现代鱼市发展趋势投资分析“新河口”

Edy Supriyantony
{"title":"现代鱼市发展趋势投资分析“新河口”","authors":"Edy Supriyantony","doi":"10.56145/jurnalekonomidanbisnis.v3i2.67","DOIUrl":null,"url":null,"abstract":"Directorate General of PDSPKP, Ministry of Maritime Affairs and Fisheries in order to improve competitiveness by increasing market facilities and infrastructure as the main chain of distribution of marine and fishery products, plans to build a world-class modern fish market (PIM). This research was conducted to know the feasibility of development from the financial aspects. The data were collecting with methods of field observation, interviews and literature studies. The results of the feasibility study of this plan show that PIM development is feasible to be implemented from the financial aspect. This is supported by the results of an analysis that shows 7.36 year payback period (PP) 7.36 year; NPV of Rp. 21.74 billion; IRR of 13.42%; and ROI of 21.91%.","PeriodicalId":31741,"journal":{"name":"Jurnal Ekonomi dan Bisnis","volume":"26 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-07-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analisis Kelayakan Investasi Pembangunan Pasar Ikan Modern “Muara Baru”\",\"authors\":\"Edy Supriyantony\",\"doi\":\"10.56145/jurnalekonomidanbisnis.v3i2.67\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Directorate General of PDSPKP, Ministry of Maritime Affairs and Fisheries in order to improve competitiveness by increasing market facilities and infrastructure as the main chain of distribution of marine and fishery products, plans to build a world-class modern fish market (PIM). This research was conducted to know the feasibility of development from the financial aspects. The data were collecting with methods of field observation, interviews and literature studies. The results of the feasibility study of this plan show that PIM development is feasible to be implemented from the financial aspect. This is supported by the results of an analysis that shows 7.36 year payback period (PP) 7.36 year; NPV of Rp. 21.74 billion; IRR of 13.42%; and ROI of 21.91%.\",\"PeriodicalId\":31741,\"journal\":{\"name\":\"Jurnal Ekonomi dan Bisnis\",\"volume\":\"26 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-07-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Ekonomi dan Bisnis\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.56145/jurnalekonomidanbisnis.v3i2.67\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Ekonomi dan Bisnis","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.56145/jurnalekonomidanbisnis.v3i2.67","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

海洋水产部海洋水产总司为提高竞争力,计划建设世界一流的现代鱼市场(PIM),并扩大市场设施和基础设施,使其成为水产品流通的主要渠道。本研究是为了从财务方面了解发展的可行性。采用实地观察法、访谈法和文献研究法收集资料。该方案的可行性研究结果表明,从财务方面来看,PIM开发是可行的。分析结果显示,7.36年的投资回收期(PP) 7.36年;净现值217.4亿卢比;内部收益率13.42%;投资回报率为21.91%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analisis Kelayakan Investasi Pembangunan Pasar Ikan Modern “Muara Baru”
Directorate General of PDSPKP, Ministry of Maritime Affairs and Fisheries in order to improve competitiveness by increasing market facilities and infrastructure as the main chain of distribution of marine and fishery products, plans to build a world-class modern fish market (PIM). This research was conducted to know the feasibility of development from the financial aspects. The data were collecting with methods of field observation, interviews and literature studies. The results of the feasibility study of this plan show that PIM development is feasible to be implemented from the financial aspect. This is supported by the results of an analysis that shows 7.36 year payback period (PP) 7.36 year; NPV of Rp. 21.74 billion; IRR of 13.42%; and ROI of 21.91%.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
审稿时长
15 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信