{"title":"通过使用无干预浮选铤,单趟下入多级完井衬管","authors":"W. Tait, M. Munawar","doi":"10.2118/205957-ms","DOIUrl":null,"url":null,"abstract":"\n Due to challenging market conditions, the drilling and completion industry has needed to put forth innovative deployment strategies in horizontal multi-stage completions. In difficult wellbores, the traditional method for deploying liners was to run drill pipe. The case studies discussed in this paper detail an alternative method to deploy liners in a single trip on the tieback string so the operator can reduce the overall costs of deployment. Previously, this was not practical because the tieback string weight could not overcome the wellbore friction in horizontal applications.\n In each case, a flotation collar is required to ensure there is enough hook load for deployment of the liner system. The flotation collars used are an interventionless design, utilizing a tempered glass barrier that shatters at a pre-determined applied pressure. The glass debris can be easily circulated through the well without damaging downhole components. This is done commonly on cemented liner and cemented monobore installations, but more rarely with open hole multi-stage completions. For open hole multi-stage completions, the initial installation typically requires an activation tool at the bottom of the well to set the hydraulically activated equipment above.\n Multiple validation tests were completed prior to installation by using an activation tool and flotation collar to ensure the debris could be safely circulated through the internals without closing the activation tool. These activation tools have relatively limited flow area and could cause an issue if the glass debris were to accumulate and shift it closed prematurely. Premature closing of the tool would leave expensive drilling fluids in contact with the reservoir, potentially harming production. For the test, the flotation collar was placed only two pup joints away from the activation tool, resulting in a worst-case scenario where a large amount of debris could potentially encounter the internals of the activation tool at one time. In a downhole environment the flotation collar is typically installed near the build or heel of the well, depending on wellbore geometry. The testing was successfully completed, and the activation tool showed no signs of loading. This resulted in a full-scale trial in the field where a 52 stage, open hole (OH) multi-stage fracturing (MSF) liner was deployed using this technology.\n Through close collaboration with the operator, an acceptable procedure was established to safely circulate the glass debris and further limit the risk of prematurely closing the activation tool. This paper discusses the OH and cemented MSF deployment challenges, detailed lab testing, and field qualification trials for the single trip deployed system. It also highlights operational procedures and best practices when deploying the system in this fashion. A method to calibrate a torque and drag model will also be explored as part of this discussion.","PeriodicalId":10896,"journal":{"name":"Day 1 Tue, September 21, 2021","volume":"13 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-09-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Single Trip Deployment of Multi-Stage Completion Liners Through the Used of Interventionless Flotation Collars\",\"authors\":\"W. Tait, M. Munawar\",\"doi\":\"10.2118/205957-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Due to challenging market conditions, the drilling and completion industry has needed to put forth innovative deployment strategies in horizontal multi-stage completions. In difficult wellbores, the traditional method for deploying liners was to run drill pipe. The case studies discussed in this paper detail an alternative method to deploy liners in a single trip on the tieback string so the operator can reduce the overall costs of deployment. Previously, this was not practical because the tieback string weight could not overcome the wellbore friction in horizontal applications.\\n In each case, a flotation collar is required to ensure there is enough hook load for deployment of the liner system. The flotation collars used are an interventionless design, utilizing a tempered glass barrier that shatters at a pre-determined applied pressure. The glass debris can be easily circulated through the well without damaging downhole components. This is done commonly on cemented liner and cemented monobore installations, but more rarely with open hole multi-stage completions. For open hole multi-stage completions, the initial installation typically requires an activation tool at the bottom of the well to set the hydraulically activated equipment above.\\n Multiple validation tests were completed prior to installation by using an activation tool and flotation collar to ensure the debris could be safely circulated through the internals without closing the activation tool. These activation tools have relatively limited flow area and could cause an issue if the glass debris were to accumulate and shift it closed prematurely. Premature closing of the tool would leave expensive drilling fluids in contact with the reservoir, potentially harming production. For the test, the flotation collar was placed only two pup joints away from the activation tool, resulting in a worst-case scenario where a large amount of debris could potentially encounter the internals of the activation tool at one time. In a downhole environment the flotation collar is typically installed near the build or heel of the well, depending on wellbore geometry. The testing was successfully completed, and the activation tool showed no signs of loading. This resulted in a full-scale trial in the field where a 52 stage, open hole (OH) multi-stage fracturing (MSF) liner was deployed using this technology.