不变残值模型:预测提前期减少价值的系统性偏差来源

IF 0.1 4区 工程技术 Q4 ENGINEERING, MANUFACTURING
Stefan Wager, Suzanne de Treville
{"title":"不变残值模型:预测提前期减少价值的系统性偏差来源","authors":"Stefan Wager, Suzanne de Treville","doi":"10.2139/ssrn.2202422","DOIUrl":null,"url":null,"abstract":"The assumption that unsold goods can be liquidated at a constant salvage value is widespread in inventory theory. We show that, under general mathematical conditions, this modeling assumption will cause companies to underestimate both the value of lead-time reduction and the cost of lead time increases. Our result does not require that companies actively consider the possibility of non-constant salvage values. Rather we show that, in an environment where salvage values are allowed to depend on the amount of overage, a firm that cuts lead times according to a strategy that assumes a constant salvage value will earn more money than predicted from its lead-time reduction.","PeriodicalId":49886,"journal":{"name":"Manufacturing Engineering","volume":"21 1","pages":""},"PeriodicalIF":0.1000,"publicationDate":"2013-01-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Constant Salvage Value Models: A Source of Systematic Bias in Predicting the Value of Lead-Time Reduction\",\"authors\":\"Stefan Wager, Suzanne de Treville\",\"doi\":\"10.2139/ssrn.2202422\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The assumption that unsold goods can be liquidated at a constant salvage value is widespread in inventory theory. We show that, under general mathematical conditions, this modeling assumption will cause companies to underestimate both the value of lead-time reduction and the cost of lead time increases. Our result does not require that companies actively consider the possibility of non-constant salvage values. Rather we show that, in an environment where salvage values are allowed to depend on the amount of overage, a firm that cuts lead times according to a strategy that assumes a constant salvage value will earn more money than predicted from its lead-time reduction.\",\"PeriodicalId\":49886,\"journal\":{\"name\":\"Manufacturing Engineering\",\"volume\":\"21 1\",\"pages\":\"\"},\"PeriodicalIF\":0.1000,\"publicationDate\":\"2013-01-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Manufacturing Engineering\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.2139/ssrn.2202422\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, MANUFACTURING\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Manufacturing Engineering","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.2139/ssrn.2202422","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, MANUFACTURING","Score":null,"Total":0}
引用次数: 2

摘要

存货理论中普遍认为未售出的货物可以以恒定的残值进行清算。我们表明,在一般的数学条件下,这种建模假设将导致公司低估减少交货时间的价值和交货时间增加的成本。我们的结果并不要求公司积极考虑非恒定残值的可能性。相反,我们表明,在一个允许打捞价值取决于超额金额的环境中,根据假设打捞价值不变的策略削减交货时间的公司将从其减少交货时间中赚取比预期更多的钱。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Constant Salvage Value Models: A Source of Systematic Bias in Predicting the Value of Lead-Time Reduction
The assumption that unsold goods can be liquidated at a constant salvage value is widespread in inventory theory. We show that, under general mathematical conditions, this modeling assumption will cause companies to underestimate both the value of lead-time reduction and the cost of lead time increases. Our result does not require that companies actively consider the possibility of non-constant salvage values. Rather we show that, in an environment where salvage values are allowed to depend on the amount of overage, a firm that cuts lead times according to a strategy that assumes a constant salvage value will earn more money than predicted from its lead-time reduction.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Manufacturing Engineering
Manufacturing Engineering 工程技术-工程:制造
自引率
0.00%
发文量
0
审稿时长
6-12 weeks
期刊介绍: Information not localized
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信