基于全站仪定点监测提高大坝位移可靠性

IF 0.4 Q4 ENGINEERING, GEOLOGICAL
G. Kang, Bongjae Kim, Seok-woo Hong, Yeon-Chool Yim, Jiseong Kim
{"title":"基于全站仪定点监测提高大坝位移可靠性","authors":"G. Kang, Bongjae Kim, Seok-woo Hong, Yeon-Chool Yim, Jiseong Kim","doi":"10.12814/JKGSS.2017.16.1.001","DOIUrl":null,"url":null,"abstract":"Displacement of dams by various instrumentations has been monitored for its safety management and analyzing the behavior after a dam collapse accident. However, unknown displacement of dam has frequently been occurred and it’s difficult to analyze behavior of dams more accurately. In this study, improvement of reliabilities for displacement of dams measured by a total station was suggested by calibrating the monitoring system. The position of total station was initially measured through 2 - 3 given points and the coordinate of the total station was considered as an absolute value. Also, base horizontal and vertical angles had not been considered even if they are important factors when displacement was estimated. In this study, location of the total station and variations of base horizontal and vertical angles were investigated during measuring displacements of targeting points. From the results of this study,","PeriodicalId":42164,"journal":{"name":"Journal of the Korean Geosynthetic Society","volume":null,"pages":null},"PeriodicalIF":0.4000,"publicationDate":"2017-03-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Improving Reliabilities of Dam Displacement based on Monitoring Given Points by Total Station\",\"authors\":\"G. Kang, Bongjae Kim, Seok-woo Hong, Yeon-Chool Yim, Jiseong Kim\",\"doi\":\"10.12814/JKGSS.2017.16.1.001\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Displacement of dams by various instrumentations has been monitored for its safety management and analyzing the behavior after a dam collapse accident. However, unknown displacement of dam has frequently been occurred and it’s difficult to analyze behavior of dams more accurately. In this study, improvement of reliabilities for displacement of dams measured by a total station was suggested by calibrating the monitoring system. The position of total station was initially measured through 2 - 3 given points and the coordinate of the total station was considered as an absolute value. Also, base horizontal and vertical angles had not been considered even if they are important factors when displacement was estimated. In this study, location of the total station and variations of base horizontal and vertical angles were investigated during measuring displacements of targeting points. From the results of this study,\",\"PeriodicalId\":42164,\"journal\":{\"name\":\"Journal of the Korean Geosynthetic Society\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.4000,\"publicationDate\":\"2017-03-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of the Korean Geosynthetic Society\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.12814/JKGSS.2017.16.1.001\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, GEOLOGICAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of the Korean Geosynthetic Society","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.12814/JKGSS.2017.16.1.001","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, GEOLOGICAL","Score":null,"Total":0}
引用次数: 3

摘要

利用各种仪器对大坝位移进行监测,对大坝的安全管理和溃坝事故后的行为进行分析。然而,大坝的未知位移经常发生,难以更准确地分析大坝的行为。本文通过对监测系统的标定,提出了提高全站仪测坝位移可靠性的建议。全站仪的位置最初是通过2 - 3个给定点来测量的,全站仪的坐标被认为是一个绝对值。此外,虽然基本水平线和垂直角度是估计位移时的重要因素,但没有考虑它们。在本研究中,研究了全站仪在测量目标点位移时的位置以及基准水平和垂直角度的变化。从这项研究的结果来看,
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Improving Reliabilities of Dam Displacement based on Monitoring Given Points by Total Station
Displacement of dams by various instrumentations has been monitored for its safety management and analyzing the behavior after a dam collapse accident. However, unknown displacement of dam has frequently been occurred and it’s difficult to analyze behavior of dams more accurately. In this study, improvement of reliabilities for displacement of dams measured by a total station was suggested by calibrating the monitoring system. The position of total station was initially measured through 2 - 3 given points and the coordinate of the total station was considered as an absolute value. Also, base horizontal and vertical angles had not been considered even if they are important factors when displacement was estimated. In this study, location of the total station and variations of base horizontal and vertical angles were investigated during measuring displacements of targeting points. From the results of this study,
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
20.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信