{"title":"广义参数下的订单接收与交货调度","authors":"Lingfa Lu, Jinwen Ou, Xue Yu, Liqi Zhang","doi":"10.1002/nav.22135","DOIUrl":null,"url":null,"abstract":"Inspired by the concept of generalized due dates introduced by Hall (IIE Transactions, 18(2), 220–222), in this article we first define four new generalized parameters in machine scheduling: the generalized release dates (GRD), generalized processing times (GPT), generalized rejection costs (GRC), and generalized delivery times (GDT). We then study order acceptance and scheduling problems with delivery consideration under the generalized parameters of GRD, GPT, GRC, and GDT, respectively. The objective of each scheduling problem in consideration is to minimize the maximum delivery completion time of the accepted jobs plus the total rejection penalty cost of the rejected jobs. We show that two of the six problems studied in this article are weakly NP‐hard while the other four ones can be solved in polynomial time. For each NP‐hard problem, we provide a pseudo‐polynomial time algorithm, a 2‐approximation algorithm and a fully polynomial‐time approximation scheme.","PeriodicalId":19120,"journal":{"name":"Naval Research Logistics (NRL)","volume":"39 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-07-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Order acceptance and scheduling with delivery under generalized parameters\",\"authors\":\"Lingfa Lu, Jinwen Ou, Xue Yu, Liqi Zhang\",\"doi\":\"10.1002/nav.22135\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Inspired by the concept of generalized due dates introduced by Hall (IIE Transactions, 18(2), 220–222), in this article we first define four new generalized parameters in machine scheduling: the generalized release dates (GRD), generalized processing times (GPT), generalized rejection costs (GRC), and generalized delivery times (GDT). We then study order acceptance and scheduling problems with delivery consideration under the generalized parameters of GRD, GPT, GRC, and GDT, respectively. The objective of each scheduling problem in consideration is to minimize the maximum delivery completion time of the accepted jobs plus the total rejection penalty cost of the rejected jobs. We show that two of the six problems studied in this article are weakly NP‐hard while the other four ones can be solved in polynomial time. For each NP‐hard problem, we provide a pseudo‐polynomial time algorithm, a 2‐approximation algorithm and a fully polynomial‐time approximation scheme.\",\"PeriodicalId\":19120,\"journal\":{\"name\":\"Naval Research Logistics (NRL)\",\"volume\":\"39 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-07-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Naval Research Logistics (NRL)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1002/nav.22135\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Naval Research Logistics (NRL)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1002/nav.22135","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Order acceptance and scheduling with delivery under generalized parameters
Inspired by the concept of generalized due dates introduced by Hall (IIE Transactions, 18(2), 220–222), in this article we first define four new generalized parameters in machine scheduling: the generalized release dates (GRD), generalized processing times (GPT), generalized rejection costs (GRC), and generalized delivery times (GDT). We then study order acceptance and scheduling problems with delivery consideration under the generalized parameters of GRD, GPT, GRC, and GDT, respectively. The objective of each scheduling problem in consideration is to minimize the maximum delivery completion time of the accepted jobs plus the total rejection penalty cost of the rejected jobs. We show that two of the six problems studied in this article are weakly NP‐hard while the other four ones can be solved in polynomial time. For each NP‐hard problem, we provide a pseudo‐polynomial time algorithm, a 2‐approximation algorithm and a fully polynomial‐time approximation scheme.