1: Offshore Technology; Offshore Geotechnics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1115/omae2019-95375","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在过去的几年中,Heerema Marine Contractors (HMC)开发了QUAD举升方法,可以举升高达30,000吨的单件物体。客户对安装或移除更大尺寸和重量的上层平台的需求推动了这一发展。用两艘(或更多)船只同时吊装以前也有过。独特之处在于QUAD举升作业是在DP上进行的。两艘船从相对的两侧吊起上部结构,而不是从一侧吊起上部结构,从而增加了上部结构的尺寸和布局。两艘起重船与被吊装物的连接意味着一艘船上发生的所有动作不仅影响被吊装物,而且影响另一艘起重船。这需要一个清晰的沟通计划,并充分了解整个系统,如DP行为、稳定性、压载作业和起重机作业。在QUAD举升作业中,动态定位(DP)系统起着重要的作用。因此在开发过程中对DP系统进行了修改,以保证DP系统在整个运行过程中的稳定性。进行了一系列系统的测试,以了解两艘船的DP行为,目的是确保在QUAD举升配置中连接的两艘船同步移动。2018年,使用Balder和Thialf进行了QUAD举升演示,以表明hmc在未来执行此类操作的承诺。QUAD举升演示举升是在Heerema模拟中心(HSC)与海上工作人员一起准备和执行的,为实际的海上执行做准备。本文将讨论准备海上执行的步骤,描述DP行为,船舶耦合动力学和人为因素方面。在海上经验的基础上,对制备过程中使用的数值工具进行了验证。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
QUAD Lift: Enabling Lifting of Larger Integrated Topsides
Over the past years Heerema Marine Contractors (HMC) has developed the QUAD lift method enabling the lift of single piece objects up to 30,000mT. This development is driven by the demand from our clients to install or remove larger topsides, both in size and weight. Lifting with two (or more) vessels simultaneously has been done before. Unique is that the QUAD lift operation is performed on DP. Two vessels lifting the topsides from opposite sides, instead of lifting the topsides from one side, creates the possibility for increasing dimensions and layouts of the topsides. The connection of the two crane vessels to the lifted object means that all actions taken on one ship influences not only the lifted object but also the second crane vessel. This requires a clear communication plan and full understanding of the complete system such as the DP behaviour, stability, ballast operations and crane operations. During a QUAD lift operation the Dynamic Positioning (DP) system plays an important role. Therefore in the development process the DP-system was modified to ensure stability of the DP system throughout the entire operation. A systematic series of tests was performed to gain insight in the DP behaviour of both vessels with the goal to ensure a synchronous move with two vessels connected in a QUAD lift configuration. In 2018 a demonstration QUAD lift is performed using Balder and Thialf to show HMCs commitment to perform this kind of operations in the future. The QUAD lift demonstration lift was prepared and executed in the Heerema Simulation Center (HSC) with the offshore crew in preparation of the actual offshore execution. This paper will address the steps followed to prepare for the offshore execution, describing DP behaviour, vessel coupled dynamics and human factor aspects. Based on the offshore experience validation was performed on the numerical tools used in the preparation.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信