{"title":"北马来盆地MTJDA地区高温高压、高CO2-H2S环境下MUFFIN-X评价井成功配管柱测试作业综述","authors":"Avidianto Suryo Setiawan, Sippakorn Apiwathanasorn","doi":"10.4043/31590-ms","DOIUrl":null,"url":null,"abstract":"\n This paper will share a success story of a well-test operation performed on MUFFIN-X, an appraisal well located at the northern part of the Malaysia-Thailand Joint Development Area (MTJDA). The well was drilled in Q4-2020 and penetrated two fault blocks of northern MTJDA to appraise the area for further field development study and proposal. The objective of the test itself is to acquire new data to reduce the subsurface uncertainties and unlock the gas potential from deep formations of the area, which is well known for its multilayer reservoirs, High Pressure-High Temperature (HPHT), and high CO2-H2S content. These conditions are the key challenges to developing the area. To cope with the challenges, Carigali-PTTEPI Operating Company (CPOC) has been using a Tubing-Stem-Test (TST) approach that provides secured wellbore conditions and multiple accessibilities to multiple reservoirs, straightforward operation, and realistic production simulation. The TST of MUFFIN-X was designed to complete each zone within 24-to-36 hours for deliverability and pressure transient tests. The TST performed on MUFFIN-X has successfully unlocked 20 MMscf/d of gas and 5000 bbl/d of oil potentials from the deep formations of the block. The job was completed 16 hours earlier than the design, bringing approximately 40K USD of cost optimization.","PeriodicalId":11081,"journal":{"name":"Day 2 Wed, March 23, 2022","volume":"380 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-03-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"An Overview of Successful Fit to Purpose Tubing Stem Test Operation on MUFFIN-X Appraisal Well to Unlock Gas Potential of Deep Formation with HPHT & High CO2-H2S Environment in MTJDA, North Malay Basin\",\"authors\":\"Avidianto Suryo Setiawan, Sippakorn Apiwathanasorn\",\"doi\":\"10.4043/31590-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n This paper will share a success story of a well-test operation performed on MUFFIN-X, an appraisal well located at the northern part of the Malaysia-Thailand Joint Development Area (MTJDA). The well was drilled in Q4-2020 and penetrated two fault blocks of northern MTJDA to appraise the area for further field development study and proposal. The objective of the test itself is to acquire new data to reduce the subsurface uncertainties and unlock the gas potential from deep formations of the area, which is well known for its multilayer reservoirs, High Pressure-High Temperature (HPHT), and high CO2-H2S content. These conditions are the key challenges to developing the area. To cope with the challenges, Carigali-PTTEPI Operating Company (CPOC) has been using a Tubing-Stem-Test (TST) approach that provides secured wellbore conditions and multiple accessibilities to multiple reservoirs, straightforward operation, and realistic production simulation. The TST of MUFFIN-X was designed to complete each zone within 24-to-36 hours for deliverability and pressure transient tests. The TST performed on MUFFIN-X has successfully unlocked 20 MMscf/d of gas and 5000 bbl/d of oil potentials from the deep formations of the block. The job was completed 16 hours earlier than the design, bringing approximately 40K USD of cost optimization.\",\"PeriodicalId\":11081,\"journal\":{\"name\":\"Day 2 Wed, March 23, 2022\",\"volume\":\"380 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-03-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Wed, March 23, 2022\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4043/31590-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Wed, March 23, 2022","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4043/31590-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文将分享位于马来西亚-泰国联合开发区(MTJDA)北部的一口评价井MUFFIN-X试井的成功案例。该井于2020年第四季度钻探,并穿透了MTJDA北部的两个断块,以评估该地区,以便进一步进行油田开发研究和建议。测试本身的目的是获取新的数据,以减少地下的不确定性,并释放该地区深层地层的天然气潜力,该地区以其多层储层、高压高温(HPHT)和高CO2-H2S含量而闻名。这些条件是发展该地区的主要挑战。为了应对这些挑战,Carigali-PTTEPI运营公司(CPOC)一直在使用管柱测试(TST)方法,该方法提供了安全的井眼条件和多个储层的多个可达性,操作简单,并进行了真实的生产模拟。MUFFIN-X的TST设计为在24- 36小时内完成每个层的产能和压力瞬态测试。在MUFFIN-X上进行的TST已经成功地从区块的深层地层中释放了2000万立方英尺/天的天然气和5000桶/天的石油潜力。该工作比设计提前16个小时完成,带来了约40K美元的成本优化。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
An Overview of Successful Fit to Purpose Tubing Stem Test Operation on MUFFIN-X Appraisal Well to Unlock Gas Potential of Deep Formation with HPHT & High CO2-H2S Environment in MTJDA, North Malay Basin
This paper will share a success story of a well-test operation performed on MUFFIN-X, an appraisal well located at the northern part of the Malaysia-Thailand Joint Development Area (MTJDA). The well was drilled in Q4-2020 and penetrated two fault blocks of northern MTJDA to appraise the area for further field development study and proposal. The objective of the test itself is to acquire new data to reduce the subsurface uncertainties and unlock the gas potential from deep formations of the area, which is well known for its multilayer reservoirs, High Pressure-High Temperature (HPHT), and high CO2-H2S content. These conditions are the key challenges to developing the area. To cope with the challenges, Carigali-PTTEPI Operating Company (CPOC) has been using a Tubing-Stem-Test (TST) approach that provides secured wellbore conditions and multiple accessibilities to multiple reservoirs, straightforward operation, and realistic production simulation. The TST of MUFFIN-X was designed to complete each zone within 24-to-36 hours for deliverability and pressure transient tests. The TST performed on MUFFIN-X has successfully unlocked 20 MMscf/d of gas and 5000 bbl/d of oil potentials from the deep formations of the block. The job was completed 16 hours earlier than the design, bringing approximately 40K USD of cost optimization.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信