马来西亚电力系统的可用传输能力评估

Muhammad Murtadha Othman, A. Mohamed, A. Hussein
{"title":"马来西亚电力系统的可用传输能力评估","authors":"Muhammad Murtadha Othman, A. Mohamed, A. Hussein","doi":"10.1109/SCORED.2002.1033088","DOIUrl":null,"url":null,"abstract":"In the deregulated power system, it is important to accurately and rapidly quantify the available transfer capability (ATC) of the transmission system. This paper presents a case study of the ATC assessment on the Malaysian power system. The ATC is evaluated using both the proposed quadratic sensitivity method and the AC power flow method. The ATC are evaluated by considering both the point-to-point transfer and the area-to-area transfer. Initially, contingency screening and ranking techniques are used to define the critical lines in the system and these lines are considered in the ATC assessment. Numerous simulations have been carried out to calculate the ATCs by considering voltage and line security limits as well as voltage stability limits. Simulation results are analyzed with regard to the effectiveness and accuracy of the proposed quadratic sensitivity and the AC power flow methods.","PeriodicalId":6865,"journal":{"name":"2016 IEEE Student Conference on Research and Development (SCOReD)","volume":"326 1","pages":"184-187"},"PeriodicalIF":0.0000,"publicationDate":"2002-11-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Available transfer capability assessment of the Malaysian power system\",\"authors\":\"Muhammad Murtadha Othman, A. Mohamed, A. Hussein\",\"doi\":\"10.1109/SCORED.2002.1033088\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In the deregulated power system, it is important to accurately and rapidly quantify the available transfer capability (ATC) of the transmission system. This paper presents a case study of the ATC assessment on the Malaysian power system. The ATC is evaluated using both the proposed quadratic sensitivity method and the AC power flow method. The ATC are evaluated by considering both the point-to-point transfer and the area-to-area transfer. Initially, contingency screening and ranking techniques are used to define the critical lines in the system and these lines are considered in the ATC assessment. Numerous simulations have been carried out to calculate the ATCs by considering voltage and line security limits as well as voltage stability limits. Simulation results are analyzed with regard to the effectiveness and accuracy of the proposed quadratic sensitivity and the AC power flow methods.\",\"PeriodicalId\":6865,\"journal\":{\"name\":\"2016 IEEE Student Conference on Research and Development (SCOReD)\",\"volume\":\"326 1\",\"pages\":\"184-187\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2002-11-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2016 IEEE Student Conference on Research and Development (SCOReD)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SCORED.2002.1033088\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 IEEE Student Conference on Research and Development (SCOReD)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SCORED.2002.1033088","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在放松管制的电力系统中,准确、快速地量化输电系统的可用输电能力(ATC)是非常重要的。本文介绍了马来西亚电力系统ATC评估的一个案例研究。采用二次灵敏度法和交流潮流法对ATC进行了评估。通过考虑点到点传输和区域到区域传输来评估ATC。最初,使用应急筛选和排序技术来确定系统中的关键线路,并在ATC评估中考虑这些线路。在考虑电压和线路安全限值以及电压稳定限值的情况下,进行了大量的仿真计算。仿真结果分析了所提出的二次灵敏度法和交流潮流法的有效性和准确性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Available transfer capability assessment of the Malaysian power system
In the deregulated power system, it is important to accurately and rapidly quantify the available transfer capability (ATC) of the transmission system. This paper presents a case study of the ATC assessment on the Malaysian power system. The ATC is evaluated using both the proposed quadratic sensitivity method and the AC power flow method. The ATC are evaluated by considering both the point-to-point transfer and the area-to-area transfer. Initially, contingency screening and ranking techniques are used to define the critical lines in the system and these lines are considered in the ATC assessment. Numerous simulations have been carried out to calculate the ATCs by considering voltage and line security limits as well as voltage stability limits. Simulation results are analyzed with regard to the effectiveness and accuracy of the proposed quadratic sensitivity and the AC power flow methods.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信