建立一个新的图书馆:规划、挑战和经验教训。卡塔尔国家图书馆案例研究

Q2 Social Sciences
K. Medawar
{"title":"建立一个新的图书馆:规划、挑战和经验教训。卡塔尔国家图书馆案例研究","authors":"K. Medawar","doi":"10.1080/10572317.2021.1898757","DOIUrl":null,"url":null,"abstract":"Abstract Prior to the opening of the Qatar National Library (QNL) in November 2017, the library went through an extensive planning and development process. This included constructing the building itself, which would house the collections, staff, and public spaces; testing the IT infrastructure; team building; processing newly acquired materials; and moving all the equipment, large and small, to the new building. This article focuses on the planning process for moving the library’s collections and covers the various steps taken to ensure success on opening day. It also describes the challenges faced during the planning process and after the move to the new building. While libraries do not move often, this article was written in the hopes of helping those who find themselves in this unique situation.","PeriodicalId":39917,"journal":{"name":"International Information and Library Review","volume":"121 1","pages":"84 - 96"},"PeriodicalIF":0.0000,"publicationDate":"2021-01-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Setting up a New Library: Planning, Challenges, and Lessons Learned. A Case Study about Qatar National Library\",\"authors\":\"K. Medawar\",\"doi\":\"10.1080/10572317.2021.1898757\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract Prior to the opening of the Qatar National Library (QNL) in November 2017, the library went through an extensive planning and development process. This included constructing the building itself, which would house the collections, staff, and public spaces; testing the IT infrastructure; team building; processing newly acquired materials; and moving all the equipment, large and small, to the new building. This article focuses on the planning process for moving the library’s collections and covers the various steps taken to ensure success on opening day. It also describes the challenges faced during the planning process and after the move to the new building. While libraries do not move often, this article was written in the hopes of helping those who find themselves in this unique situation.\",\"PeriodicalId\":39917,\"journal\":{\"name\":\"International Information and Library Review\",\"volume\":\"121 1\",\"pages\":\"84 - 96\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-01-02\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Information and Library Review\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/10572317.2021.1898757\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"Social Sciences\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Information and Library Review","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/10572317.2021.1898757","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Social Sciences","Score":null,"Total":0}
引用次数: 1

摘要

在2017年11月卡塔尔国家图书馆(QNL)开放之前,该图书馆经历了广泛的规划和开发过程。这包括建造建筑本身,它将容纳藏品、工作人员和公共空间;测试资讯科技基础设施;团队建设;处理新获得的材料;把所有大大小小的设备搬到新楼。本文重点介绍图书馆馆藏迁移的规划过程,以及为确保开幕日顺利进行所采取的各项措施。它还描述了在规划过程中以及搬迁到新建筑后所面临的挑战。虽然图书馆并不经常移动,但本文的目的是希望帮助那些发现自己处于这种独特情况的人。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Setting up a New Library: Planning, Challenges, and Lessons Learned. A Case Study about Qatar National Library
Abstract Prior to the opening of the Qatar National Library (QNL) in November 2017, the library went through an extensive planning and development process. This included constructing the building itself, which would house the collections, staff, and public spaces; testing the IT infrastructure; team building; processing newly acquired materials; and moving all the equipment, large and small, to the new building. This article focuses on the planning process for moving the library’s collections and covers the various steps taken to ensure success on opening day. It also describes the challenges faced during the planning process and after the move to the new building. While libraries do not move often, this article was written in the hopes of helping those who find themselves in this unique situation.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
International Information and Library Review
International Information and Library Review Social Sciences-Library and Information Sciences
CiteScore
2.40
自引率
0.00%
发文量
34
期刊介绍: For more than twenty years, the International Information and Library Review has been welcomed by information scientists, librarians and other scholars and practitioners all over the world for its timely articles on research and development in international and comparative librarianship, information sciences, information policy and information ethics, digital values and digital libraries. Contributions to the journal have come from staff or members of many different international organizations, including the United Nations, UNESCO, IFLA, and INTAMEL, and from library and information scientists in academia, government, industry, and other organizations.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信