内蒙古配电网工程投资估算精度对策研究

G. Zhao, Baohuai Yang, H. Zhang, H. Lu
{"title":"内蒙古配电网工程投资估算精度对策研究","authors":"G. Zhao, Baohuai Yang, H. Zhang, H. Lu","doi":"10.4028/www.scientific.net/AMM.448-453.2673","DOIUrl":null,"url":null,"abstract":"Given the characteristics of power distribution grid project including the huge amount of investment, long construction period, long investment payback period and so on, the precision of investment estimate has a tremendous influence on decision making, economic effect and cost control in each stage. By way of introducing the current situation of investment estimate of power distribution grid project, and analyzing the key factors affecting the investment estimate precision including investment decision-making and management, project design plans, risk and the investment estimate preparation, this paper puts forward improvement strategies aiming at influencing factors in order to promote the rapid development of power distribution grid project in Inner Mongolia.","PeriodicalId":8039,"journal":{"name":"Applied Mechanics and Materials","volume":"12 1","pages":"2673 - 2680"},"PeriodicalIF":0.0000,"publicationDate":"2013-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Research on Countermeasures for Investment Estimate Precision of Power Distribution Grid Project in Inner Mongolia\",\"authors\":\"G. Zhao, Baohuai Yang, H. Zhang, H. Lu\",\"doi\":\"10.4028/www.scientific.net/AMM.448-453.2673\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Given the characteristics of power distribution grid project including the huge amount of investment, long construction period, long investment payback period and so on, the precision of investment estimate has a tremendous influence on decision making, economic effect and cost control in each stage. By way of introducing the current situation of investment estimate of power distribution grid project, and analyzing the key factors affecting the investment estimate precision including investment decision-making and management, project design plans, risk and the investment estimate preparation, this paper puts forward improvement strategies aiming at influencing factors in order to promote the rapid development of power distribution grid project in Inner Mongolia.\",\"PeriodicalId\":8039,\"journal\":{\"name\":\"Applied Mechanics and Materials\",\"volume\":\"12 1\",\"pages\":\"2673 - 2680\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Applied Mechanics and Materials\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4028/www.scientific.net/AMM.448-453.2673\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Applied Mechanics and Materials","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4028/www.scientific.net/AMM.448-453.2673","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

配电网工程具有投资数额巨大、建设周期长、投资回收期长的特点,投资估算的准确性对各阶段的决策、经济效果和成本控制有着巨大的影响。本文通过介绍配电网项目投资估算的现状,分析影响投资估算精度的关键因素,包括投资决策与管理、项目设计方案、风险和投资估算编制,针对影响因素提出改进策略,以促进内蒙古配电网项目的快速发展。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Research on Countermeasures for Investment Estimate Precision of Power Distribution Grid Project in Inner Mongolia
Given the characteristics of power distribution grid project including the huge amount of investment, long construction period, long investment payback period and so on, the precision of investment estimate has a tremendous influence on decision making, economic effect and cost control in each stage. By way of introducing the current situation of investment estimate of power distribution grid project, and analyzing the key factors affecting the investment estimate precision including investment decision-making and management, project design plans, risk and the investment estimate preparation, this paper puts forward improvement strategies aiming at influencing factors in order to promote the rapid development of power distribution grid project in Inner Mongolia.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信