具有能耗限制的制造业鲁棒调度

I. Módos, P. Šůcha, Z. Hanzálek
{"title":"具有能耗限制的制造业鲁棒调度","authors":"I. Módos, P. Šůcha, Z. Hanzálek","doi":"10.1109/ETFA.2016.7733513","DOIUrl":null,"url":null,"abstract":"Our work considers a scheduling problem in which manufacturing companies with large energy demand are obligated to comply with total energy consumption limits in specified time intervals, e.g. 15 minutes. Moreover, the problem is complicated by the fact that in reality the production schedules are not executed exactly as planned due to unexpected disturbances such as machine breakdowns or material unavailability. Therefore, the goal is to find a robust schedule which guarantees that the energy consumption limits are not violated if the start times of operations are arbitrary delayed within a given limit. To circumvent the problem of an exponential number of constraints in the mixed integer linear programming formulation, we propose an exact algorithm based on a decomposition approach. The decomposition approach exploits the fact that the robustness of a given schedule can be checked in a pseudo-polynomial time. We evaluated the proposed algorithm on instances with varying bound of the start times delays.","PeriodicalId":6483,"journal":{"name":"2016 IEEE 21st International Conference on Emerging Technologies and Factory Automation (ETFA)","volume":"55 1","pages":"1-8"},"PeriodicalIF":0.0000,"publicationDate":"2016-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Robust scheduling for manufacturing with energy consumption limits\",\"authors\":\"I. Módos, P. Šůcha, Z. Hanzálek\",\"doi\":\"10.1109/ETFA.2016.7733513\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Our work considers a scheduling problem in which manufacturing companies with large energy demand are obligated to comply with total energy consumption limits in specified time intervals, e.g. 15 minutes. Moreover, the problem is complicated by the fact that in reality the production schedules are not executed exactly as planned due to unexpected disturbances such as machine breakdowns or material unavailability. Therefore, the goal is to find a robust schedule which guarantees that the energy consumption limits are not violated if the start times of operations are arbitrary delayed within a given limit. To circumvent the problem of an exponential number of constraints in the mixed integer linear programming formulation, we propose an exact algorithm based on a decomposition approach. The decomposition approach exploits the fact that the robustness of a given schedule can be checked in a pseudo-polynomial time. We evaluated the proposed algorithm on instances with varying bound of the start times delays.\",\"PeriodicalId\":6483,\"journal\":{\"name\":\"2016 IEEE 21st International Conference on Emerging Technologies and Factory Automation (ETFA)\",\"volume\":\"55 1\",\"pages\":\"1-8\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2016 IEEE 21st International Conference on Emerging Technologies and Factory Automation (ETFA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ETFA.2016.7733513\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 IEEE 21st International Conference on Emerging Technologies and Factory Automation (ETFA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ETFA.2016.7733513","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

我们的工作考虑了一个调度问题,其中能源需求大的制造公司有义务在指定的时间间隔(例如15分钟)内遵守总能耗限制。此外,由于诸如机器故障或材料不可用等意外干扰,实际生产计划并没有完全按照计划执行,这一事实使问题更加复杂。因此,目标是找到一个健壮的调度,保证在给定限制内任意延迟操作的开始时间时不违反能耗限制。为了避免混合整数线性规划公式中约束的指数数目问题,我们提出了一种基于分解方法的精确算法。分解方法利用了一个事实,即给定调度的鲁棒性可以在伪多项式时间内检查。我们在具有不同起始时间延迟界的实例上对所提出的算法进行了评估。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Robust scheduling for manufacturing with energy consumption limits
Our work considers a scheduling problem in which manufacturing companies with large energy demand are obligated to comply with total energy consumption limits in specified time intervals, e.g. 15 minutes. Moreover, the problem is complicated by the fact that in reality the production schedules are not executed exactly as planned due to unexpected disturbances such as machine breakdowns or material unavailability. Therefore, the goal is to find a robust schedule which guarantees that the energy consumption limits are not violated if the start times of operations are arbitrary delayed within a given limit. To circumvent the problem of an exponential number of constraints in the mixed integer linear programming formulation, we propose an exact algorithm based on a decomposition approach. The decomposition approach exploits the fact that the robustness of a given schedule can be checked in a pseudo-polynomial time. We evaluated the proposed algorithm on instances with varying bound of the start times delays.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信