某包装机械制造公司工作改进研究

X. F. Sun, G. Cheng, W. Li
{"title":"某包装机械制造公司工作改进研究","authors":"X. F. Sun, G. Cheng, W. Li","doi":"10.1109/ICIEEM.2009.5344458","DOIUrl":null,"url":null,"abstract":"This paper studies the improvement of production efficiency and balance rate of the manual assembly line in a packaging machine manufacturing company. MODular Arrangement of Predetermined Time Standards (MODAPTS) method is used to obtain time values for elements and for entire operations of the manual assembly line. Also the ECRS four principles (Eliminate, Combine, Rearrange and Simple) are used to minimize the idle time at every station or the percentage of line balance loss. In order to verify the results that were obtained from the generated line-balancing pre- and post-, Witness simulation software is used to estimate the output. Simulation results showed that productivity increases about 41.72% higher than the current situation.","PeriodicalId":6326,"journal":{"name":"2009 16th International Conference on Industrial Engineering and Engineering Management","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2009-12-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"9","resultStr":"{\"title\":\"Study on work improvement in a packaging machine manufacturing company\",\"authors\":\"X. F. Sun, G. Cheng, W. Li\",\"doi\":\"10.1109/ICIEEM.2009.5344458\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper studies the improvement of production efficiency and balance rate of the manual assembly line in a packaging machine manufacturing company. MODular Arrangement of Predetermined Time Standards (MODAPTS) method is used to obtain time values for elements and for entire operations of the manual assembly line. Also the ECRS four principles (Eliminate, Combine, Rearrange and Simple) are used to minimize the idle time at every station or the percentage of line balance loss. In order to verify the results that were obtained from the generated line-balancing pre- and post-, Witness simulation software is used to estimate the output. Simulation results showed that productivity increases about 41.72% higher than the current situation.\",\"PeriodicalId\":6326,\"journal\":{\"name\":\"2009 16th International Conference on Industrial Engineering and Engineering Management\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-12-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"9\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2009 16th International Conference on Industrial Engineering and Engineering Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICIEEM.2009.5344458\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 16th International Conference on Industrial Engineering and Engineering Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICIEEM.2009.5344458","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 9

摘要

本文对某包装机械制造企业手工装配线生产效率和平衡率的提高进行了研究。预定时间标准的模块化安排(MODAPTS)方法用于获得人工装配线各部件和整个操作的时间值。此外,ECRS的四个原则(消除,合并,重新安排和简单)被用来最小化每站的空闲时间或线路平衡损失的百分比。为了验证从生成的线平衡前后获得的结果,使用Witness仿真软件来估计输出。仿真结果表明,改进后的生产率比现有的生产率提高了41.72%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Study on work improvement in a packaging machine manufacturing company
This paper studies the improvement of production efficiency and balance rate of the manual assembly line in a packaging machine manufacturing company. MODular Arrangement of Predetermined Time Standards (MODAPTS) method is used to obtain time values for elements and for entire operations of the manual assembly line. Also the ECRS four principles (Eliminate, Combine, Rearrange and Simple) are used to minimize the idle time at every station or the percentage of line balance loss. In order to verify the results that were obtained from the generated line-balancing pre- and post-, Witness simulation software is used to estimate the output. Simulation results showed that productivity increases about 41.72% higher than the current situation.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信