Krisda Bimas Permada, I. N. Setiawan, I. A. Arta Wijaya
{"title":"设计学院经济学学院屋顶","authors":"Krisda Bimas Permada, I. N. Setiawan, I. A. Arta Wijaya","doi":"10.24843/spektrum.2022.v09.i01.p5","DOIUrl":null,"url":null,"abstract":"Rooftop solar power plant is energy that utilizes solar energy as anenergy source which is then converted into electrical energy as well as analternative to environmentally friendly electricity generation. Rooftop solar power plants can beinstalled on the roofs of large buildings,the roof of the STIE Widya Gama campus with an areaof 2698.4 m2. Rooftop solar power plant aims as an additional power supply to supply electricalpower to the Sekolah Tinggi Ilmu Ekonomi Widya Gama Lumajang campus of 53 kVA installedpower on transformer 1. The design of a rooftop solar power plant at the STIE Widya GamaLumajang Campus uses 100 solar modules of type Vertex TSM-DE18M(II) 500 Wp. Inverterwith a capacity of 53 kVA as much as 1 unit type SUNNY TRIPOWER CORE1.solar power plants produce electrical energy of 82322,2 kWh/year to supply theload on STIE Widya Gama Lumajang. Initial investment capital of Rp. 567.005.500maintenance and operation costs of 1% of the investment capital cost of Rp.5.670.055 and payback periode for 14 years 6 months if inflation in Indonesia is4.25%.","PeriodicalId":30870,"journal":{"name":"Jurnal Ilmiah Spektrum","volume":"48 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"PERANCANGAN PLTS ATAP DI KAMPUS SEKOLAH TINGGI ILMU EKONOMI WIDYA GAMA LUMAJANG\",\"authors\":\"Krisda Bimas Permada, I. N. Setiawan, I. A. Arta Wijaya\",\"doi\":\"10.24843/spektrum.2022.v09.i01.p5\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Rooftop solar power plant is energy that utilizes solar energy as anenergy source which is then converted into electrical energy as well as analternative to environmentally friendly electricity generation. Rooftop solar power plants can beinstalled on the roofs of large buildings,the roof of the STIE Widya Gama campus with an areaof 2698.4 m2. Rooftop solar power plant aims as an additional power supply to supply electricalpower to the Sekolah Tinggi Ilmu Ekonomi Widya Gama Lumajang campus of 53 kVA installedpower on transformer 1. The design of a rooftop solar power plant at the STIE Widya GamaLumajang Campus uses 100 solar modules of type Vertex TSM-DE18M(II) 500 Wp. Inverterwith a capacity of 53 kVA as much as 1 unit type SUNNY TRIPOWER CORE1.solar power plants produce electrical energy of 82322,2 kWh/year to supply theload on STIE Widya Gama Lumajang. Initial investment capital of Rp. 567.005.500maintenance and operation costs of 1% of the investment capital cost of Rp.5.670.055 and payback periode for 14 years 6 months if inflation in Indonesia is4.25%.\",\"PeriodicalId\":30870,\"journal\":{\"name\":\"Jurnal Ilmiah Spektrum\",\"volume\":\"48 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-04-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Ilmiah Spektrum\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24843/spektrum.2022.v09.i01.p5\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Ilmiah Spektrum","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24843/spektrum.2022.v09.i01.p5","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
摘要
屋顶太阳能电站是利用太阳能作为能源,将其转化为电能的一种能源,也是一种环保发电的替代能源。屋顶太阳能发电厂可以安装在大型建筑物的屋顶上,STIE Widya Gama校区的屋顶面积为2698.4平方米。屋顶太阳能发电厂的目标是作为一个额外的电源,为Sekolah Tinggi Ilmu Ekonomi Widya Gama Lumajang校园提供53千伏安的电力,安装在变压器1上。STIE Widya GamaLumajang校区屋顶太阳能发电厂的设计使用了100个Vertex tm - de18m (II) 500 Wp型太阳能组件。容量为53千伏安的逆变器多达1台SUNNY TRIPOWER CORE1型。太阳能发电厂每年产生82322.2千瓦时的电能,供应威迪亚伽马卢马江水电站的负荷。初始投资资本为567.005.500印尼盾,维护和运营成本为5.670.055印尼盾投资资本成本的1%,如果印度尼西亚的通货膨胀率为4.25%,则投资回收期为14年6个月。
PERANCANGAN PLTS ATAP DI KAMPUS SEKOLAH TINGGI ILMU EKONOMI WIDYA GAMA LUMAJANG
Rooftop solar power plant is energy that utilizes solar energy as anenergy source which is then converted into electrical energy as well as analternative to environmentally friendly electricity generation. Rooftop solar power plants can beinstalled on the roofs of large buildings,the roof of the STIE Widya Gama campus with an areaof 2698.4 m2. Rooftop solar power plant aims as an additional power supply to supply electricalpower to the Sekolah Tinggi Ilmu Ekonomi Widya Gama Lumajang campus of 53 kVA installedpower on transformer 1. The design of a rooftop solar power plant at the STIE Widya GamaLumajang Campus uses 100 solar modules of type Vertex TSM-DE18M(II) 500 Wp. Inverterwith a capacity of 53 kVA as much as 1 unit type SUNNY TRIPOWER CORE1.solar power plants produce electrical energy of 82322,2 kWh/year to supply theload on STIE Widya Gama Lumajang. Initial investment capital of Rp. 567.005.500maintenance and operation costs of 1% of the investment capital cost of Rp.5.670.055 and payback periode for 14 years 6 months if inflation in Indonesia is4.25%.