好井是增产措施的最佳选择

A. R. Jennings
{"title":"好井是增产措施的最佳选择","authors":"A. R. Jennings","doi":"10.2118/19738-PA","DOIUrl":null,"url":null,"abstract":"When such factors as well response, return on stimulation costs, well cleanup, and sustained productivity are considered, it often becomes apparent that good wells are viable candidates for well stimulation. This paper discusses critical factors related to well-stimulation success, emphasizes that good wells possess the majority of these characteristics, and illustrates technical points with case histories.","PeriodicalId":22020,"journal":{"name":"Spe Production Engineering","volume":"23 1","pages":"371-376"},"PeriodicalIF":0.0000,"publicationDate":"1991-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":"{\"title\":\"Good wells make the best candidates for well stimulation\",\"authors\":\"A. R. Jennings\",\"doi\":\"10.2118/19738-PA\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"When such factors as well response, return on stimulation costs, well cleanup, and sustained productivity are considered, it often becomes apparent that good wells are viable candidates for well stimulation. This paper discusses critical factors related to well-stimulation success, emphasizes that good wells possess the majority of these characteristics, and illustrates technical points with case histories.\",\"PeriodicalId\":22020,\"journal\":{\"name\":\"Spe Production Engineering\",\"volume\":\"23 1\",\"pages\":\"371-376\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1991-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"8\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Spe Production Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/19738-PA\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Spe Production Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/19738-PA","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 8

摘要

当考虑到井响应、增产成本回报、井清理和持续产能等因素时,很明显,好井是可行的增产候选井。本文讨论了与增产成功相关的关键因素,强调了好井具有大多数这些特征,并通过实例说明了技术要点。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Good wells make the best candidates for well stimulation
When such factors as well response, return on stimulation costs, well cleanup, and sustained productivity are considered, it often becomes apparent that good wells are viable candidates for well stimulation. This paper discusses critical factors related to well-stimulation success, emphasizes that good wells possess the majority of these characteristics, and illustrates technical points with case histories.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信