韩国核电厂(NPP)虚拟现实系统开发的介绍*

Lim Byung
{"title":"韩国核电厂(NPP)虚拟现实系统开发的介绍*","authors":"Lim Byung","doi":"10.1109/COASE.2018.8560486","DOIUrl":null,"url":null,"abstract":"By using Virtual Reality(VR) technology which is one of the core technologies 4th industry revolution, we are developing VR System development for Nuclear power plants from April 2018 to March 2021. This Research and Development(R&D) project includes VR based “Walk-down System development”, “optimal path tracking system development”, “major equipment transfer and installation simulation”, etc. When fully developed, These R&D results will be applied the construction of the Shin-Kori unit 5,6 nuclear power plant construction to check design interference, to establish work planning, and to effectively collect construction experience knowledges to improve our future construction projects in the future. This paper will introduce major technological developments contents of this R&D project. It is expected that the results of this study will contribute dramatically to enhance the efficiency of nuclear power plant design process and the method of construction by simulating installation method of major equipment such as reactor, steam generators and turbine before installing them in the Shin-Kori unit 5,6.","PeriodicalId":6518,"journal":{"name":"2018 IEEE 14th International Conference on Automation Science and Engineering (CASE)","volume":"21 1","pages":"152-155"},"PeriodicalIF":0.0000,"publicationDate":"2018-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The introduction of VR System development for Nuclear Power Plant(NPP) in Korea*\",\"authors\":\"Lim Byung\",\"doi\":\"10.1109/COASE.2018.8560486\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"By using Virtual Reality(VR) technology which is one of the core technologies 4th industry revolution, we are developing VR System development for Nuclear power plants from April 2018 to March 2021. This Research and Development(R&D) project includes VR based “Walk-down System development”, “optimal path tracking system development”, “major equipment transfer and installation simulation”, etc. When fully developed, These R&D results will be applied the construction of the Shin-Kori unit 5,6 nuclear power plant construction to check design interference, to establish work planning, and to effectively collect construction experience knowledges to improve our future construction projects in the future. This paper will introduce major technological developments contents of this R&D project. It is expected that the results of this study will contribute dramatically to enhance the efficiency of nuclear power plant design process and the method of construction by simulating installation method of major equipment such as reactor, steam generators and turbine before installing them in the Shin-Kori unit 5,6.\",\"PeriodicalId\":6518,\"journal\":{\"name\":\"2018 IEEE 14th International Conference on Automation Science and Engineering (CASE)\",\"volume\":\"21 1\",\"pages\":\"152-155\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 IEEE 14th International Conference on Automation Science and Engineering (CASE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/COASE.2018.8560486\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 IEEE 14th International Conference on Automation Science and Engineering (CASE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/COASE.2018.8560486","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

从2018年4月到2021年3月,我们将利用第四次工业革命的核心技术之一虚拟现实(VR)技术,为核电站开发VR系统。本研发项目包括基于VR的“Walk-down系统开发”、“最优路径跟踪系统开发”、“重大设备转移与安装仿真”等。这些研究成果将应用于新古里核电站5、6号机组的建设中,以检查设计干扰,制定工作计划,并有效地收集施工经验知识,以改善我们未来的建设项目。本文将介绍该研发项目的主要技术开发内容。通过对新古里5号机组、6号机组的主要设备,如反应堆、蒸汽发生器、汽轮机等进行安装前的模拟安装,预计将对提高核电站设计过程的效率和施工方法做出重大贡献。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The introduction of VR System development for Nuclear Power Plant(NPP) in Korea*
By using Virtual Reality(VR) technology which is one of the core technologies 4th industry revolution, we are developing VR System development for Nuclear power plants from April 2018 to March 2021. This Research and Development(R&D) project includes VR based “Walk-down System development”, “optimal path tracking system development”, “major equipment transfer and installation simulation”, etc. When fully developed, These R&D results will be applied the construction of the Shin-Kori unit 5,6 nuclear power plant construction to check design interference, to establish work planning, and to effectively collect construction experience knowledges to improve our future construction projects in the future. This paper will introduce major technological developments contents of this R&D project. It is expected that the results of this study will contribute dramatically to enhance the efficiency of nuclear power plant design process and the method of construction by simulating installation method of major equipment such as reactor, steam generators and turbine before installing them in the Shin-Kori unit 5,6.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信