J.N. Doggett, B.G. Logan, J.E. Osher, K.I. Thomassen, W.D. Nelson
{"title":"聚变技术示范设施(TDF)","authors":"J.N. Doggett, B.G. Logan, J.E. Osher, K.I. Thomassen, W.D. Nelson","doi":"10.1016/0167-899X(85)90014-X","DOIUrl":null,"url":null,"abstract":"<div><p>This paper describes a facility for generating engineering data on the nuclear technologies needed to build an engineering test reactor (ETR). The facility, based on a tandem mirror operating in the Kelley mode, could be used to produce a high neutron flux (1.4 MW/m<sup>2</sup>) on an 8 m<sup>2</sup> test area for testing fusion blankets. Runs of more than 100 hours, with an average availability of 30%, would produce a fluence of 5 MW·yr/m<sup>2</sup> and give the necessary experience for successful operation of an ETR.</p></div>","PeriodicalId":82205,"journal":{"name":"Nuclear engineering and design/fusion : an international journal devoted to the thermal, mechanical, materials, structural, and design problems of fusion energy","volume":"2 2","pages":"Pages 223-237"},"PeriodicalIF":0.0000,"publicationDate":"1985-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0167-899X(85)90014-X","citationCount":"6","resultStr":"{\"title\":\"A fusion technology demonstration facility (TDF)\",\"authors\":\"J.N. Doggett, B.G. Logan, J.E. Osher, K.I. Thomassen, W.D. Nelson\",\"doi\":\"10.1016/0167-899X(85)90014-X\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>This paper describes a facility for generating engineering data on the nuclear technologies needed to build an engineering test reactor (ETR). The facility, based on a tandem mirror operating in the Kelley mode, could be used to produce a high neutron flux (1.4 MW/m<sup>2</sup>) on an 8 m<sup>2</sup> test area for testing fusion blankets. Runs of more than 100 hours, with an average availability of 30%, would produce a fluence of 5 MW·yr/m<sup>2</sup> and give the necessary experience for successful operation of an ETR.</p></div>\",\"PeriodicalId\":82205,\"journal\":{\"name\":\"Nuclear engineering and design/fusion : an international journal devoted to the thermal, mechanical, materials, structural, and design problems of fusion energy\",\"volume\":\"2 2\",\"pages\":\"Pages 223-237\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1985-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1016/0167-899X(85)90014-X\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Nuclear engineering and design/fusion : an international journal devoted to the thermal, mechanical, materials, structural, and design problems of fusion energy\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/0167899X8590014X\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Nuclear engineering and design/fusion : an international journal devoted to the thermal, mechanical, materials, structural, and design problems of fusion energy","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/0167899X8590014X","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
This paper describes a facility for generating engineering data on the nuclear technologies needed to build an engineering test reactor (ETR). The facility, based on a tandem mirror operating in the Kelley mode, could be used to produce a high neutron flux (1.4 MW/m2) on an 8 m2 test area for testing fusion blankets. Runs of more than 100 hours, with an average availability of 30%, would produce a fluence of 5 MW·yr/m2 and give the necessary experience for successful operation of an ETR.