{"title":"用全职当量(FTE)方法确定Arsy面包店的体力工作量和理想工人人数","authors":"Noni Oktiana Setiowati, Muhamad Imron Zamzani","doi":"10.37859/jst.v10i1.4563","DOIUrl":null,"url":null,"abstract":"Arsy Bakery is one of the MSMEs located in Karang Joang, Balikpapan. This bakery produces five types of bread: white bread, sweat bread, mocha bread, cheese chocolate bread, and three-flavored bread. Arsy bakery could produce approximately 4000 loaves of bread weekly. This study aims to calculate the quantity of physical workload of Arsy bakery workers based on Full Time Equivalent (FTE) method and determine the ideal number of workers required. FTE is a workload analysis method that measures the length of time to complete the tasks in production process. The workload quantity for every worker is obtained based on the time measurements and calculation results. Based on the results of this study, the amount of workload that carried out by Worker 1 is 1.67, meanwhile the amount of workload carried out by Worker 2 is 1.60. These values show that both workers can be categorized as overload. The total FTE value for two workers is 3.27 which means that there should be 3 employees to finish Worker 1 and Worker 2 tasks. In conclusion, Arsy Bakery needs to recruit 1 new employee to reduce high workload of the current employees.","PeriodicalId":17743,"journal":{"name":"Jurnal Surya Teknika","volume":"119 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-06-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Determination of Physical Workload and the Ideal Number of Workers in Arsy Bakery using Full Time Equivalent (FTE) Method\",\"authors\":\"Noni Oktiana Setiowati, Muhamad Imron Zamzani\",\"doi\":\"10.37859/jst.v10i1.4563\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Arsy Bakery is one of the MSMEs located in Karang Joang, Balikpapan. This bakery produces five types of bread: white bread, sweat bread, mocha bread, cheese chocolate bread, and three-flavored bread. Arsy bakery could produce approximately 4000 loaves of bread weekly. This study aims to calculate the quantity of physical workload of Arsy bakery workers based on Full Time Equivalent (FTE) method and determine the ideal number of workers required. FTE is a workload analysis method that measures the length of time to complete the tasks in production process. The workload quantity for every worker is obtained based on the time measurements and calculation results. Based on the results of this study, the amount of workload that carried out by Worker 1 is 1.67, meanwhile the amount of workload carried out by Worker 2 is 1.60. These values show that both workers can be categorized as overload. The total FTE value for two workers is 3.27 which means that there should be 3 employees to finish Worker 1 and Worker 2 tasks. In conclusion, Arsy Bakery needs to recruit 1 new employee to reduce high workload of the current employees.\",\"PeriodicalId\":17743,\"journal\":{\"name\":\"Jurnal Surya Teknika\",\"volume\":\"119 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-06-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Surya Teknika\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.37859/jst.v10i1.4563\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Surya Teknika","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.37859/jst.v10i1.4563","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
Arsy Bakery是位于巴厘巴盘Karang Joang的中小微企业之一。这家面包店生产五种面包:白面包、汗面包、摩卡面包、奶酪巧克力面包和三种口味的面包。一家面包店每周能生产大约4000条面包。本研究旨在以全职当量(Full Time Equivalent, FTE)方法计算Arsy烘焙工人的体力工作量,并确定理想的工人数量。FTE是一种工作量分析方法,用于测量生产过程中完成任务所需的时间长度。每个工人的工作量是根据时间测量和计算结果得出的。根据本研究的结果,工人1的工作量为1.67,工人2的工作量为1.60。这些值表明两个工人都可以被归类为过载。两名工人的总FTE值为3.27,这意味着应该有3名员工来完成工人1和工人2的任务。综上所述,Arsy Bakery需要招聘1名新员工,以减少现有员工的高工作量。
Determination of Physical Workload and the Ideal Number of Workers in Arsy Bakery using Full Time Equivalent (FTE) Method
Arsy Bakery is one of the MSMEs located in Karang Joang, Balikpapan. This bakery produces five types of bread: white bread, sweat bread, mocha bread, cheese chocolate bread, and three-flavored bread. Arsy bakery could produce approximately 4000 loaves of bread weekly. This study aims to calculate the quantity of physical workload of Arsy bakery workers based on Full Time Equivalent (FTE) method and determine the ideal number of workers required. FTE is a workload analysis method that measures the length of time to complete the tasks in production process. The workload quantity for every worker is obtained based on the time measurements and calculation results. Based on the results of this study, the amount of workload that carried out by Worker 1 is 1.67, meanwhile the amount of workload carried out by Worker 2 is 1.60. These values show that both workers can be categorized as overload. The total FTE value for two workers is 3.27 which means that there should be 3 employees to finish Worker 1 and Worker 2 tasks. In conclusion, Arsy Bakery needs to recruit 1 new employee to reduce high workload of the current employees.