对三宝垄水灾影响公共基础设施的损害评估

Ilham Sahid Wismana Putra, F. Hermawan, J. U. D. Hatmoko
{"title":"对三宝垄水灾影响公共基础设施的损害评估","authors":"Ilham Sahid Wismana Putra, F. Hermawan, J. U. D. Hatmoko","doi":"10.32497/wahanats.v25i2.2154","DOIUrl":null,"url":null,"abstract":"Flood is a disaster that has the biggest threat, in terms of the number of victims or losses. Semarang City is a city that is classified as a flood prone area, this is due to the geographical location in the lowlands and highlands. The impact of the flood disaster caused damage and losses from various sectors of public infrastructure including the education service sector and health services. Damage and loss of public infrastructure will burden the government in the post-flood recovery phase. An assessment of infrastructure damage and losses from flooding is needed in order to help the Semarang City Government prepare a budget plan and manage rehabilitation and reconstruction. The purpose of this research is to explore the loss of public infrastructure due to the impact of the flood disaster, so that it can accelerate the post-disaster recovery process and management strategies for the risk of further flood disasters. The valuation method used is ECLAC (Economic Commission for Latin American and the Caribbean) Method. This method can identify damage and estimate the losses caused by floods. The results of this study are that each public infrastructure building has a different level of damage and loss and the budget allocation for disaster management each year is still inadequate. A risk transfer strategy is needed with an insurance financing scheme based on the level of risk in each infrastructure building.","PeriodicalId":34836,"journal":{"name":"Prokons","volume":"42 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2020-12-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"PENILAIAN KERUSAKAN DAN KERUGIAN INFRASTRUKTUR PUBLIK AKIBAT DAMPAK BENCANA BANJIR DI KOTA SEMARANG\",\"authors\":\"Ilham Sahid Wismana Putra, F. Hermawan, J. U. D. Hatmoko\",\"doi\":\"10.32497/wahanats.v25i2.2154\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Flood is a disaster that has the biggest threat, in terms of the number of victims or losses. Semarang City is a city that is classified as a flood prone area, this is due to the geographical location in the lowlands and highlands. The impact of the flood disaster caused damage and losses from various sectors of public infrastructure including the education service sector and health services. Damage and loss of public infrastructure will burden the government in the post-flood recovery phase. An assessment of infrastructure damage and losses from flooding is needed in order to help the Semarang City Government prepare a budget plan and manage rehabilitation and reconstruction. The purpose of this research is to explore the loss of public infrastructure due to the impact of the flood disaster, so that it can accelerate the post-disaster recovery process and management strategies for the risk of further flood disasters. The valuation method used is ECLAC (Economic Commission for Latin American and the Caribbean) Method. This method can identify damage and estimate the losses caused by floods. The results of this study are that each public infrastructure building has a different level of damage and loss and the budget allocation for disaster management each year is still inadequate. A risk transfer strategy is needed with an insurance financing scheme based on the level of risk in each infrastructure building.\",\"PeriodicalId\":34836,\"journal\":{\"name\":\"Prokons\",\"volume\":\"42 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-12-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Prokons\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.32497/wahanats.v25i2.2154\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Prokons","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.32497/wahanats.v25i2.2154","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

就伤亡人数或损失而言,洪水是一种威胁最大的灾害。三宝垄市是一个被列为洪水易发区的城市,这是由于地理位置在低地和高地。洪水灾害的影响造成公共基础设施各个部门的破坏和损失,包括教育服务部门和保健服务部门。公共基础设施的损坏和损失将给灾后恢复阶段的政府带来负担。需要对洪水造成的基础设施破坏和损失进行评估,以帮助三宝垄市政府制定预算计划并管理恢复和重建工作。本研究的目的在于探讨洪涝灾害对公共基础设施造成的损失,从而加快灾后恢复进程,并为进一步的洪涝灾害风险制定管理策略。所使用的估价方法是拉丁美洲和加勒比经济委员会方法。该方法可以识别洪涝灾害,估算洪涝灾害造成的损失。本研究的结果是,每个公共基础设施都有不同程度的破坏和损失,每年用于灾害管理的预算拨款仍然不足。风险转移策略需要根据每个基础设施建设的风险水平制定保险融资方案。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
PENILAIAN KERUSAKAN DAN KERUGIAN INFRASTRUKTUR PUBLIK AKIBAT DAMPAK BENCANA BANJIR DI KOTA SEMARANG
Flood is a disaster that has the biggest threat, in terms of the number of victims or losses. Semarang City is a city that is classified as a flood prone area, this is due to the geographical location in the lowlands and highlands. The impact of the flood disaster caused damage and losses from various sectors of public infrastructure including the education service sector and health services. Damage and loss of public infrastructure will burden the government in the post-flood recovery phase. An assessment of infrastructure damage and losses from flooding is needed in order to help the Semarang City Government prepare a budget plan and manage rehabilitation and reconstruction. The purpose of this research is to explore the loss of public infrastructure due to the impact of the flood disaster, so that it can accelerate the post-disaster recovery process and management strategies for the risk of further flood disasters. The valuation method used is ECLAC (Economic Commission for Latin American and the Caribbean) Method. This method can identify damage and estimate the losses caused by floods. The results of this study are that each public infrastructure building has a different level of damage and loss and the budget allocation for disaster management each year is still inadequate. A risk transfer strategy is needed with an insurance financing scheme based on the level of risk in each infrastructure building.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
6
审稿时长
8 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信