通过暴露BCO-LRLC的机会,恢复闲置井,释放砂拉越海上的潜在产量增长

M. Razak, M. N. K. Zaman, Affira Ali, J. Shah, M. Z. Sakdillah, Zarin Zainuri
{"title":"通过暴露BCO-LRLC的机会,恢复闲置井,释放砂拉越海上的潜在产量增长","authors":"M. Razak, M. N. K. Zaman, Affira Ali, J. Shah, M. Z. Sakdillah, Zarin Zainuri","doi":"10.2523/IPTC-19218-MS","DOIUrl":null,"url":null,"abstract":"\n Brownfield in Balingian and Baram Delta have handful of idle wells and well to be abandoned in their inventories. The project aims to reduce the idle well inventories and support production gain through monetizing behind casing opportunities. The target is to appraise and develop LRLC potentials with lower cost of appraisals. This will maximize full field potentials before abandonment and leads to future development of LRLC opportunities as conventional reservoir becomes more difficult to develop.\n The idle well inventory has grew up due to problem in production (increase water cut, HGOR) and well problems (sand, fish). An order has been introduced to reduce the idle well list up to 50%. Additionally, in the past, the LRLC intervals were often ignored and considered as water-wet sands due to high water saturation or as tight sands. These intervals, that contain significant reserves, are recognized in many technical papers explaining its identification and evaluation techniques from well-data (logs and samples/cores). The scope of the project is to rejuvenate the idle wells by add-perf LRLC reservoirs.\n It is impossible to achieve the target without the presence of proper and improved LRLC BCO evaluation process, thus an integrated workflow approach (between Petrophysicist, Reservoir Engineer, Production Technologist, Asset manager & Well Intervention group) has been developed and applied in the project. A new evaluation tools had also been developed called REM (Resolution Enhanced Modelling) in order to improve the log properties of LRLC reservoirs so that the data obtained from old conventional tools can still be used to evaluate LRLC reservoir. Although LRLC is termed UNSEEN, the risk is reduced by proper understanding of hydrocarbon column and sand development.\n To date, 7 fields are already benefitted from this approach. Field A LRLC reservoir for example has tripled the hydrocarbon saturation, and net to gross has improved to 20% using REM compare to 5% without REM. The other 6 fields are also gaining the same increase in the properties. This has resulted in a cumulative potential of 4.4 MMstb of reserves addition and ~11 KBopd potential gain. As a result, a better and attractive BCO proposals can be generated from LRLC opportunities. The exercise will provide the company with cheaper options of appraising and developing LRLC reservoir while reducing the idle wells. There is no better way of understanding LRLC reservoir; as no tools can identify & quantify it yet, rather from the actual production.","PeriodicalId":11267,"journal":{"name":"Day 3 Thu, March 28, 2019","volume":"231 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-03-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Reviving Idle Wells and Unlocking Potential Production Gain in Offshore Sarawak Through Exposing BCO-LRLC Opportunities\",\"authors\":\"M. Razak, M. N. K. Zaman, Affira Ali, J. Shah, M. Z. Sakdillah, Zarin Zainuri\",\"doi\":\"10.2523/IPTC-19218-MS\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Brownfield in Balingian and Baram Delta have handful of idle wells and well to be abandoned in their inventories. The project aims to reduce the idle well inventories and support production gain through monetizing behind casing opportunities. The target is to appraise and develop LRLC potentials with lower cost of appraisals. This will maximize full field potentials before abandonment and leads to future development of LRLC opportunities as conventional reservoir becomes more difficult to develop.\\n The idle well inventory has grew up due to problem in production (increase water cut, HGOR) and well problems (sand, fish). An order has been introduced to reduce the idle well list up to 50%. Additionally, in the past, the LRLC intervals were often ignored and considered as water-wet sands due to high water saturation or as tight sands. These intervals, that contain significant reserves, are recognized in many technical papers explaining its identification and evaluation techniques from well-data (logs and samples/cores). The scope of the project is to rejuvenate the idle wells by add-perf LRLC reservoirs.\\n It is impossible to achieve the target without the presence of proper and improved LRLC BCO evaluation process, thus an integrated workflow approach (between Petrophysicist, Reservoir Engineer, Production Technologist, Asset manager & Well Intervention group) has been developed and applied in the project. A new evaluation tools had also been developed called REM (Resolution Enhanced Modelling) in order to improve the log properties of LRLC reservoirs so that the data obtained from old conventional tools can still be used to evaluate LRLC reservoir. Although LRLC is termed UNSEEN, the risk is reduced by proper understanding of hydrocarbon column and sand development.