{"title":"利用MEESA求解作业车间调度中的能耗因素","authors":"Anandapadmanabhan Kumaresan","doi":"10.12723/mjs.60.5","DOIUrl":null,"url":null,"abstract":"In Job shop Scheduling Energy conservation is a key factor to be considers for minimizing the lateness and makespan of the shop here in this paper a new technic Modified Energy Efficiency Scheduling Algorithm (MEESA) is used in the proposed work it is divided into two parts analysing effective rate and modified scheduled aware mechanism, the MEESA algorithm enhances the efficiency rate, makespan, in job shop scheduling.","PeriodicalId":18050,"journal":{"name":"Mapana Journal of Sciences","volume":"53 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Addressing the Energy Consumption Factors in Job Shop Scheduling using MEESA\",\"authors\":\"Anandapadmanabhan Kumaresan\",\"doi\":\"10.12723/mjs.60.5\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In Job shop Scheduling Energy conservation is a key factor to be considers for minimizing the lateness and makespan of the shop here in this paper a new technic Modified Energy Efficiency Scheduling Algorithm (MEESA) is used in the proposed work it is divided into two parts analysing effective rate and modified scheduled aware mechanism, the MEESA algorithm enhances the efficiency rate, makespan, in job shop scheduling.\",\"PeriodicalId\":18050,\"journal\":{\"name\":\"Mapana Journal of Sciences\",\"volume\":\"53 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Mapana Journal of Sciences\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.12723/mjs.60.5\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Mapana Journal of Sciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.12723/mjs.60.5","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Addressing the Energy Consumption Factors in Job Shop Scheduling using MEESA
In Job shop Scheduling Energy conservation is a key factor to be considers for minimizing the lateness and makespan of the shop here in this paper a new technic Modified Energy Efficiency Scheduling Algorithm (MEESA) is used in the proposed work it is divided into two parts analysing effective rate and modified scheduled aware mechanism, the MEESA algorithm enhances the efficiency rate, makespan, in job shop scheduling.