{"title":"地层-井系统中凝析气混合物流动过程的建模","authors":"S. Salimova","doi":"10.37474/0365-8554/2023-04-17-21","DOIUrl":null,"url":null,"abstract":"The gas-hydrodynamic modeling of the exploration process of a gas-condensate formation in the depletion mode based on the equations of the movement of gas-condensate mixture in formation and borehole is offered; on its basis, a calculation algorithm enabling to define bottomhole and formation pressure, as well as the technical-technological parameters of the reservoir production with known wellhead parameters are developed. Technological parameters of the process were estimated according to the data of a specific model.","PeriodicalId":8668,"journal":{"name":"Azerbaijan Oil Industry","volume":"38 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-04-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The modeling of the flow process of gas-condensate mixture in the formation–well system\",\"authors\":\"S. Salimova\",\"doi\":\"10.37474/0365-8554/2023-04-17-21\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The gas-hydrodynamic modeling of the exploration process of a gas-condensate formation in the depletion mode based on the equations of the movement of gas-condensate mixture in formation and borehole is offered; on its basis, a calculation algorithm enabling to define bottomhole and formation pressure, as well as the technical-technological parameters of the reservoir production with known wellhead parameters are developed. Technological parameters of the process were estimated according to the data of a specific model.\",\"PeriodicalId\":8668,\"journal\":{\"name\":\"Azerbaijan Oil Industry\",\"volume\":\"38 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-04-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Azerbaijan Oil Industry\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.37474/0365-8554/2023-04-17-21\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Azerbaijan Oil Industry","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.37474/0365-8554/2023-04-17-21","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
The modeling of the flow process of gas-condensate mixture in the formation–well system
The gas-hydrodynamic modeling of the exploration process of a gas-condensate formation in the depletion mode based on the equations of the movement of gas-condensate mixture in formation and borehole is offered; on its basis, a calculation algorithm enabling to define bottomhole and formation pressure, as well as the technical-technological parameters of the reservoir production with known wellhead parameters are developed. Technological parameters of the process were estimated according to the data of a specific model.