{"title":"一个53年资产的案例研究——成熟资产完整性和风险管理的重要性","authors":"A. Jadoon","doi":"10.2118/193271-MS","DOIUrl":null,"url":null,"abstract":"\n BP is a joint venture partner in GUPCO, which operates in the Gulf of Suez, Egypt. The asset is over 50 years old and has a large operational foot print. This includes 3 onshore process facilities handling over 450,000 barrels of fluid per day from over 100 offshore structures and 200 pipelines. The field is supported by gas lift and water injection from two onshore facilities.\n The asset presents a challenge from an integrity perspective, namely corrosion and production chemistry threats. These are managed through an inspection program and anomaly management process.\n This case study presents how our asset integrity is managed and forward plan for improvement. The important relationship with the risk management process is highlighted.","PeriodicalId":11079,"journal":{"name":"Day 4 Thu, November 15, 2018","volume":"31 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2018-11-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A Case Study from a 53 Year Old Asset - The Importance of Integrity and Risk Management for a Mature Asset\",\"authors\":\"A. Jadoon\",\"doi\":\"10.2118/193271-MS\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n BP is a joint venture partner in GUPCO, which operates in the Gulf of Suez, Egypt. The asset is over 50 years old and has a large operational foot print. This includes 3 onshore process facilities handling over 450,000 barrels of fluid per day from over 100 offshore structures and 200 pipelines. The field is supported by gas lift and water injection from two onshore facilities.\\n The asset presents a challenge from an integrity perspective, namely corrosion and production chemistry threats. These are managed through an inspection program and anomaly management process.\\n This case study presents how our asset integrity is managed and forward plan for improvement. The important relationship with the risk management process is highlighted.\",\"PeriodicalId\":11079,\"journal\":{\"name\":\"Day 4 Thu, November 15, 2018\",\"volume\":\"31 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-11-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 4 Thu, November 15, 2018\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/193271-MS\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 4 Thu, November 15, 2018","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/193271-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
A Case Study from a 53 Year Old Asset - The Importance of Integrity and Risk Management for a Mature Asset
BP is a joint venture partner in GUPCO, which operates in the Gulf of Suez, Egypt. The asset is over 50 years old and has a large operational foot print. This includes 3 onshore process facilities handling over 450,000 barrels of fluid per day from over 100 offshore structures and 200 pipelines. The field is supported by gas lift and water injection from two onshore facilities.
The asset presents a challenge from an integrity perspective, namely corrosion and production chemistry threats. These are managed through an inspection program and anomaly management process.
This case study presents how our asset integrity is managed and forward plan for improvement. The important relationship with the risk management process is highlighted.