计划模块项目时间表二斯托利使用PT XYZ Critical Path Method方法

Robby Rahmansah, Verani Hartati
{"title":"计划模块项目时间表二斯托利使用PT XYZ Critical Path Method方法","authors":"Robby Rahmansah, Verani Hartati","doi":"10.24014/jti.v8i2.17998","DOIUrl":null,"url":null,"abstract":"PT XYZ is a company engaged in the design of houses with simple, practical, and efficient design. The company makes various types and sizes of modular house buildings that can be combined and combined into a house with the type or size you want. One of its products is a modular house two storey. In the implementation of the construction of the modular house two storey model house, there was a delay in project work for 14 days from the construction target of 75 days. This study aims to determine the critical path, duration of completion and schedule plan for the modular house two storey project. Project schedule planning is carried out using the critical path method (CPM) approach, which includes determining settlements such as dependency activity relationships, CPM networks, forward and backward calculations, critical path calculations","PeriodicalId":32235,"journal":{"name":"Spektrum Industri Jurnal Ilmiah Pengetahuan dan Penerapan Teknik Industri","volume":"8 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-12-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Perencanaan Jadwal Waktu Proyek Modular House Two Storey Menggunakan Pendekatan Critical Path Method di PT XYZ\",\"authors\":\"Robby Rahmansah, Verani Hartati\",\"doi\":\"10.24014/jti.v8i2.17998\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"PT XYZ is a company engaged in the design of houses with simple, practical, and efficient design. The company makes various types and sizes of modular house buildings that can be combined and combined into a house with the type or size you want. One of its products is a modular house two storey. In the implementation of the construction of the modular house two storey model house, there was a delay in project work for 14 days from the construction target of 75 days. This study aims to determine the critical path, duration of completion and schedule plan for the modular house two storey project. Project schedule planning is carried out using the critical path method (CPM) approach, which includes determining settlements such as dependency activity relationships, CPM networks, forward and backward calculations, critical path calculations\",\"PeriodicalId\":32235,\"journal\":{\"name\":\"Spektrum Industri Jurnal Ilmiah Pengetahuan dan Penerapan Teknik Industri\",\"volume\":\"8 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-12-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Spektrum Industri Jurnal Ilmiah Pengetahuan dan Penerapan Teknik Industri\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24014/jti.v8i2.17998\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Spektrum Industri Jurnal Ilmiah Pengetahuan dan Penerapan Teknik Industri","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24014/jti.v8i2.17998","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

本文章由计算机程序翻译,如有差异,请以英文原文为准。
Perencanaan Jadwal Waktu Proyek Modular House Two Storey Menggunakan Pendekatan Critical Path Method di PT XYZ
PT XYZ is a company engaged in the design of houses with simple, practical, and efficient design. The company makes various types and sizes of modular house buildings that can be combined and combined into a house with the type or size you want. One of its products is a modular house two storey. In the implementation of the construction of the modular house two storey model house, there was a delay in project work for 14 days from the construction target of 75 days. This study aims to determine the critical path, duration of completion and schedule plan for the modular house two storey project. Project schedule planning is carried out using the critical path method (CPM) approach, which includes determining settlements such as dependency activity relationships, CPM networks, forward and backward calculations, critical path calculations
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
审稿时长
12 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信