{"title":"不变残值模型:预测提前期减少价值的系统性偏差来源","authors":"Stefan Wager, Suzanne de Treville","doi":"10.2139/ssrn.2202422","DOIUrl":null,"url":null,"abstract":"The assumption that unsold goods can be liquidated at a constant salvage value is widespread in inventory theory. We show that, under general mathematical conditions, this modeling assumption will cause companies to underestimate both the value of lead-time reduction and the cost of lead time increases. Our result does not require that companies actively consider the possibility of non-constant salvage values. Rather we show that, in an environment where salvage values are allowed to depend on the amount of overage, a firm that cuts lead times according to a strategy that assumes a constant salvage value will earn more money than predicted from its lead-time reduction.","PeriodicalId":49886,"journal":{"name":"Manufacturing Engineering","volume":"21 1","pages":""},"PeriodicalIF":0.1000,"publicationDate":"2013-01-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Constant Salvage Value Models: A Source of Systematic Bias in Predicting the Value of Lead-Time Reduction\",\"authors\":\"Stefan Wager, Suzanne de Treville\",\"doi\":\"10.2139/ssrn.2202422\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The assumption that unsold goods can be liquidated at a constant salvage value is widespread in inventory theory. We show that, under general mathematical conditions, this modeling assumption will cause companies to underestimate both the value of lead-time reduction and the cost of lead time increases. Our result does not require that companies actively consider the possibility of non-constant salvage values. Rather we show that, in an environment where salvage values are allowed to depend on the amount of overage, a firm that cuts lead times according to a strategy that assumes a constant salvage value will earn more money than predicted from its lead-time reduction.\",\"PeriodicalId\":49886,\"journal\":{\"name\":\"Manufacturing Engineering\",\"volume\":\"21 1\",\"pages\":\"\"},\"PeriodicalIF\":0.1000,\"publicationDate\":\"2013-01-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Manufacturing Engineering\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.2139/ssrn.2202422\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, MANUFACTURING\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Manufacturing Engineering","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.2139/ssrn.2202422","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, MANUFACTURING","Score":null,"Total":0}
Constant Salvage Value Models: A Source of Systematic Bias in Predicting the Value of Lead-Time Reduction
The assumption that unsold goods can be liquidated at a constant salvage value is widespread in inventory theory. We show that, under general mathematical conditions, this modeling assumption will cause companies to underestimate both the value of lead-time reduction and the cost of lead time increases. Our result does not require that companies actively consider the possibility of non-constant salvage values. Rather we show that, in an environment where salvage values are allowed to depend on the amount of overage, a firm that cuts lead times according to a strategy that assumes a constant salvage value will earn more money than predicted from its lead-time reduction.