\\n Through close collaboration with the operator, an acceptable procedure was established to safely circulate the glass debris and further limit the risk of prematurely closing the activation tool. This paper discusses the OH and cemented MSF deployment challenges, detailed lab testing, and field qualification trials for the single trip deployed system. It also highlights operational procedures and best practices when deploying the system in this fashion. A method to calibrate a torque and drag model will also be explored as part of this discussion.\",\"PeriodicalId\":10896,\"journal\":{\"name\":\"Day 1 Tue, September 21, 2021\",\"volume\":\"13 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-09-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 1 Tue, September 21, 2021\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/205957-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Tue, September 21, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/205957-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

由于充满挑战的市场环境,钻井和完井行业需要在水平多段完井中提出创新的部署策略。在困难井中,传统的下入尾管方法是下入钻杆。本文讨论的案例研究详细介绍了在回接管柱上单趟下入尾管的替代方法,这样作业者就可以降低总体部署成本。在此之前,这种方法并不实用,因为回接管柱的重量无法克服水平作业时的井筒摩擦。在每种情况下,都需要一个浮选环,以确保有足够的钩载荷来部署尾管系统。所使用的浮选项圈是一种无干预设计,利用钢化玻璃屏障,在预先设定的施加压力下破碎。玻璃碎屑可以很容易地在井中循环,而不会损坏井下组件。这通常在固井尾管和单孔固井安装中进行,但在裸眼多级完井中较为少见。对于裸眼多段完井,初始安装通常需要在井底安装激活工具,以便将液压激活设备置于上方。在安装之前,通过使用激活工具和浮选项圈完成了多次验证测试,以确保碎屑可以在不关闭激活工具的情况下安全地通过内部循环。这些激活工具的流动面积相对有限,如果玻璃碎片积聚并使其过早关闭,可能会导致问题。过早关闭工具会使昂贵的钻井液与储层接触,可能会影响生产。在测试中,浮选箍被放置在距离激活工具只有两个小节的地方,这导致了最坏的情况,即大量的碎屑可能同时遇到激活工具的内部。在井下环境中,根据井筒的几何形状,浮选接箍通常安装在井身或井后跟附近。测试成功完成,激活工具没有显示加载迹象。该技术在现场进行了全面试验,使用了52级裸眼(OH)多级压裂(MSF)尾管。通过与作业者的密切合作,建立了一个可接受的程序,以安全循环玻璃碎片,并进一步限制过早关闭激活工具的风险。本文讨论了OH和固井MSF部署的挑战,详细的实验室测试,以及单趟部署系统的现场鉴定试验。它还强调了以这种方式部署系统时的操作程序和最佳实践。校准扭矩和阻力模型的方法也将作为本讨论的一部分进行探讨。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Single Trip Deployment of Multi-Stage Completion Liners Through the Used of Interventionless Flotation Collars
Due to challenging market conditions, the drilling and completion industry has needed to put forth innovative deployment strategies in horizontal multi-stage completions. In difficult wellbores, the traditional method for deploying liners was to run drill pipe. The case studies discussed in this paper detail an alternative method to deploy liners in a single trip on the tieback string so the operator can reduce the overall costs of deployment. Previously, this was not practical because the tieback string weight could not overcome the wellbore friction in horizontal applications. In each case, a flotation collar is required to ensure there is enough hook load for deployment of the liner system. The flotation collars used are an interventionless design, utilizing a tempered glass barrier that shatters at a pre-determined applied pressure. The glass debris can be easily circulated through the well without damaging downhole components. This is done commonly on cemented liner and cemented monobore installations, but more rarely with open hole multi-stage completions. For open hole multi-stage completions, the initial installation typically requires an activation tool at the bottom of the well to set the hydraulically activated equipment above. Multiple validation tests were completed prior to installation by using an activation tool and flotation collar to ensure the debris could be safely circulated through the internals without closing the activation tool. These activation tools have relatively limited flow area and could cause an issue if the glass debris were to accumulate and shift it closed prematurely. Premature closing of the tool would leave expensive drilling fluids in contact with the reservoir, potentially harming production. For the test, the flotation collar was placed only two pup joints away from the activation tool, resulting in a worst-case scenario where a large amount of debris could potentially encounter the internals of the activation tool at one time. In a downhole environment the flotation collar is typically installed near the build or heel of the well, depending on wellbore geometry. The testing was successfully completed, and the activation tool showed no signs of loading. This resulted in a full-scale trial in the field where a 52 stage, open hole (OH) multi-stage fracturing (MSF) liner was deployed using this technology. Through close collaboration with the operator, an acceptable procedure was established to safely circulate the glass debris and further limit the risk of prematurely closing the activation tool. This paper discusses the OH and cemented MSF deployment challenges, detailed lab testing, and field qualification trials for the single trip deployed system. It also highlights operational procedures and best practices when deploying the system in this fashion. A method to calibrate a torque and drag model will also be explored as part of this discussion.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信