Luqman Q. Ibrahim, Ahmed J. Abid, Adel A. Obed, Ameer L. Saleh, Reheel J. Hassoon
{"title":"巴格达某大学校园光伏系统设计与成本分析的家庭辅助研究","authors":"Luqman Q. Ibrahim, Ahmed J. Abid, Adel A. Obed, Ameer L. Saleh, Reheel J. Hassoon","doi":"10.51173/jt.v5i2.722","DOIUrl":null,"url":null,"abstract":"Due to the lack of electric power generation in Iraq and as a step forward to adopting a sustainable campus of the Electrical Engineering Technical College (EETC), Middle Technical University, in Baghdad, Iraq, and the critical demand for energy in our institutions, particularly educational institutions, this pilot study was proposed. The study aims to analyze the adoption of PV solar systems on the campus in the presence and absence of grid power and how that affects our design discussion in the matter of Net Present Cost (NPC), Cost of Energy (COE), Operation Cost, initial cost, power production, fuel consumption, and the annual net consumed energy from the grid. Forty-five different scenarios were analyzed for all possible cases. The existence of backup generators on the campus was also taken into consideration; G1-350kVA and G2-500kVA. The study has two stages. In the first stage, they used a walkthrough energy audit in the (EETC) to estimate the load profile of the campus, while in the second stage, they used HOMER Pro to analyze this data. The results show that adding an on-grid PV system to the campus grid can reduce the COE by 58%, and it is the best scenario when the grid is present, with an NPC, operation cost ($/yr), and initial capital ($) equal to $77,680, $1,460, and $59,018 respectively. When the grid was absent, the winning scenario was using a PV solar system with a 100-kWh lithium battery storage and a converter. Despite that scenario being the best solution, the produced energy cost is 372% higher than the grid energy cost (0.1 $/kWh) in Iraq, with an NPC, operation cost ($/yr.), and initial capital ($) equal to $337,291, $7,855, and 236878 respectively. Finally, both winning scenarios have no generator, and this will have a high impact on the campus environment.","PeriodicalId":39617,"journal":{"name":"Journal of Biomolecular Techniques","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-06-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A HOMER-Aided Study for PV System Design and Cost Analysis for a College Campus in Baghdad\",\"authors\":\"Luqman Q. Ibrahim, Ahmed J. Abid, Adel A. Obed, Ameer L. Saleh, Reheel J. Hassoon\",\"doi\":\"10.51173/jt.v5i2.722\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Due to the lack of electric power generation in Iraq and as a step forward to adopting a sustainable campus of the Electrical Engineering Technical College (EETC), Middle Technical University, in Baghdad, Iraq, and the critical demand for energy in our institutions, particularly educational institutions, this pilot study was proposed. The study aims to analyze the adoption of PV solar systems on the campus in the presence and absence of grid power and how that affects our design discussion in the matter of Net Present Cost (NPC), Cost of Energy (COE), Operation Cost, initial cost, power production, fuel consumption, and the annual net consumed energy from the grid. Forty-five different scenarios were analyzed for all possible cases. The existence of backup generators on the campus was also taken into consideration; G1-350kVA and G2-500kVA. The study has two stages. In the first stage, they used a walkthrough energy audit in the (EETC) to estimate the load profile of the campus, while in the second stage, they used HOMER Pro to analyze this data. The results show that adding an on-grid PV system to the campus grid can reduce the COE by 58%, and it is the best scenario when the grid is present, with an NPC, operation cost ($/yr), and initial capital ($) equal to $77,680, $1,460, and $59,018 respectively. When the grid was absent, the winning scenario was using a PV solar system with a 100-kWh lithium battery storage and a converter. Despite that scenario being the best solution, the produced energy cost is 372% higher than the grid energy cost (0.1 $/kWh) in Iraq, with an NPC, operation cost ($/yr.), and initial capital ($) equal to $337,291, $7,855, and 236878 respectively. Finally, both winning scenarios have no generator, and this will have a high impact on the campus environment.\",\"PeriodicalId\":39617,\"journal\":{\"name\":\"Journal of Biomolecular Techniques\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-06-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Biomolecular Techniques\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.51173/jt.v5i2.722\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"Biochemistry, Genetics and Molecular Biology\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Biomolecular Techniques","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.51173/jt.v5i2.722","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Biochemistry, Genetics and Molecular Biology","Score":null,"Total":0}
A HOMER-Aided Study for PV System Design and Cost Analysis for a College Campus in Baghdad
Due to the lack of electric power generation in Iraq and as a step forward to adopting a sustainable campus of the Electrical Engineering Technical College (EETC), Middle Technical University, in Baghdad, Iraq, and the critical demand for energy in our institutions, particularly educational institutions, this pilot study was proposed. The study aims to analyze the adoption of PV solar systems on the campus in the presence and absence of grid power and how that affects our design discussion in the matter of Net Present Cost (NPC), Cost of Energy (COE), Operation Cost, initial cost, power production, fuel consumption, and the annual net consumed energy from the grid. Forty-five different scenarios were analyzed for all possible cases. The existence of backup generators on the campus was also taken into consideration; G1-350kVA and G2-500kVA. The study has two stages. In the first stage, they used a walkthrough energy audit in the (EETC) to estimate the load profile of the campus, while in the second stage, they used HOMER Pro to analyze this data. The results show that adding an on-grid PV system to the campus grid can reduce the COE by 58%, and it is the best scenario when the grid is present, with an NPC, operation cost ($/yr), and initial capital ($) equal to $77,680, $1,460, and $59,018 respectively. When the grid was absent, the winning scenario was using a PV solar system with a 100-kWh lithium battery storage and a converter. Despite that scenario being the best solution, the produced energy cost is 372% higher than the grid energy cost (0.1 $/kWh) in Iraq, with an NPC, operation cost ($/yr.), and initial capital ($) equal to $337,291, $7,855, and 236878 respectively. Finally, both winning scenarios have no generator, and this will have a high impact on the campus environment.
期刊介绍:
The Journal of Biomolecular Techniques is a peer-reviewed publication issued five times a year by the Association of Biomolecular Resource Facilities. The Journal was established to promote the central role biotechnology plays in contemporary research activities, to disseminate information among biomolecular resource facilities, and to communicate the biotechnology research conducted by the Association’s Research Groups and members, as well as other investigators.