{"title":"阿贡·斯勒曼清真寺尖塔建筑设计的误区与对策研究","authors":"Ala Ali Qasem Alraimi, M. I. Setiawan, Adi Prawito","doi":"10.29138/neutron.v22i01.171","DOIUrl":null,"url":null,"abstract":"This study helps to solve the problem at the minaret of Agung Mosque which costs about (Rp16.000.000.000), located in Yogyakarta city, Indonesia, Sleman street, where its high sixty seven meters from the ground and it consists of fifty floors, where analyze and prove the safety of the minaret dome, replace the dome, repair the fallen parts from middle floors, and calculate the total cost of replacing the dome and repairing fallen parts of the minaret. This study proved that the existing design reinforcement of the dome is totally safe, estimated the total cost of solving the minaret problems which (Rp2, 281,873,633.54). Where the total costs of replacing the dome were (Rp2, 073,135,813), the total costs of fixing the damaged “fallen” parts of the middle floors were (Rp1, 294,762.24), and the total of the unexpected costs were (Rp207, 443,057.59)","PeriodicalId":39014,"journal":{"name":"Neutron News","volume":"63 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-07-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Study of Agung Sleman Mosque Minaret Construction Design: Errors and Solutions\",\"authors\":\"Ala Ali Qasem Alraimi, M. I. Setiawan, Adi Prawito\",\"doi\":\"10.29138/neutron.v22i01.171\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study helps to solve the problem at the minaret of Agung Mosque which costs about (Rp16.000.000.000), located in Yogyakarta city, Indonesia, Sleman street, where its high sixty seven meters from the ground and it consists of fifty floors, where analyze and prove the safety of the minaret dome, replace the dome, repair the fallen parts from middle floors, and calculate the total cost of replacing the dome and repairing fallen parts of the minaret. This study proved that the existing design reinforcement of the dome is totally safe, estimated the total cost of solving the minaret problems which (Rp2, 281,873,633.54). Where the total costs of replacing the dome were (Rp2, 073,135,813), the total costs of fixing the damaged “fallen” parts of the middle floors were (Rp1, 294,762.24), and the total of the unexpected costs were (Rp207, 443,057.59)\",\"PeriodicalId\":39014,\"journal\":{\"name\":\"Neutron News\",\"volume\":\"63 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-07-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Neutron News\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.29138/neutron.v22i01.171\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"Physics and Astronomy\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Neutron News","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29138/neutron.v22i01.171","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Physics and Astronomy","Score":null,"Total":0}
引用次数: 0

摘要

本研究有助于解决阿贡清真寺尖塔的问题,耗资约(Rp16.000.000.000),位于日惹市,印度尼西亚,Sleman街,它的高离地面67米,它由50层组成,在那里分析和证明尖塔圆顶的安全性,更换圆顶,修复中间楼层的掉落部分,并计算更换圆顶和修复尖塔掉落部分的总成本。本研究证明了穹顶现有的设计加固是完全安全的,估计解决尖塔问题的总成本为(Rp2, 281,873,633.54)。其中更换穹顶的总成本为(Rp2, 073,135,813),修复中间楼层受损“坠落”部分的总成本为(Rp1, 294,762.24),意外成本总计为(Rp207, 443,057.59)。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Study of Agung Sleman Mosque Minaret Construction Design: Errors and Solutions
This study helps to solve the problem at the minaret of Agung Mosque which costs about (Rp16.000.000.000), located in Yogyakarta city, Indonesia, Sleman street, where its high sixty seven meters from the ground and it consists of fifty floors, where analyze and prove the safety of the minaret dome, replace the dome, repair the fallen parts from middle floors, and calculate the total cost of replacing the dome and repairing fallen parts of the minaret. This study proved that the existing design reinforcement of the dome is totally safe, estimated the total cost of solving the minaret problems which (Rp2, 281,873,633.54). Where the total costs of replacing the dome were (Rp2, 073,135,813), the total costs of fixing the damaged “fallen” parts of the middle floors were (Rp1, 294,762.24), and the total of the unexpected costs were (Rp207, 443,057.59)
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Neutron News
Neutron News Physics and Astronomy-Nuclear and High Energy Physics
CiteScore
0.30
自引率
0.00%
发文量
36
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信