2013年TL METODE链路校准行程的不确定度评定

Shinn-Yan Lin, Yi-Jiun Huang, Wen-Hung Tseng
{"title":"2013年TL METODE链路校准行程的不确定度评定","authors":"Shinn-Yan Lin, Yi-Jiun Huang, Wen-Hung Tseng","doi":"10.1109/FCS.2015.7138829","DOIUrl":null,"url":null,"abstract":"We targeting analyzed the UTC link delay of GPS station PTBB of PTB to TWTF of TL and expressed it as 3 groups: the uncompensated GPS common clock difference measurements, cable delay measurement, and the total delay variations of fixed GPS stations and travelling calibrator used in this METODE calibration tour. The total delay variation of fixed GPS stations PTBB and TWTF was evaluated by monitoring their long-term CCD of the same type receiver more than 350 days. For the BIPM travelling calibrator BP1C and BP0U, we used a moving cesium clock method to evaluate their instability of total delay in different antenna position. Our study was helpful for clarifying the uncertainty composition of the current PTB-TL link and could reduce it.","PeriodicalId":57667,"journal":{"name":"时间频率公报","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2015-04-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Uncertainty evaluation of 2013 TL METODE link calibration tour\",\"authors\":\"Shinn-Yan Lin, Yi-Jiun Huang, Wen-Hung Tseng\",\"doi\":\"10.1109/FCS.2015.7138829\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"We targeting analyzed the UTC link delay of GPS station PTBB of PTB to TWTF of TL and expressed it as 3 groups: the uncompensated GPS common clock difference measurements, cable delay measurement, and the total delay variations of fixed GPS stations and travelling calibrator used in this METODE calibration tour. The total delay variation of fixed GPS stations PTBB and TWTF was evaluated by monitoring their long-term CCD of the same type receiver more than 350 days. For the BIPM travelling calibrator BP1C and BP0U, we used a moving cesium clock method to evaluate their instability of total delay in different antenna position. Our study was helpful for clarifying the uncertainty composition of the current PTB-TL link and could reduce it.\",\"PeriodicalId\":57667,\"journal\":{\"name\":\"时间频率公报\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-04-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"时间频率公报\",\"FirstCategoryId\":\"1089\",\"ListUrlMain\":\"https://doi.org/10.1109/FCS.2015.7138829\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"时间频率公报","FirstCategoryId":"1089","ListUrlMain":"https://doi.org/10.1109/FCS.2015.7138829","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

我们有目标地分析了PTB的GPS站PTBB到TL的TWTF的UTC链路延迟,并将其表示为3组:未补偿的GPS公共时钟差测量,电缆延迟测量,以及本次METODE校准中使用的固定GPS站和旅行校准器的总延迟变化。通过350 d以上的同类型接收机CCD监测,评价了固定GPS站PTBB和TWTF的总延迟变化。对于BIPM旅行校准器BP1C和BP0U,我们采用移动铯时钟法评估了它们在不同天线位置的总延迟不稳定性。我们的研究有助于澄清当前PTB-TL链路的不确定性组成,并可以减少它。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Uncertainty evaluation of 2013 TL METODE link calibration tour
We targeting analyzed the UTC link delay of GPS station PTBB of PTB to TWTF of TL and expressed it as 3 groups: the uncompensated GPS common clock difference measurements, cable delay measurement, and the total delay variations of fixed GPS stations and travelling calibrator used in this METODE calibration tour. The total delay variation of fixed GPS stations PTBB and TWTF was evaluated by monitoring their long-term CCD of the same type receiver more than 350 days. For the BIPM travelling calibrator BP1C and BP0U, we used a moving cesium clock method to evaluate their instability of total delay in different antenna position. Our study was helpful for clarifying the uncertainty composition of the current PTB-TL link and could reduce it.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
1135
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信