关丹新乡基础设施扩建的概念风险评估

O. M. Affendy, O.M.Affendy, M. F. Omardin, N.F Ishak, K.J.Abd Omar, F. Hamid, P. D. Mansur, N. A. Lau, M. Tutur, K. Mustafa, M. Mansor, Lee
{"title":"关丹新乡基础设施扩建的概念风险评估","authors":"O. M. Affendy, O.M.Affendy, M. F. Omardin, N.F Ishak, K.J.Abd Omar, F. Hamid, P. D. Mansur, N. A. Lau, M. Tutur, K. Mustafa, M. Mansor, Lee","doi":"10.15282/ijets.10.1.2023.1002","DOIUrl":null,"url":null,"abstract":"This paper intends to contribute about the risk assessment on New Township located at Kuantan. Researchers found that, it has a lot of risk that will occur at that area. Researchers found that it have 5 possible risk like disease, flooding, traffic risk, soil erosion and the improper drainage system. Then, researchers will choose the top 3 major risk to do the risk assessment. So, researchers choose traffic risk, soil erosion and the improper drainage system as our major risk in this project. Lastly, researchers also have implement the solution to solve the risk..","PeriodicalId":23608,"journal":{"name":"World Academy of Science, Engineering and Technology, International Journal of Medical and Health Sciences","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-06-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Conceptual Risk Assessment for New Township Infrastructure Expansion at Kuantan\",\"authors\":\"O. M. Affendy, O.M.Affendy, M. F. Omardin, N.F Ishak, K.J.Abd Omar, F. Hamid, P. D. Mansur, N. A. Lau, M. Tutur, K. Mustafa, M. Mansor, Lee\",\"doi\":\"10.15282/ijets.10.1.2023.1002\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper intends to contribute about the risk assessment on New Township located at Kuantan. Researchers found that, it has a lot of risk that will occur at that area. Researchers found that it have 5 possible risk like disease, flooding, traffic risk, soil erosion and the improper drainage system. Then, researchers will choose the top 3 major risk to do the risk assessment. So, researchers choose traffic risk, soil erosion and the improper drainage system as our major risk in this project. Lastly, researchers also have implement the solution to solve the risk..\",\"PeriodicalId\":23608,\"journal\":{\"name\":\"World Academy of Science, Engineering and Technology, International Journal of Medical and Health Sciences\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-06-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"World Academy of Science, Engineering and Technology, International Journal of Medical and Health Sciences\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.15282/ijets.10.1.2023.1002\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"World Academy of Science, Engineering and Technology, International Journal of Medical and Health Sciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.15282/ijets.10.1.2023.1002","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文旨在对关丹新市镇的风险评估作出贡献。研究人员发现,在那个区域会发生很多风险。研究人员发现,它有5种可能的风险,如疾病、洪水、交通风险、土壤侵蚀和排水系统不当。然后,研究人员将选择前3个主要风险进行风险评估。因此,研究人员选择了交通风险、土壤侵蚀和排水系统不当作为我们在这个项目中的主要风险。最后,研究人员还实施了解决风险的方案。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Conceptual Risk Assessment for New Township Infrastructure Expansion at Kuantan
This paper intends to contribute about the risk assessment on New Township located at Kuantan. Researchers found that, it has a lot of risk that will occur at that area. Researchers found that it have 5 possible risk like disease, flooding, traffic risk, soil erosion and the improper drainage system. Then, researchers will choose the top 3 major risk to do the risk assessment. So, researchers choose traffic risk, soil erosion and the improper drainage system as our major risk in this project. Lastly, researchers also have implement the solution to solve the risk..
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信