Khalid Javid, Srinivas Ettireddi, Yahia Mokhtar Hafez, Mohamed Hossni Ali, Pedro Ronaldo Marin Centurion, L. Cerrada, Mohamed Sayed Mohamed, Kamel Zahaf, Khalil Ibrahim Alhosani, Abdulla Gharib Al Qamzi
{"title":"阿布扎比海上绿色数字油田的实时监测:优势与挑战","authors":"Khalid Javid, Srinivas Ettireddi, Yahia Mokhtar Hafez, Mohamed Hossni Ali, Pedro Ronaldo Marin Centurion, L. Cerrada, Mohamed Sayed Mohamed, Kamel Zahaf, Khalil Ibrahim Alhosani, Abdulla Gharib Al Qamzi","doi":"10.2118/197921-ms","DOIUrl":null,"url":null,"abstract":"\n This Green Field was recently commissioned and it was put on production last year. It is a model Digital Oil Field having two artificial islands built to drill all its wells with smart completions like ICVs, ICDs and Permanent Downhole Gauges in all Oil & Gas Producer Wells. This paper will describe the benefits of real-time data utilization for better and most efficient Field/Wells Monitoring along with Better and quick decision-making. Flow tests are performed 2-3 times a week using Multi phase flow meter (MPFM) for each of its wells.\n Smart and Innovative Dashboard have been created for best screening and grouping of wells as per predefined business rules and alerting Asset Engineers for any wells, which are close to violating any of the Reservoir Management Guidelines, and therefore timely decisions, are made to avoid those violations. Miscible Gas Injection was started from the early days of Field life. Gas Tracers are planned to be injected by the end of this year to achieve the successful and improved surveillance and understandingly Reservoirs and better plan the future wells locations and completion strategy.\n All Field/well Shut Down duration opportunities are utilized for Pressure Build-up analysis for Oil Producer wells and therefore considerable cost of running Memory gauges and intervention operations is also saved.\n Successful Digital Oil Field is a result of collaborative and multiple discipline Team Work. Lessons learned and recommendation for any new Digital Oil Field are also presented in the paper.\n Innovative Dashboards have been created to for best screening of wells and alerting for any wells, which are close to violating any of the Reservoir Management Guidelines, and therefore timely decisions, are made to avoid those violations.\n The standardized data repository is developed as data integration layer using OSI PI platform products to seamlessly merge real time data with manual data to create a single data reference architecture. This has been a powerful enhancement to ensure a single version of the truth.","PeriodicalId":11091,"journal":{"name":"Day 3 Wed, November 13, 2019","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2019-11-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Real-Time Monitoring of a Green Digital Oil Field in Abu Dhabi Offshore: It's Benefits and Challenges\",\"authors\":\"Khalid Javid, Srinivas Ettireddi, Yahia Mokhtar Hafez, Mohamed Hossni Ali, Pedro Ronaldo Marin Centurion, L. Cerrada, Mohamed Sayed Mohamed, Kamel Zahaf, Khalil Ibrahim Alhosani, Abdulla Gharib Al Qamzi\",\"doi\":\"10.2118/197921-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n This Green Field was recently commissioned and it was put on production last year. It is a model Digital Oil Field having two artificial islands built to drill all its wells with smart completions like ICVs, ICDs and Permanent Downhole Gauges in all Oil & Gas Producer Wells. This paper will describe the benefits of real-time data utilization for better and most efficient Field/Wells Monitoring along with Better and quick decision-making. Flow tests are performed 2-3 times a week using Multi phase flow meter (MPFM) for each of its wells.\\n Smart and Innovative Dashboard have been created for best screening and grouping of wells as per predefined business rules and alerting Asset Engineers for any wells, which are close to violating any of the Reservoir Management Guidelines, and therefore timely decisions, are made to avoid those violations. Miscible Gas Injection was started from the early days of Field life. Gas Tracers are planned to be injected by the end of this year to achieve the successful and improved surveillance and understandingly Reservoirs and better plan the future wells locations and completion strategy.\\n All Field/well Shut Down duration opportunities are utilized for Pressure Build-up analysis for Oil Producer wells and therefore considerable cost of running Memory gauges and intervention operations is also saved.\\n Successful Digital Oil Field is a result of collaborative and multiple discipline Team Work. Lessons learned and recommendation for any new Digital Oil Field are also presented in the paper.\\n Innovative Dashboards have been created to for best screening of wells and alerting for any wells, which are close to violating any of the Reservoir Management Guidelines, and therefore timely decisions, are made to avoid those violations.\\n The standardized data repository is developed as data integration layer using OSI PI platform products to seamlessly merge real time data with manual data to create a single data reference architecture. This has been a powerful enhancement to ensure a single version of the truth.\",\"PeriodicalId\":11091,\"journal\":{\"name\":\"Day 3 Wed, November 13, 2019\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-11-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 3 Wed, November 13, 2019\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/197921-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Wed, November 13, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/197921-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Real-Time Monitoring of a Green Digital Oil Field in Abu Dhabi Offshore: It's Benefits and Challenges
This Green Field was recently commissioned and it was put on production last year. It is a model Digital Oil Field having two artificial islands built to drill all its wells with smart completions like ICVs, ICDs and Permanent Downhole Gauges in all Oil & Gas Producer Wells. This paper will describe the benefits of real-time data utilization for better and most efficient Field/Wells Monitoring along with Better and quick decision-making. Flow tests are performed 2-3 times a week using Multi phase flow meter (MPFM) for each of its wells.
Smart and Innovative Dashboard have been created for best screening and grouping of wells as per predefined business rules and alerting Asset Engineers for any wells, which are close to violating any of the Reservoir Management Guidelines, and therefore timely decisions, are made to avoid those violations. Miscible Gas Injection was started from the early days of Field life. Gas Tracers are planned to be injected by the end of this year to achieve the successful and improved surveillance and understandingly Reservoirs and better plan the future wells locations and completion strategy.
All Field/well Shut Down duration opportunities are utilized for Pressure Build-up analysis for Oil Producer wells and therefore considerable cost of running Memory gauges and intervention operations is also saved.
Successful Digital Oil Field is a result of collaborative and multiple discipline Team Work. Lessons learned and recommendation for any new Digital Oil Field are also presented in the paper.
Innovative Dashboards have been created to for best screening of wells and alerting for any wells, which are close to violating any of the Reservoir Management Guidelines, and therefore timely decisions, are made to avoid those violations.
The standardized data repository is developed as data integration layer using OSI PI platform products to seamlessly merge real time data with manual data to create a single data reference architecture. This has been a powerful enhancement to ensure a single version of the truth.