Xuejun Lin, G. Sutherland, D. Cumming, B. Thomas, A. Sani
{"title":"利用水平井技术提高煤层气田产能的实例研究","authors":"Xuejun Lin, G. Sutherland, D. Cumming, B. Thomas, A. Sani","doi":"10.2118/192114-MS","DOIUrl":null,"url":null,"abstract":"\n A Coal Seam Gas Field, operated by Origin Energy as upstream operator of the APLNG project in Queensland, Australia has been on commercial production since 2005. From inception to 2012 the development concept used vertical cavitated wells or vertical fracture stimulated wells. Four pilot surface to in-seam well pairs were successfully drilled and commissioned in 2012 and 2013. Based on the performance of these pilots, further development of the coal seam gas field converted from stimulated vertical wells to horizontal wells from 2015 onwards. Surface-in-seam (SIS), high-angle-sump-horizontals (HASH), and multi-laterals wells drilled with coil tubing technologies were implemented in the field. The paper describes horizontal wells drilling, completion and geo-steering technology. The optimal operational strategies of horizontal wells are also described and the production performance of horizontal wells are compared to the vertical well performance. The key factors contributing to the success of horizontal drilling in the field are presented.","PeriodicalId":11182,"journal":{"name":"Day 3 Thu, October 25, 2018","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2018-10-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Increasing Coal Seam Gas Field Productivity with Horizontal Well Technology: A Case Study\",\"authors\":\"Xuejun Lin, G. Sutherland, D. Cumming, B. Thomas, A. Sani\",\"doi\":\"10.2118/192114-MS\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n A Coal Seam Gas Field, operated by Origin Energy as upstream operator of the APLNG project in Queensland, Australia has been on commercial production since 2005. From inception to 2012 the development concept used vertical cavitated wells or vertical fracture stimulated wells. Four pilot surface to in-seam well pairs were successfully drilled and commissioned in 2012 and 2013. Based on the performance of these pilots, further development of the coal seam gas field converted from stimulated vertical wells to horizontal wells from 2015 onwards. Surface-in-seam (SIS), high-angle-sump-horizontals (HASH), and multi-laterals wells drilled with coil tubing technologies were implemented in the field. The paper describes horizontal wells drilling, completion and geo-steering technology. The optimal operational strategies of horizontal wells are also described and the production performance of horizontal wells are compared to the vertical well performance. The key factors contributing to the success of horizontal drilling in the field are presented.\",\"PeriodicalId\":11182,\"journal\":{\"name\":\"Day 3 Thu, October 25, 2018\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-10-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 3 Thu, October 25, 2018\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/192114-MS\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Thu, October 25, 2018","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/192114-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Increasing Coal Seam Gas Field Productivity with Horizontal Well Technology: A Case Study
A Coal Seam Gas Field, operated by Origin Energy as upstream operator of the APLNG project in Queensland, Australia has been on commercial production since 2005. From inception to 2012 the development concept used vertical cavitated wells or vertical fracture stimulated wells. Four pilot surface to in-seam well pairs were successfully drilled and commissioned in 2012 and 2013. Based on the performance of these pilots, further development of the coal seam gas field converted from stimulated vertical wells to horizontal wells from 2015 onwards. Surface-in-seam (SIS), high-angle-sump-horizontals (HASH), and multi-laterals wells drilled with coil tubing technologies were implemented in the field. The paper describes horizontal wells drilling, completion and geo-steering technology. The optimal operational strategies of horizontal wells are also described and the production performance of horizontal wells are compared to the vertical well performance. The key factors contributing to the success of horizontal drilling in the field are presented.