{"title":"Brescia无人驾驶地铁线路- San Faustino站:业主、监理、设计师和P&CM在施工阶段的联合工作实例","authors":"A. Merlini, A. Breda, I. Carbone, M. Gatti","doi":"10.1201/9780429424441-623","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":69598,"journal":{"name":"地下工程与隧道","volume":"7 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-04-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Brescia Driverless Metro Line – San Faustino Station: A joint work example between client, superintendence, designer and P&CM during the construction phase\",\"authors\":\"A. Merlini, A. Breda, I. Carbone, M. Gatti\",\"doi\":\"10.1201/9780429424441-623\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":69598,\"journal\":{\"name\":\"地下工程与隧道\",\"volume\":\"7 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-04-17\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"地下工程与隧道\",\"FirstCategoryId\":\"1087\",\"ListUrlMain\":\"https://doi.org/10.1201/9780429424441-623\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"地下工程与隧道","FirstCategoryId":"1087","ListUrlMain":"https://doi.org/10.1201/9780429424441-623","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Brescia Driverless Metro Line – San Faustino Station: A joint work example between client, superintendence, designer and P&CM during the construction phase