{"title":"基于ANSYS有限元程序对某钢筋混凝土半贯通系拱桥进行有限元分析","authors":"Xiao-zhen Chen, Xuejun Zhang","doi":"10.1109/MACE.2011.5987662","DOIUrl":null,"url":null,"abstract":"Shihe bridge in Xinyang city built in 1997 is a a half-through reinforced concrete tied-arch bridge. In order to test and evaluate the loading character, the static and dynamic analysis is performed, the experimental measurement is also performed in January, 2004. In this paper, the structure is analyzed through FEM, the computed result is compared with the measured result. Through the comparison, the conclusion can be drawn that the global strength and rigidity of the bridge can meet the demand of normal use, the loading capacity adds up to the design requirement.","PeriodicalId":6400,"journal":{"name":"2011 Second International Conference on Mechanic Automation and Control Engineering","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2011-07-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Finite element analysis of a half-through reinforced concrete tied-arch bridge based on FEM program ANSYS\",\"authors\":\"Xiao-zhen Chen, Xuejun Zhang\",\"doi\":\"10.1109/MACE.2011.5987662\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Shihe bridge in Xinyang city built in 1997 is a a half-through reinforced concrete tied-arch bridge. In order to test and evaluate the loading character, the static and dynamic analysis is performed, the experimental measurement is also performed in January, 2004. In this paper, the structure is analyzed through FEM, the computed result is compared with the measured result. Through the comparison, the conclusion can be drawn that the global strength and rigidity of the bridge can meet the demand of normal use, the loading capacity adds up to the design requirement.\",\"PeriodicalId\":6400,\"journal\":{\"name\":\"2011 Second International Conference on Mechanic Automation and Control Engineering\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-07-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2011 Second International Conference on Mechanic Automation and Control Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/MACE.2011.5987662\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 Second International Conference on Mechanic Automation and Control Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/MACE.2011.5987662","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Finite element analysis of a half-through reinforced concrete tied-arch bridge based on FEM program ANSYS
Shihe bridge in Xinyang city built in 1997 is a a half-through reinforced concrete tied-arch bridge. In order to test and evaluate the loading character, the static and dynamic analysis is performed, the experimental measurement is also performed in January, 2004. In this paper, the structure is analyzed through FEM, the computed result is compared with the measured result. Through the comparison, the conclusion can be drawn that the global strength and rigidity of the bridge can meet the demand of normal use, the loading capacity adds up to the design requirement.