{"title":"公共采购(及特许合同)变更的可采性问题","authors":"Aleksij Mužina","doi":"10.4335/20.3.685-714(2022)","DOIUrl":null,"url":null,"abstract":"The central part of the scientific article is the analysis of the problem of the admissibility of modifications of public procurement contracts and concession contracts. After the awarding of a concession or a public procurement contract, these may not be substantially changed by an agreement between the contracting authority and the successful tenderer. The research is initially focused to an analysis of the development of the legal institute in the case law of the Court of Justice and its transposition into secondary legislation of the European Union. This is followed by a comparison of the regulation in the acquis communautaire with the regulation in Slovenian positive law. The problems of the admissibility of modifications to public procurement contracts/concessions (this is the central part of the article) should be supplemented by formulating a thesis on the possible extension of comparable standards of interpretation of admissibility from the contractual (implementation) to the tendering stage of public procurement/concession. \nIn this scientific paper, I therefore point out (which was the purpose of the scientific paper) the hypothesis that all modifications in public procurement procedures and concession award procedures must be treated equally, regardless of the stage a relationship creation or implementation process. A different position would be administrative and contrary to the necessary functional interpretation of EU law. The modification cannot becomes admissible at the time of the conclusion of the contract, while prior to that, this modification (which would already form part of the contractual relationship) is not admissible.","PeriodicalId":51875,"journal":{"name":"Lex Localis-Journal of Local Self-Government","volume":"11 1","pages":""},"PeriodicalIF":0.5000,"publicationDate":"2022-06-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"The Problem of the Admissibility of Modifications to Public Procurement (and Concession Contracts)\",\"authors\":\"Aleksij Mužina\",\"doi\":\"10.4335/20.3.685-714(2022)\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The central part of the scientific article is the analysis of the problem of the admissibility of modifications of public procurement contracts and concession contracts. After the awarding of a concession or a public procurement contract, these may not be substantially changed by an agreement between the contracting authority and the successful tenderer. The research is initially focused to an analysis of the development of the legal institute in the case law of the Court of Justice and its transposition into secondary legislation of the European Union. This is followed by a comparison of the regulation in the acquis communautaire with the regulation in Slovenian positive law. The problems of the admissibility of modifications to public procurement contracts/concessions (this is the central part of the article) should be supplemented by formulating a thesis on the possible extension of comparable standards of interpretation of admissibility from the contractual (implementation) to the tendering stage of public procurement/concession. \\nIn this scientific paper, I therefore point out (which was the purpose of the scientific paper) the hypothesis that all modifications in public procurement procedures and concession award procedures must be treated equally, regardless of the stage a relationship creation or implementation process. A different position would be administrative and contrary to the necessary functional interpretation of EU law. The modification cannot becomes admissible at the time of the conclusion of the contract, while prior to that, this modification (which would already form part of the contractual relationship) is not admissible.\",\"PeriodicalId\":51875,\"journal\":{\"name\":\"Lex Localis-Journal of Local Self-Government\",\"volume\":\"11 1\",\"pages\":\"\"},\"PeriodicalIF\":0.5000,\"publicationDate\":\"2022-06-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Lex Localis-Journal of Local Self-Government\",\"FirstCategoryId\":\"91\",\"ListUrlMain\":\"https://doi.org/10.4335/20.3.685-714(2022)\",\"RegionNum\":4,\"RegionCategory\":\"管理学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"POLITICAL SCIENCE\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Lex Localis-Journal of Local Self-Government","FirstCategoryId":"91","ListUrlMain":"https://doi.org/10.4335/20.3.685-714(2022)","RegionNum":4,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"POLITICAL SCIENCE","Score":null,"Total":0}
引用次数: 1

摘要

本文的核心部分是对公共采购合同和特许合同修改的可采性问题的分析。在授予特许权或公共采购合同后,这些不得因合同当局与中标者之间的协议而发生实质性改变。研究的最初重点是分析法院判例法中的法律机构的发展及其向欧洲联盟次级立法的转变。接着,将共同法中的规定与斯洛文尼亚成文法中的规定进行比较。对公共采购合同/特许的修改的可接受性问题(这是文章的中心部分)应该通过制定一个关于可接受性解释的可比标准从合同(实施)延伸到公共采购/特许的招标阶段的可能性的论文加以补充。因此,在这篇科学论文中,我指出(这是这篇科学论文的目的)一个假设,即公共采购程序和特许权授予程序的所有修改都必须平等对待,无论关系建立或实施过程的阶段如何。不同的立场将是行政性的,与欧盟法律的必要功能性解释相悖。修改不能在合同订立时被接受,而在此之前,这种修改(已经构成合同关系的一部分)是不被接受的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The Problem of the Admissibility of Modifications to Public Procurement (and Concession Contracts)
The central part of the scientific article is the analysis of the problem of the admissibility of modifications of public procurement contracts and concession contracts. After the awarding of a concession or a public procurement contract, these may not be substantially changed by an agreement between the contracting authority and the successful tenderer. The research is initially focused to an analysis of the development of the legal institute in the case law of the Court of Justice and its transposition into secondary legislation of the European Union. This is followed by a comparison of the regulation in the acquis communautaire with the regulation in Slovenian positive law. The problems of the admissibility of modifications to public procurement contracts/concessions (this is the central part of the article) should be supplemented by formulating a thesis on the possible extension of comparable standards of interpretation of admissibility from the contractual (implementation) to the tendering stage of public procurement/concession. In this scientific paper, I therefore point out (which was the purpose of the scientific paper) the hypothesis that all modifications in public procurement procedures and concession award procedures must be treated equally, regardless of the stage a relationship creation or implementation process. A different position would be administrative and contrary to the necessary functional interpretation of EU law. The modification cannot becomes admissible at the time of the conclusion of the contract, while prior to that, this modification (which would already form part of the contractual relationship) is not admissible.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
1.10
自引率
25.00%
发文量
31
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信