{"title":"机械和焊接联合残余应力下乏燃料罐的工程J估计","authors":"Hyunjung Lee, Yun‐Jae Kim, P. Lam, R. Sindelar","doi":"10.1115/pvp2019-93936","DOIUrl":null,"url":null,"abstract":"\n This paper compares engineering J estimates for Spent Fuel Canisters (SFCs) under combined mechanical and welding residual stress (WRS) with finite element (FE) results. Engineering J estimates are based on reference stress method provided in the R6 procedure considering interaction between primary and secondary stresses using the V-factor. It is found that residual stress should be considered in fracture assessment and the R6 estimates are reasonably conservative compared to FE analysis results.","PeriodicalId":23651,"journal":{"name":"Volume 6B: Materials and Fabrication","volume":"39 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-07-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Engineering J Estimates for Spent Fuel Canisters Under Combined Mechanical and Welding Residual Stresses\",\"authors\":\"Hyunjung Lee, Yun‐Jae Kim, P. Lam, R. Sindelar\",\"doi\":\"10.1115/pvp2019-93936\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n This paper compares engineering J estimates for Spent Fuel Canisters (SFCs) under combined mechanical and welding residual stress (WRS) with finite element (FE) results. Engineering J estimates are based on reference stress method provided in the R6 procedure considering interaction between primary and secondary stresses using the V-factor. It is found that residual stress should be considered in fracture assessment and the R6 estimates are reasonably conservative compared to FE analysis results.\",\"PeriodicalId\":23651,\"journal\":{\"name\":\"Volume 6B: Materials and Fabrication\",\"volume\":\"39 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-07-14\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Volume 6B: Materials and Fabrication\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1115/pvp2019-93936\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Volume 6B: Materials and Fabrication","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1115/pvp2019-93936","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Engineering J Estimates for Spent Fuel Canisters Under Combined Mechanical and Welding Residual Stresses
This paper compares engineering J estimates for Spent Fuel Canisters (SFCs) under combined mechanical and welding residual stress (WRS) with finite element (FE) results. Engineering J estimates are based on reference stress method provided in the R6 procedure considering interaction between primary and secondary stresses using the V-factor. It is found that residual stress should be considered in fracture assessment and the R6 estimates are reasonably conservative compared to FE analysis results.