连接点:多层油藏水平井多级压裂的经验教训

A. Al Shueili, M. Jaboob, Hussain Al Salmi
{"title":"连接点:多层油藏水平井多级压裂的经验教训","authors":"A. Al Shueili, M. Jaboob, Hussain Al Salmi","doi":"10.2118/205302-ms","DOIUrl":null,"url":null,"abstract":"\n Efficient multistage hydraulic fracturing in horizontal wells in tight-gas formations with multilayered and laminated reservoirs is a very challenging subject matter; due to formation structure, required well trajectory, and the ability to establish a conductive and permanent connection between all the layers. BP Oman had initiated the technical journey to deliver an effective horizontal well multistage frac design through learnings obtained during three key pilot horizontal wells. Since these initial wells, additional candidates have been drilled and stimulated, resulting in further advancement of the learning curve.\n Many aspects will be covered in this paper, that will describe how to facilitate the most effective hydraulic fracture placement and production performance, under these laminated conditions. These approaches will include the completion and perforation selection, fracture initiation zone selection, fracture height consideration, frac fluid type and design. The paper will go on to describe a range of different surveillance options, including clean-up and performance surveillance as well as number of other factors.\n The experiences that have been gained provide valuable insight and learning about how to approach a multistage fracturing horizontal well program in this kind of depositional environment. Additionally, how these lessons can potentially be subsequently adapted and applied to access resources in the more challenging and higher risk areas of the field. For example, this paper will present direct comparison of over and under-displaced stages; differences in execution and production for cased hole and open hole completions; and many other variables that always under discussion for hydraulic fracturing in horizontal wells.\n This paper describes in detail the results of many multistage fracturing trials by BP Oman in horizontal wells drilled in challenging multilayered and laminated tight-gas reservoirs. These findings may help to cut short learning curve in similar reservoirs in the Middle East Region and elsewhere.","PeriodicalId":11171,"journal":{"name":"Day 3 Thu, January 13, 2022","volume":"4 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-01-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Connecting the Dots: Multistage Fracturing in Horizontal Wells with Multilayered Reservoirs - Lessons Learned\",\"authors\":\"A. Al Shueili, M. Jaboob, Hussain Al Salmi\",\"doi\":\"10.2118/205302-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Efficient multistage hydraulic fracturing in horizontal wells in tight-gas formations with multilayered and laminated reservoirs is a very challenging subject matter; due to formation structure, required well trajectory, and the ability to establish a conductive and permanent connection between all the layers. BP Oman had initiated the technical journey to deliver an effective horizontal well multistage frac design through learnings obtained during three key pilot horizontal wells. Since these initial wells, additional candidates have been drilled and stimulated, resulting in further advancement of the learning curve.\\n Many aspects will be covered in this paper, that will describe how to facilitate the most effective hydraulic fracture placement and production performance, under these laminated conditions. These approaches will include the completion and perforation selection, fracture initiation zone selection, fracture height consideration, frac fluid type and design. The paper will go on to describe a range of different surveillance options, including clean-up and performance surveillance as well as number of other factors.\\n The experiences that have been gained provide valuable insight and learning about how to approach a multistage fracturing horizontal well program in this kind of depositional environment. Additionally, how these lessons can potentially be subsequently adapted and applied to access resources in the more challenging and higher risk areas of the field. For example, this paper will present direct comparison of over and under-displaced stages; differences in execution and production for cased hole and open hole completions; and many other variables that always under discussion for hydraulic fracturing in horizontal wells.\\n This paper describes in detail the results of many multistage fracturing trials by BP Oman in horizontal wells drilled in challenging multilayered and laminated tight-gas reservoirs. These findings may help to cut short learning curve in similar reservoirs in the Middle East Region and elsewhere.\",\"PeriodicalId\":11171,\"journal\":{\"name\":\"Day 3 Thu, January 13, 2022\",\"volume\":\"4 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-01-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 3 Thu, January 13, 2022\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/205302-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Thu, January 13, 2022","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/205302-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

多层和层状致密气储层水平井多级高效水力压裂是一个非常具有挑战性的课题;由于地层结构、所需的井眼轨迹以及在所有层之间建立导电和永久连接的能力。BP阿曼公司已经开始了一项技术之旅,通过在三个关键的试验水平井中获得的经验,提供有效的水平井多级压裂设计。自这些最初的井以来,又钻了更多的候选井并进行了增产,从而进一步提高了学习曲线。本文将涉及许多方面,描述如何在这些层压条件下促进最有效的水力裂缝放置和生产性能。这些方法包括完井和射孔选择、裂缝起裂区选择、裂缝高度考虑、压裂液类型和设计。本文将继续描述一系列不同的监督选择,包括清理和绩效监督以及许多其他因素。所获得的经验为如何在这种沉积环境下进行多级压裂水平井规划提供了宝贵的见解和学习。此外,如何将这些经验教训应用于更具挑战性和高风险地区的资源获取。例如,本文将直接比较位移过大和位移不足的阶段;套管井和裸眼完井的执行和产量差异;对于水平井水力压裂,还有很多其他的变量。本文详细介绍了BP阿曼公司在具有挑战性的多层和层状致密气藏的水平井中进行的多次多级压裂试验结果。这些发现可能有助于缩短中东地区和其他地区类似油藏的学习曲线。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Connecting the Dots: Multistage Fracturing in Horizontal Wells with Multilayered Reservoirs - Lessons Learned
Efficient multistage hydraulic fracturing in horizontal wells in tight-gas formations with multilayered and laminated reservoirs is a very challenging subject matter; due to formation structure, required well trajectory, and the ability to establish a conductive and permanent connection between all the layers. BP Oman had initiated the technical journey to deliver an effective horizontal well multistage frac design through learnings obtained during three key pilot horizontal wells. Since these initial wells, additional candidates have been drilled and stimulated, resulting in further advancement of the learning curve. Many aspects will be covered in this paper, that will describe how to facilitate the most effective hydraulic fracture placement and production performance, under these laminated conditions. These approaches will include the completion and perforation selection, fracture initiation zone selection, fracture height consideration, frac fluid type and design. The paper will go on to describe a range of different surveillance options, including clean-up and performance surveillance as well as number of other factors. The experiences that have been gained provide valuable insight and learning about how to approach a multistage fracturing horizontal well program in this kind of depositional environment. Additionally, how these lessons can potentially be subsequently adapted and applied to access resources in the more challenging and higher risk areas of the field. For example, this paper will present direct comparison of over and under-displaced stages; differences in execution and production for cased hole and open hole completions; and many other variables that always under discussion for hydraulic fracturing in horizontal wells. This paper describes in detail the results of many multistage fracturing trials by BP Oman in horizontal wells drilled in challenging multilayered and laminated tight-gas reservoirs. These findings may help to cut short learning curve in similar reservoirs in the Middle East Region and elsewhere.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信