\\n To date, 7 fields are already benefitted from this approach. Field A LRLC reservoir for example has tripled the hydrocarbon saturation, and net to gross has improved to 20% using REM compare to 5% without REM. The other 6 fields are also gaining the same increase in the properties. This has resulted in a cumulative potential of 4.4 MMstb of reserves addition and ~11 KBopd potential gain. As a result, a better and attractive BCO proposals can be generated from LRLC opportunities. The exercise will provide the company with cheaper options of appraising and developing LRLC reservoir while reducing the idle wells. There is no better way of understanding LRLC reservoir; as no tools can identify & quantify it yet, rather from the actual production.\",\"PeriodicalId\":11267,\"journal\":{\"name\":\"Day 3 Thu, March 28, 2019\",\"volume\":\"231 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-03-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 3 Thu, March 28, 2019\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2523/IPTC-19218-MS\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Thu, March 28, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2523/IPTC-19218-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在巴林和巴拉姆三角洲的布朗菲尔德地区,他们的库存中有少量闲置井和要放弃的井。该项目旨在减少闲置井的库存,并通过套管后的货币化来支持产量增长。目标是以较低的评估成本评估和开发LRLC潜力。这将在废弃前最大限度地提高油田的潜力,并在常规油藏开发难度加大的情况下,为LRLC的未来开发创造机会。由于生产问题(含水率增加、HGOR)和油井问题(出砂、出鱼),闲置油井库存不断增加。已经引入了一项订单,将闲置井数量减少到50%。此外,在过去,由于含水饱和度高,LRLC层段经常被忽略,被认为是水湿砂岩或致密砂岩。这些储层包含大量储量,在许多技术论文中都得到了认可,这些论文解释了通过井数据(测井和样品/岩心)识别和评价技术。该项目的范围是通过增加射孔LRLC油藏来恢复闲置井的活力。如果没有适当和改进的LRLC BCO评估流程,就不可能实现目标,因此,开发了一种集成的工作流程方法(包括岩石物理学家、油藏工程师、生产技术人员、资产管理人员和修井小组),并将其应用于该项目。为了改善LRLC储层的测井性质,开发了一种新的评价工具,称为REM(分辨率增强建模),使旧的常规工具获得的数据仍然可以用于评价LRLC储层。尽管LRLC被称为UNSEEN,但通过对油气柱和砂体发育的正确理解,可以降低风险。迄今为止,已有7个油田从这种方法中受益。例如,A油田的LRLC油藏的油气饱和度提高了两倍,使用REM后的净总比提高到20%,而不使用REM时的净总比为5%。其他6个油田的性能也有同样的提高。这使得该地区的累计潜在储量增加了440万桶/天,潜在收益约为11万桶/天。因此,可以从LRLC机会中产生更好和有吸引力的BCO提案。该作业将为公司提供更经济的选择,以评估和开发LRLC油藏,同时减少闲置井。没有更好的方法来了解LRLC储层;因为没有工具可以识别和量化它,而是从实际生产。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Reviving Idle Wells and Unlocking Potential Production Gain in Offshore Sarawak Through Exposing BCO-LRLC Opportunities
Brownfield in Balingian and Baram Delta have handful of idle wells and well to be abandoned in their inventories. The project aims to reduce the idle well inventories and support production gain through monetizing behind casing opportunities. The target is to appraise and develop LRLC potentials with lower cost of appraisals. This will maximize full field potentials before abandonment and leads to future development of LRLC opportunities as conventional reservoir becomes more difficult to develop. The idle well inventory has grew up due to problem in production (increase water cut, HGOR) and well problems (sand, fish). An order has been introduced to reduce the idle well list up to 50%. Additionally, in the past, the LRLC intervals were often ignored and considered as water-wet sands due to high water saturation or as tight sands. These intervals, that contain significant reserves, are recognized in many technical papers explaining its identification and evaluation techniques from well-data (logs and samples/cores). The scope of the project is to rejuvenate the idle wells by add-perf LRLC reservoirs. It is impossible to achieve the target without the presence of proper and improved LRLC BCO evaluation process, thus an integrated workflow approach (between Petrophysicist, Reservoir Engineer, Production Technologist, Asset manager & Well Intervention group) has been developed and applied in the project. A new evaluation tools had also been developed called REM (Resolution Enhanced Modelling) in order to improve the log properties of LRLC reservoirs so that the data obtained from old conventional tools can still be used to evaluate LRLC reservoir. Although LRLC is termed UNSEEN, the risk is reduced by proper understanding of hydrocarbon column and sand development. To date, 7 fields are already benefitted from this approach. Field A LRLC reservoir for example has tripled the hydrocarbon saturation, and net to gross has improved to 20% using REM compare to 5% without REM. The other 6 fields are also gaining the same increase in the properties. This has resulted in a cumulative potential of 4.4 MMstb of reserves addition and ~11 KBopd potential gain. As a result, a better and attractive BCO proposals can be generated from LRLC opportunities. The exercise will provide the company with cheaper options of appraising and developing LRLC reservoir while reducing the idle wells. There is no better way of understanding LRLC reservoir; as no tools can identify & quantify it yet, rather from the actual production.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信