{"title":"基于COBIT框架的数据中心风险分析","authors":"Arini Arini, Luh Kesuma Wardhani, Iik Muhamad Malik Matin","doi":"10.15575/JOIN.V3I2.226","DOIUrl":null,"url":null,"abstract":"Information Technology Governance in UIN Jakarta is the responsibility of the Pusat Teknologi Informasi dan Pangkalan Data (Pustipanda). Some troubles have occurred in the data center Pustipanda, among others the loss of courses and its values that have been inputted in the application of Academic Information System (AIS), loss of data that has been inputted on the application Beban Kinerja Dosen (BKD), damage data content on the portal in the environment UIN Jakarta. Risk analysis is needed to identify and anticipate and minimize risks which may occur. In this research, the risk analysis is using the COBIT 4.1 framework that is in the PO9 process (Manage and Assess IT Risk) as input towards PO9 is the domain of PO1, PO10, DS2, DS4, DS5, ME1, and ME4. Questionnaires which were distributed to respondents were developed from input variables. Respondents were chosen by purposive sampling method. The results of the questionnaire were recapitulated and calculated the value and degree of capability. The result of this research is the level of domain capability in data center Pustipanda is at level 2 (managed) with value 1.91. A fairly low value is obtained on DS4, DS5 and ME1 domains, which are 1.67, 1.88 and 0.67. Arosen risks from the majority of data center risk assessment were the absence of documented policies and procedure and lack of training for risk management measures at Pustipanda data center.","PeriodicalId":32019,"journal":{"name":"JOIN Jurnal Online Informatika","volume":"85 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Data Center Risks Analysis Through The COBIT Framework 4.1\",\"authors\":\"Arini Arini, Luh Kesuma Wardhani, Iik Muhamad Malik Matin\",\"doi\":\"10.15575/JOIN.V3I2.226\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Information Technology Governance in UIN Jakarta is the responsibility of the Pusat Teknologi Informasi dan Pangkalan Data (Pustipanda). Some troubles have occurred in the data center Pustipanda, among others the loss of courses and its values that have been inputted in the application of Academic Information System (AIS), loss of data that has been inputted on the application Beban Kinerja Dosen (BKD), damage data content on the portal in the environment UIN Jakarta. Risk analysis is needed to identify and anticipate and minimize risks which may occur. In this research, the risk analysis is using the COBIT 4.1 framework that is in the PO9 process (Manage and Assess IT Risk) as input towards PO9 is the domain of PO1, PO10, DS2, DS4, DS5, ME1, and ME4. Questionnaires which were distributed to respondents were developed from input variables. Respondents were chosen by purposive sampling method. The results of the questionnaire were recapitulated and calculated the value and degree of capability. The result of this research is the level of domain capability in data center Pustipanda is at level 2 (managed) with value 1.91. A fairly low value is obtained on DS4, DS5 and ME1 domains, which are 1.67, 1.88 and 0.67. Arosen risks from the majority of data center risk assessment were the absence of documented policies and procedure and lack of training for risk management measures at Pustipanda data center.\",\"PeriodicalId\":32019,\"journal\":{\"name\":\"JOIN Jurnal Online Informatika\",\"volume\":\"85 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-02-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"JOIN Jurnal Online Informatika\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.15575/JOIN.V3I2.226\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"JOIN Jurnal Online Informatika","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.15575/JOIN.V3I2.226","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

雅加达大学的信息技术治理由雅加达大学信息技术研究所(Pustipanda)负责。Pustipanda数据中心出现了一些问题,其中包括在学术信息系统(AIS)应用程序中输入的课程及其值丢失,在Beban Kinerja Dosen (BKD)应用程序中输入的数据丢失,雅加达环境中门户网站上的数据内容损坏。风险分析是识别、预测和减少可能发生的风险所必需的。在本研究中,风险分析使用PO9过程中的COBIT 4.1框架(管理和评估IT风险)作为PO9的输入,PO9是PO1、PO10、DS2、DS4、DS5、ME1和ME4的域。分发给受访者的问卷是根据输入变量开发的。调查对象采用目的抽样法。总结问卷调查结果,计算能力值和能力度。研究结果表明,数据中心Pustipanda的域能力水平为2级(管理),其值为1.91。DS4、DS5和ME1结构域的值较低,分别为1.67、1.88和0.67。大多数数据中心风险评估的主要风险是缺乏文件化的政策和程序,以及缺乏对Pustipanda数据中心风险管理措施的培训。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Data Center Risks Analysis Through The COBIT Framework 4.1
Information Technology Governance in UIN Jakarta is the responsibility of the Pusat Teknologi Informasi dan Pangkalan Data (Pustipanda). Some troubles have occurred in the data center Pustipanda, among others the loss of courses and its values that have been inputted in the application of Academic Information System (AIS), loss of data that has been inputted on the application Beban Kinerja Dosen (BKD), damage data content on the portal in the environment UIN Jakarta. Risk analysis is needed to identify and anticipate and minimize risks which may occur. In this research, the risk analysis is using the COBIT 4.1 framework that is in the PO9 process (Manage and Assess IT Risk) as input towards PO9 is the domain of PO1, PO10, DS2, DS4, DS5, ME1, and ME4. Questionnaires which were distributed to respondents were developed from input variables. Respondents were chosen by purposive sampling method. The results of the questionnaire were recapitulated and calculated the value and degree of capability. The result of this research is the level of domain capability in data center Pustipanda is at level 2 (managed) with value 1.91. A fairly low value is obtained on DS4, DS5 and ME1 domains, which are 1.67, 1.88 and 0.67. Arosen risks from the majority of data center risk assessment were the absence of documented policies and procedure and lack of training for risk management measures at Pustipanda data center.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
2
审稿时长
12 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信