{"title":"连续油管人工举升,用于加州近海Monterey地层的流量测试","authors":"Peavy, R. A. Fahel","doi":"10.2118/20024-PA","DOIUrl":null,"url":null,"abstract":"This paper provides a technical comparison of jet-pump and nitrogen lift during the drillstem tests (DST's) of a low-gravity, high-viscosity crude on a semisubmersible drilling vessel. Eight DST testing sequences are presented to demonstrate that jet-pump-lift operations are better suited than nitrogen-lift techniques for obtaining reservoir data during Monterey DST's.","PeriodicalId":22020,"journal":{"name":"Spe Production Engineering","volume":"51 1","pages":"142-146"},"PeriodicalIF":0.0000,"publicationDate":"1991-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Artificial lift with coiled tubing for flow testing the Monterey formation, offshore California\",\"authors\":\"Peavy, R. A. Fahel\",\"doi\":\"10.2118/20024-PA\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper provides a technical comparison of jet-pump and nitrogen lift during the drillstem tests (DST's) of a low-gravity, high-viscosity crude on a semisubmersible drilling vessel. Eight DST testing sequences are presented to demonstrate that jet-pump-lift operations are better suited than nitrogen-lift techniques for obtaining reservoir data during Monterey DST's.\",\"PeriodicalId\":22020,\"journal\":{\"name\":\"Spe Production Engineering\",\"volume\":\"51 1\",\"pages\":\"142-146\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1991-05-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Spe Production Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/20024-PA\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Spe Production Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/20024-PA","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Artificial lift with coiled tubing for flow testing the Monterey formation, offshore California
This paper provides a technical comparison of jet-pump and nitrogen lift during the drillstem tests (DST's) of a low-gravity, high-viscosity crude on a semisubmersible drilling vessel. Eight DST testing sequences are presented to demonstrate that jet-pump-lift operations are better suited than nitrogen-lift techniques for obtaining reservoir data during Monterey DST's.