评价伊拉克住宅综合体项目融资方式的有效性

IF 1.5 0 ENGINEERING, MULTIDISCIPLINARY
A. S. Khameesa, Meervat R. Altaie
{"title":"评价伊拉克住宅综合体项目融资方式的有效性","authors":"A. S. Khameesa, Meervat R. Altaie","doi":"10.48084/etasr.4663","DOIUrl":null,"url":null,"abstract":"Financial funding of a construction firm plays an important role in all aspects of the process development. It has been noted that financial crises have a direct impact on the construction industry. The Iraqi government, whether locally or globally, has faced a severe shortage of financing which has resulted in incomplete projects. Due to the financial crisis that Iraq went through which led to the suspension of many residential complex projects and the difficulty of the use of public financing methods, we researched the private financing (public-private partnership) methods instead of public financing methods in residential complex projects implementation. This study verified the financial problems and the factors that relate to the possibility of their occurrence with the use of a questionnaire that was designed and distributed to professionals in the field. Arbitration of the questionnaire, pilot study, questionnaire distribution, and statistical tests were conducted. The T-test (paired samples T-test) was used to find out if there are differences between the public and private financing methods. The results showed that the private financing (public-private partnership) methods, under the current conditions in Iraq, are better than the public financing methods.","PeriodicalId":11826,"journal":{"name":"Engineering, Technology & Applied Science Research","volume":null,"pages":null},"PeriodicalIF":1.5000,"publicationDate":"2022-02-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Evaluating the Efficiency of Finance Methods in Residential Complex Projects in Iraq\",\"authors\":\"A. S. Khameesa, Meervat R. Altaie\",\"doi\":\"10.48084/etasr.4663\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Financial funding of a construction firm plays an important role in all aspects of the process development. It has been noted that financial crises have a direct impact on the construction industry. The Iraqi government, whether locally or globally, has faced a severe shortage of financing which has resulted in incomplete projects. Due to the financial crisis that Iraq went through which led to the suspension of many residential complex projects and the difficulty of the use of public financing methods, we researched the private financing (public-private partnership) methods instead of public financing methods in residential complex projects implementation. This study verified the financial problems and the factors that relate to the possibility of their occurrence with the use of a questionnaire that was designed and distributed to professionals in the field. Arbitration of the questionnaire, pilot study, questionnaire distribution, and statistical tests were conducted. The T-test (paired samples T-test) was used to find out if there are differences between the public and private financing methods. The results showed that the private financing (public-private partnership) methods, under the current conditions in Iraq, are better than the public financing methods.\",\"PeriodicalId\":11826,\"journal\":{\"name\":\"Engineering, Technology & Applied Science Research\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.5000,\"publicationDate\":\"2022-02-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Engineering, Technology & Applied Science Research\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.48084/etasr.4663\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"0\",\"JCRName\":\"ENGINEERING, MULTIDISCIPLINARY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering, Technology & Applied Science Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.48084/etasr.4663","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"0","JCRName":"ENGINEERING, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 1

摘要

建筑企业的财务资金在建设过程发展的各个方面都起着重要的作用。有人指出,金融危机对建筑业有直接影响。伊拉克政府,无论是在当地还是在全球,都面临着严重的资金短缺,导致项目不完整。由于伊拉克经历的金融危机导致许多住宅综合体项目暂停,以及公共融资方式难以使用,我们研究了私人融资(公私合作)方式代替公共融资方式在住宅综合体项目实施中。这项研究使用了一份设计并分发给该领域专业人员的调查表,核实了财务问题以及与这些问题发生的可能性有关的因素。进行问卷仲裁、初步研究、问卷分发和统计检验。使用t检验(配对样本t检验)来发现公共和私人融资方式之间是否存在差异。结果表明,在伊拉克当前条件下,民间融资(公私合作)方式优于公共融资方式。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Evaluating the Efficiency of Finance Methods in Residential Complex Projects in Iraq
Financial funding of a construction firm plays an important role in all aspects of the process development. It has been noted that financial crises have a direct impact on the construction industry. The Iraqi government, whether locally or globally, has faced a severe shortage of financing which has resulted in incomplete projects. Due to the financial crisis that Iraq went through which led to the suspension of many residential complex projects and the difficulty of the use of public financing methods, we researched the private financing (public-private partnership) methods instead of public financing methods in residential complex projects implementation. This study verified the financial problems and the factors that relate to the possibility of their occurrence with the use of a questionnaire that was designed and distributed to professionals in the field. Arbitration of the questionnaire, pilot study, questionnaire distribution, and statistical tests were conducted. The T-test (paired samples T-test) was used to find out if there are differences between the public and private financing methods. The results showed that the private financing (public-private partnership) methods, under the current conditions in Iraq, are better than the public financing methods.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Engineering, Technology & Applied Science Research
Engineering, Technology & Applied Science Research ENGINEERING, MULTIDISCIPLINARY-
CiteScore
3.00
自引率
46.70%
发文量
222
审稿时长
11 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信