{"title":"运用八项原则和精益生产提高某运动鞋工厂缝纫工艺的提升性能","authors":"Lucky Setiawan, S. Hasibuan","doi":"10.12776/qip.v25i2.1516","DOIUrl":null,"url":null,"abstract":"Purpose: The research aims to design a performance improvement framework for a new model of sports shoes to increase the ramp-up process time.\nMethodology/Approach: The approach used the problem-solving system of 8 disciplines, Single Minute Exchange Dies, Visual Management, and the Just In Time principle.\nFindings: By using the methods described above, the research findings will have a positive impact on the company. Model changeover time was reduced from 600 minutes to 102 minutes, and ramp-up time was reduced from 20 days to 2 days.\nResearch Limitation/Implication: The limitation of this study was that only the CK2946 model was still done as a case study. The cost and other inhibiting factors were also not included in the discussion of this rump-up process.\nOriginality/Value of paper: By integrating SMED, Just In Time, visual management, and using 8-Dicipline, the researcher developed a framework for improved performance for ramping up a new model of sports shoes.","PeriodicalId":44057,"journal":{"name":"Quality Innovation Prosperity-Kvalita Inovacia Prosperita","volume":"130 1","pages":""},"PeriodicalIF":1.8000,"publicationDate":"2021-07-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Improve Ramp-Up Performance on the Sewing Process in a Sports Shoe Factory Using 8-Disciplines and Lean Manufacturing\",\"authors\":\"Lucky Setiawan, S. Hasibuan\",\"doi\":\"10.12776/qip.v25i2.1516\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Purpose: The research aims to design a performance improvement framework for a new model of sports shoes to increase the ramp-up process time.\\nMethodology/Approach: The approach used the problem-solving system of 8 disciplines, Single Minute Exchange Dies, Visual Management, and the Just In Time principle.\\nFindings: By using the methods described above, the research findings will have a positive impact on the company. Model changeover time was reduced from 600 minutes to 102 minutes, and ramp-up time was reduced from 20 days to 2 days.\\nResearch Limitation/Implication: The limitation of this study was that only the CK2946 model was still done as a case study. The cost and other inhibiting factors were also not included in the discussion of this rump-up process.\\nOriginality/Value of paper: By integrating SMED, Just In Time, visual management, and using 8-Dicipline, the researcher developed a framework for improved performance for ramping up a new model of sports shoes.\",\"PeriodicalId\":44057,\"journal\":{\"name\":\"Quality Innovation Prosperity-Kvalita Inovacia Prosperita\",\"volume\":\"130 1\",\"pages\":\"\"},\"PeriodicalIF\":1.8000,\"publicationDate\":\"2021-07-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Quality Innovation Prosperity-Kvalita Inovacia Prosperita\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.12776/qip.v25i2.1516\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"MANAGEMENT\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Quality Innovation Prosperity-Kvalita Inovacia Prosperita","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.12776/qip.v25i2.1516","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 2
摘要
目的:本研究旨在设计一种新型运动鞋的性能改善框架,以增加爬坡过程时间。方法论/方法:该方法使用了8个学科的问题解决系统、一分钟交换模、可视化管理和准时原则。研究结果:通过使用上述方法,研究结果将对公司产生积极影响。模型转换时间从600分钟减少到102分钟,爬坡时间从20天减少到2天。研究局限性/启示:本研究的局限性在于仅以CK2946模型作为个案研究。成本和其他抑制因素也没有包括在对这一增加过程的讨论中。论文的独创性/价值:通过整合SMED, Just In Time,视觉管理,并使用8-纪律,研究人员开发了一个提高性能的框架,以提高一种新型运动鞋的性能。
Improve Ramp-Up Performance on the Sewing Process in a Sports Shoe Factory Using 8-Disciplines and Lean Manufacturing
Purpose: The research aims to design a performance improvement framework for a new model of sports shoes to increase the ramp-up process time.
Methodology/Approach: The approach used the problem-solving system of 8 disciplines, Single Minute Exchange Dies, Visual Management, and the Just In Time principle.
Findings: By using the methods described above, the research findings will have a positive impact on the company. Model changeover time was reduced from 600 minutes to 102 minutes, and ramp-up time was reduced from 20 days to 2 days.
Research Limitation/Implication: The limitation of this study was that only the CK2946 model was still done as a case study. The cost and other inhibiting factors were also not included in the discussion of this rump-up process.
Originality/Value of paper: By integrating SMED, Just In Time, visual management, and using 8-Dicipline, the researcher developed a framework for improved performance for ramping up a new model of sports shoes.