{"title":"尽量减少COVID-19对建筑业影响的策略:以马来西亚建筑工地集群为例","authors":"Farah Salwati Binti Ibrahim, M. Esa, Ernawati Mustafa Kamal","doi":"10.5130/ajceb.v22i3.8064","DOIUrl":null,"url":null,"abstract":"Malaysia has seen the third wave of infection since the start of the global COVID-19 pandemic, with approximately 103 construction sites involving over 14,667 workers reported from April 2020 to February 2021. This has led to limited progress in construction projects or a complete halt, resulting in late project delivery. The purpose of this paper is to investigate the factors influencing the spread of COVID-19 and the strategies taken by the affected construction sites to mitigate the spread of the outbreak. The researchers adopted a case study approach with a multiple-case design and discusses the use of an in-depth interviewing method to collect rich data on the studied phenomenon. Data were collected from three construction sites. The sites were mixed development projects in nature and provided in-depth, rigorous, and robust information. Based on the results, two categories of factors influencing the spread of COVID-19 were established. These are primary and secondary factors, such as workers’ mobilisation, uncontrolled movement of workers, and the limited practice of social distancing. Furthermore, evidence suggests that the strategies adopted to control the effects of the pandemic were a combination of government enforcement and initiatives taken by construction companies. This paper concludes that an early identification of the causes of the spread will enable appropriate implementation strategies to control the outbreak. This study is an attempt to present the experiences of one developing country as an example of a means of dealing with unexpected pandemics or other intractable diseases that can affect project delivery.","PeriodicalId":51729,"journal":{"name":"Construction Economics and Building","volume":null,"pages":null},"PeriodicalIF":1.8000,"publicationDate":"2022-09-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Strategies to Minimise the Impact of COVID-19 on the Construction Industry: A Case Study of Construction Site Clusters in Malaysia\",\"authors\":\"Farah Salwati Binti Ibrahim, M. Esa, Ernawati Mustafa Kamal\",\"doi\":\"10.5130/ajceb.v22i3.8064\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Malaysia has seen the third wave of infection since the start of the global COVID-19 pandemic, with approximately 103 construction sites involving over 14,667 workers reported from April 2020 to February 2021. This has led to limited progress in construction projects or a complete halt, resulting in late project delivery. The purpose of this paper is to investigate the factors influencing the spread of COVID-19 and the strategies taken by the affected construction sites to mitigate the spread of the outbreak. The researchers adopted a case study approach with a multiple-case design and discusses the use of an in-depth interviewing method to collect rich data on the studied phenomenon. Data were collected from three construction sites. The sites were mixed development projects in nature and provided in-depth, rigorous, and robust information. Based on the results, two categories of factors influencing the spread of COVID-19 were established. These are primary and secondary factors, such as workers’ mobilisation, uncontrolled movement of workers, and the limited practice of social distancing. Furthermore, evidence suggests that the strategies adopted to control the effects of the pandemic were a combination of government enforcement and initiatives taken by construction companies. This paper concludes that an early identification of the causes of the spread will enable appropriate implementation strategies to control the outbreak. This study is an attempt to present the experiences of one developing country as an example of a means of dealing with unexpected pandemics or other intractable diseases that can affect project delivery.\",\"PeriodicalId\":51729,\"journal\":{\"name\":\"Construction Economics and Building\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.8000,\"publicationDate\":\"2022-09-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Construction Economics and Building\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5130/ajceb.v22i3.8064\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"MANAGEMENT\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Construction Economics and Building","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5130/ajceb.v22i3.8064","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
Strategies to Minimise the Impact of COVID-19 on the Construction Industry: A Case Study of Construction Site Clusters in Malaysia
Malaysia has seen the third wave of infection since the start of the global COVID-19 pandemic, with approximately 103 construction sites involving over 14,667 workers reported from April 2020 to February 2021. This has led to limited progress in construction projects or a complete halt, resulting in late project delivery. The purpose of this paper is to investigate the factors influencing the spread of COVID-19 and the strategies taken by the affected construction sites to mitigate the spread of the outbreak. The researchers adopted a case study approach with a multiple-case design and discusses the use of an in-depth interviewing method to collect rich data on the studied phenomenon. Data were collected from three construction sites. The sites were mixed development projects in nature and provided in-depth, rigorous, and robust information. Based on the results, two categories of factors influencing the spread of COVID-19 were established. These are primary and secondary factors, such as workers’ mobilisation, uncontrolled movement of workers, and the limited practice of social distancing. Furthermore, evidence suggests that the strategies adopted to control the effects of the pandemic were a combination of government enforcement and initiatives taken by construction companies. This paper concludes that an early identification of the causes of the spread will enable appropriate implementation strategies to control the outbreak. This study is an attempt to present the experiences of one developing country as an example of a means of dealing with unexpected pandemics or other intractable diseases that can affect project delivery.
期刊介绍:
Construction Economics and Building (formerly known as the Australasian Journal of Construction Economics and Building [AJCEB]) is a peer reviewed, open access publication for original research into all aspects of the economics and management of building and construction, quantity surveying and property management as well as construction and property education. It is free for authors, readers and libraries.